ML20042E879

From kanterella
Jump to navigation Jump to search

Responds to NRC Bulletin 88-005,Suppl 2 Re Maint of Document for Specific Actions Taken for Identified Matls.Util Has Not Identified Any Matls Which Will Be Retained Until Further Notice by Nrc.Untested Matl Tagged & Being Retained
ML20042E879
Person / Time
Site: Beaver Valley
Issue date: 09/02/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-005, IEB-88-5, TAC-68734, TAC-68735, NUDOCS 9005030349
Download: ML20042E879 (3)


Text

--

4 I

a s

4 -

P OA Sh opngport. PA 150774004 j

07.2 L %

mwmss -

September 2, 1988' i

U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 2' Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66.

Response to NRCB 88-05 (TAC 68734 and 68735) er The following information is provided 'in response to requested actions and reporting requirements of Supplement 2 to NRCB 88-05.

Action Requested:

Addressees are requested to maintain. for -inspection-the documentation of the specific actions taken for the: identified materials.

Response

DLC will maintain documentation available for NRC examination.

Action Requested:

Addressees are requested to retain nonconforming materials until advised further by the NRC.

Response

Since testing activities were suspended prior to identifying any materials which do not meet the NUMARC criteria, DLC has not' identified any materials which will be retained for this purpose.

Untested material in the Warehouse has been tagged and is.being retained and withheld from use.

T EP'nEfc5 Mih!4 fe 9

c._..._

.A 4*

'U.

S. NuclGer Rsgulatory Commiccion 4

R20ponco to NRCB 88-05 Page 2 Action Requested:

Addressees are encouraged to report the results of tests of PSI and WJM supplied flanges and fittings to the INPO Nuclear Network for dissemination to the industry.

Response

DLC is providing information within its completed scope of work as part of the industry database being assembled by NUMARC.

Reporting Requirement:

Holders of full power operating licenses are required to report the results of their records

review, testing, and analysis performed as of the date of this supplement in accordance with the 120 day reporting requirement-specified in paragraph'l of Bulletin 88-05.

Response

By August 3,

1988, DLC had identified no= stock or installed WJM/ PSI /CLM materials for BVPS-1.

A total of 3464 items on 2338 purchase orders. were identified as flanges or fittings.

Review of these orders was 57%

complete on August 10, 1988.

The necessity for testing or analysis was suspended due to issuance of Supplement 2 of the bulletin.

Materials installed in safety related systems at BVPS-2 and known on August 3,

1988 are listed on Attachment 1.

The locations of these items =were identified on July 26 and testing preparations were in progress, but no testing had begun.

All actions with regard to previous versions of this Bulletin have ceased with the exception of records search activities.

DLC currently plans to complete the search and await the results of NRC review of the NUMARC proposals.

Sincerely,

. D. Sicher Vice President Nuclear Group cc:

Mr. J. Beall, Sr. Resident Inspector Mr rW.ET.7 Russell,~NRC_ Region I Administrator Mr.2P.JTam,iProject: Manager l7 o

- s s

m ATTACesess? 1 SSCS-80-05 Safety-telated Ceeposeats - U.rit 2 STFS 1

.s d

LOCATIOW DESCRIPTION SPEC.

TENDOR SEAT 50.

eLSS./SYS.

1 Set 4"

Orifice Flange SA-105 McJunkin 71 nsCv/$ws wN, 3000 1 - 30* wm Flange Std.

SA-105 Standard Pipe and W8-7372 Tard/sws supply 1 Set 4*

Orifice Flange S A-10 5 Guyen Alters 71 MSCv/$ws wN, 360s 1 set 2*

Orifice Flange SA-105 Capitel Pipe and 15 Aum. s t dg./r.ws Steel Freducts WN RF 3000 1 Es.

3*

orifice Flange SA-105 Capitel Pipe and 45271 Aus. 31dg./SwS

' Steel Freducts wN RF 3000 1 Set 2*

Orifice Flange SA-105 ncJunkia 2167 neactor/CCF WM RF 15068 1 Set 2*

erifice Flange SA-105 Capitel Pipe and 2666 MSCV/CCF 3

Steel Freducts S.O.

RF l

0 m-w

~

~

.. ~......

-.mm

.mm

,