ML20042C419

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1981
ML20042C419
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/06/1981
From: Linder F
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20042C420 List:
References
LAC-7850, NUDOCS 8203310391
Download: ML20042C419 (1)


Text

,

bymnis, 3 z

\\

D DA/RYLAND h hh COOPERAT/VE eo BoxBi7 2eis EAST AV SOUTH

  • LA CROSSE. WISCONSIN 546G1 (608) 788 4 000 October 6, 1981 In reply, please refer to LAC-7850 DOCKET NO. 50-409 office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 u

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 MONTHLY OPERATING DATA REPORT FOR SEPTEMBER 1981

Reference:

(1)

NRC Letter, Reid to Madgett, dated September 19, 1977.

(2)

NRC Letter, Ried to Madgett, dated December 29, 1977.

(3)

NUREG-0020, Vol. 5, No. 7, July 1981.

Gentlemen:

In accordance with instructions contained in Reference (1) and Technical Specification Amendments contained in Reference (2),

we are submitting information concerning operability and avail-ability of the La Crosse Boiling Water Reactor (LACBWR) for the Month of September 1981.

Reference (3), the July 1981 report on Licensed Operating Reactors, stated that La Crosse was shut down during June for a refueling outage.

The outage was for fuel receipt, rather than refueling.

Please contact us if there are any questions concerning this report.

Very truly yours, DAIRYLAND POWER COOPERATIVE f

/2d W &

4 Frank Linder,-General Manager FL:LSG:af cc:

J.'G.

Keppler, Director, NRC-DRO III f

NRC Resident Inspector

'B203310391 Bi1006

~

[

PDR ADOCK 05000409 R

PDR

_