ML20042C087

From kanterella
Jump to navigation Jump to search
Forwards Security Personnel Training & Qualification Plan. Plan Withheld (Ref 10CFR73.21)
ML20042C087
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/19/1982
From: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
FVY-82-29, NUDOCS 8203300174
Download: ML20042C087 (4)


Text

- _ _. _ _ _ _.

MFFRllARM INFORmp 7

J VEIO10NT Y AN K EE N UCLEAR POWER CORPOR ATION SEVENTY SEVEN GROVE STREET 2.C.2.1 RUTI,ANo, VImMONT 057C1 FVY 82-29 REPLY To:

Ma rch 19, 1982 ENGINEERING OFFICE 1671 WORCESTER RO AD FR AMIN GH A M. M ASS ACH USETTS 01701 TELEPlica.Ea 7 872 8100 United States Nuclear Regulatory Commission

[/

j/q)

Washington, D. C. 20555 c

V

/

Attention:

Of fice of Nuclear Reactor Regulation

[/

7 Mr. Domenic B. Vassallo, Chief j

c.,

, i> ;

tj f 0 O

Opera t ing Reac tor Branch #2

-q

/

Division of Operat ing Reac tors Q

' [ - @/o,

6 z

4 v

?.

Re f e re nc es :

(a)

License No. DPR-28 (Docket No. 50-271) 11 N

(b)

Letter, VYNPC to USNRC (WVY 79-19), dated Iuddst 17,.19)

(c)

Letter, USNRC to VYNPC, dated February 25, I98127 (d) Le t t e r, VYNPC to USNRC, dated April 10, 1981 (e) Telephone Conversation, Mr. C. Caskin (USNRC) with Mr. W.

Penniman (VYNPC) of March 10, 1982 Su bj ec t :

Security Personnel Training and Qualification Plan

Dear Sir :

Vermont Yankee submitted Reference (b), a Training and Qualification Plan for Security Personnel, to the NRC for review and subsequently received Re f e re nc e (c) requesting changes and additions to be made to the submitted plan prior to approval.

Ve rmon t Yankee then made a second submittal in Re f e re nc e (d).

Addit ional changes were requested by the NRC via numerous telephone conversations between Mr. B. Manili and Mr. C. Gaskin of the NRC and Mr. W. Penniman of VYNPC.

These conversations culminated in Ref erence (e), in which agreement was reached on changes which will result in an acceptable plan.

Attachment A provides an explanation of the changes which are contained in the enclosed copy of the plan.

As requested in Reference (e), this Training and Qualification Plan is published as the " Original" version since the plan has been approved with the exception of the changes which were made with Mr. Gaskin's concurrence. While we intemt to continue to implement various portions of this plan, we understand that the implementation schedule presented in Section 5 will not start until Ve rmont Yankee receives of ficial written approval of the plan.

Both Attachment A and the plan are considered Safeguards Information and should be protected in accordance with 10 CFR 73.

We realize that 10 CFR 73 only requires that " portions" of the plan be classified, but the inf o rma t ion is intertwined to the point that much'of the plan would be classified

$60I regardless, and those areas which could be unclassified on their oun can be

,r added to other unclassified information to form a composite which does

{

represent Saf egua rd s Inf orma t ion.

For these reascns, we classified the entire plan with the intent of declassifying some specific information on case-by-case basis if it is presented outside the context of the plan.

ENCLOSURE CONTAINS SAFECUARDS INFORMATION.

UPON SEPARATION TIIIS PAGE IS DECONTROLLED F==m lEGUARDS INFORMAll0h

United States Nuclear Regulatory Commission Ma rch 19, 1982 Please not e that custody forms are included and should be returned by the individual who assumes final custody of the plan.

We have had problems with the return of similar documentat ion which was sent to the NRC with Physical Security Plan changes and would appreciate your ef forts to return thi s documentation.

i We trust this information is adequate.

If you have any questions, please contnct !! r. Earl W. Ja ckso n, Manager of Operations, at our West Bra t t le bo ro,

Vermont Offices.

I Very truly yours, j

f VERf10NT YANKEE NUCLEAR POWER CUR"0 RATION

)[b R.

L. Smith i

Licensi ng Engineer RLS : dad i

I:nc losu re s :

1.

Attachment A

[

2.

VYNPC Training and Qualification Plan for Security ENCLOSURE CONTAINS SAFECUARDS INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLED i

t l

{

l 1

l t

i I

..... _. _.