Application for Amend to License NPF-4,allowing one-time Extension of Surveillance Test Intervals as Specified in Tech Specs for Eighth Cycle of Operation
ML20042E876
Person / Time
Site: North Anna 
Issue date: 04/27/1990
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20042E877 List:
References
90-156, NUDOCS 9005030339
Download: ML20042E876 (6)


Text

{{#Wiki_filter:.. E r 4. + VIRGINIA ELEC71t!C' AND POWER COMPANY i RICHMOND, VIRGINIA 23261 i 5 April 27, 1990 a U.S. Nuclear Regulatory Commission Serial No. '90-156 . Attention: Document Control Desk NAPS /CSW:csw Washington, D.C. 20555 Docket No. 50-338-License No. NPF-4 Gentfernen: I VIRGINIA ELECTRIC AND POWER COMPANY i NORTH' ANNA POWER STATION UNIT 1 QNE-TIME EXTENSION TO CERTAIN SURVEILLANCE TESTS Pursuant to 10 CFR 50.90, Virginia Electric and Power requests an amendment, in the form of a license condition, to Operating License NPF-4 for North Anna Unit 1. We request the proposed amendment to be approved for implementation during the next refueling _ outage 'for unit 1, which is 1 scheduled to begin in February 1991. A l The proposed license condition allows a one time extension of the l-surveillance test intervals for certain surveillance tests-as specified in the North Anna Unit 1 Technical Specifications for the-eighth cycle - of operation. A discussion of the requested extension is included in the attachment. l This license change request has been reviewed by the Station Nuclear L Safety and Operating Committee. It has been determined that the-request may involve an unreviewad safety question as defined in 10~ CFR 50.59 because the margin of safety of Technical Specification 4.0.2, the l administrative control specification of surveillance intervals, has been l reduced, but technically and operationally the request has been evaluated l and determined to not involve a significant hazards consideration as L defined in 10 CFR 50.92. if you have any. questions or require additional information, please contact us. g?ElaE@!* vl P l ,f \\'

- :o ) =. 1Very truly yours, ($ L-W. L. Stewart L ' Senior Vice President - Nuclear ; l 1 Attachments l'

1) Proposed Technical Specification Change
2) Discussion of Proposed Change
3) 10 CFR 50.92 Evaluation cc:

U.S. Nuclear Regulatoif Commission Region ll ~~ - 101 Marietta Street, N.W. Suite 2900 s.. - Atlanta,' Georgia:. 30323 Mr. M; S. Lesser NRC Seninr Resident inspector North Anna Power Station Commissioner Department of Health Room 400 109 Governor Street l-Richmond, Virginia 23219 l 9-i + h 1 -l

e i ot :, 3 -i COMMONWEALTHOFVIRGINIA ) ) COUNTYOF HENRICO- ) i The foregoing document was acknowledged before_ me, in.. and for the County and -Commonwealth aforesaid,- today by W. L. Stewart-who is -Senior i Vice President - Nuclear,' of Virginia Electric;and Power Company. He is-duly authorized to execute and file' the foregoing document -in behalf of that Company, and the statements in'the document are true to'the best of-i his knowledge:and belief.- Acknowledged before me this-2 7 day-of - gall 1990. i My Commission Expires: de 31 . 19h.. i

3 r

8 i ~ i y Notary _.Public L (SEAL) a y, T w

q. v 9 'g a Proposed License Condition North Anna Power -Station Unit 1 a Virginia Electric and Power Company s

~- ". e -V qy x z

x

' 09 s B. A procedure for id9ntifying the auth'ority responsible for the interpretation of the data and the-sequence and timing of administrative events required to !nitiate j corrective action. i

s. The performance of certain surveillance tests at 18i36,'and 60 month intervala to coincide with the normalE18 month--

t refueling cycles shall be extondec by six months for North ~ i Anna Unit 1 seventh cycle only as described in the licensee's letter dated October 19,1988. 4 t. The' performance of certain' surveillance tests at 18 month' i . intervals'to colncide with the normal 118-month. refueling ' cycles shall be extended by six months for North Anna Unit 1-4 eighth cycle only as' described in the licensee's letter dated-April 30,1990, i f 4 (4) The licensee.-is authorized to receive fromithe Surry Nuclear i., Power Station Units No.1 and 2, possess, and store irradiated. Surry fuel assemblies containing special nuclear material, -i enrbhed to not more than 4.1% by weight U-235 subject to the i; following conditions: s .a. Surry fuel asseniblies may not.be-placed in North Arena-Power Station Units No.1 and 2'reectors. 3 ~ b. Irradiated fuel shipped to -No'th Anna.Shall have been 1 1 r removed from the Surry reactors no less than 730 days prior to shipment.

c. No more than 500 Surry' irradiated fuel assemblies shall be receivnd for storage at the Noith Anna Units No. I and 2-spent fuel pool.

E. Phvnical Pmtaction The licences shall fully. implement and maintain in effect all provisions of - the Commission approved phpsbal security, guard t. raining and quellfication, and safeguards contingency --of sthe Miscellaneous 2 - Amendments.and Search Requirements revisions to 10 CFR 73.55 (51' FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54 (p). The plans, which contain Safeguards Information protected [ under 10 CFR 73.21 are'endNd: " North Anna Power Station Security Plan," with revisions submitted tnrough February 24,1988;" North Anna Power Station Guard Training and Qualifica!!cn Plan," with' revisions submitted through May 14, 1987; and " North Anna Power' Station - Safeguard Contingency Plan," with revisions submitted through January 1 ..k ^ _s a \\[ ,u,

.i a '1 J a.. t .* 1 n L t s l l (. -t 1 , 'g i1 1

l J

r t L Discussion of Proposed License-Condition North Anna-. Power Station Unit 1 t d 7 4 1 i 1 I .i k

i.

i -{: t -j4 i f. g. [ -[ p = \\ j' k i $t

q.,

i a: u- .s w. 'g,i + -s. i j s 3 l. k 1 .. r m \\ ., i s. .t v e w o m t.. sl .i 1, t o s 4 si i 'I Virginia' Electric and Power Company ,.j t 0 i

l t

- '\\ .s, n. i\\ I 'il s,3 (\\ - .' (',i 1 - u

.
(i 4' i

[. .N 't 1 , ';t\\ (. ,.s W exv 8 n, O.1a - > L '- .i a L ! - - u .....ui 4 6}}