O Wisconsin Electnc eom courm 211 W. MICHIGAN P 0 BOX 2046. MILWAUME, WI 53201 March 24, 1982 Director of Regulatory Operations q

,.:s U. S. NUCLEAR REGULATORY COMMISSION N

' >s Washington, D. C.

20555 g

s e

d~J >;,.

'~'

[

Gentlemen:

' B-in. ' ' G ;) w a

a C

N '._ ' E

~

MONTilLY OPERATING REPORTS POINT BEACli NUCLEAR PLANT

{..

/>x s[D / L r Due to an error in the computation of the NotJElectrical Energy Generated during November 1981, the following Operating Data Reports for Point Beach Nuclear Plant, Unit 1, are in error and should be corrected as noted below:

Line 18:

Not Electrical Energy Generated Operating Data Report Docket No. 50-266 This Month Year-To-Date C unulative December 10, 1981

-936 2,428,143 34,095,429 (November 1981)

January 29, 1982 2,613,922 34,281,208 (December 1981)

February 9, 1982 34,584,599 (January 1982)

March 8, 1982 34,856,139 (February 1982)

Very truly yours, r i

/

/

Assistant Vice President C. W. Fay g

Copies to J.

G.

Keppler - NRC, Region III

/

NRC Resident Inspector

//O C.

F.

Riederer - PSCW B203300179 820324 PDR ADOCK 05000266 R

PDR