ML20042E974

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 90-054 W/Util on 900427 in Region I Ofc to Discuss Status of Licensee Action Plan for Improving Engineering Support at Plant
ML20042E974
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/19/1990
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9005070050
Download: ML20042E974 (2)


Text

......_ _ _ _ -._

l 19 APR 1990 No. 90 054 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Philadelphia Electric Company t

Facility:

Limerick Units 1 and 2 -

Docket Nos:.

50-352/50-353 Time and Date:

2:00 p.m., April 27, 1990 Location:

DRP Conference Room, Region I King of Prussia, PA

Purpose:

Management Meeting to Discuss the Status of the Licensee's Action Plan for Improving Engineering Support at Limerick NRC Attendees:

J. Wiggins, Deputy Director, Division of Reactor Projects (DRP)

R. Blough, Chief, Projects Branch No. 2, DRP~

J. Durr, Chief Engineering Branch, Division of Reactor Safety (DRS)

L. Doerflein, Chief, Reactor Projects Section 2B, DRP T. Kenny, Senior Resident Inspector R. Clark, Project Manager, PDI-2, NRR Licensee Attendees: D. Helwig,.Vice President Nuclear Engineering and Services G. Leitch, Vice President Limerick M. McCormick, Plant Manager L. Pyrih, Manager, Engineering Division Others Note:

Attendance by NRC personnel at this meeting should be made known by 4:00 p.m. on April 25, 1990 via telephone call to L. T. Doerflein, Region I, at FTS 8-346-5378 or Commercial 215-337-5378.

0; tinel ennd by A. Randy B!ough Prepared by:

Lawrence T. Doerflein, Chief, RPS 2B 0FFICIAL RECORD COPY MEETING MOTICE 90-054 - 0001.0.0 9005070030 900419

~

PDR ADOCK 05000352 P

PDC gp

l 19 APR 1980 Distribution:

J. M. Taylor, Executive Director for Operations J. H. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

=

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B. K. Grimes, Acting Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement c

T. E. Murley, Director, Office of Nuclear Reactor Regulation F. J. Miraglia, Associate Director for Inspection and Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR J. Caldwell, Regional Coordinator, EDO

=

S. Varga, Director, Division of Reactor Projects - I/II, NRR

=

W. Butler, Director, Project Directorate I-2, NRR' R. Clark, Project Manager, PD I-2, NRR

=-

W. Bateman, Chief, PQEB Section A, NRR Public Document Room (PDR) local Public Document Room (LPOR)

Commonwealth of Pennsylvania

=

bec:

i Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

M. Miller, RI Region I Receptionist DRMA Files DRP Files 2

Bulletin Board M. J. DiDonato, DRP RI:DRP RI:DRP RI:DRP J akoski/rh1 LDoerflein RBlough 4/Ii/90 4//'//90 4////90 0FFICIAL RECORD COPY MEETING NOTICE 90-054 - 0002.0.0 04/19/90

,..