YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 82-1 FOR THE MONTH OF JANUARY, 1982 I

I E

l a

e a

r i

1 8203300094 820211 PDR ADOCK 05000029 R

PDR e

m w

-ew..,

y.

-y.

f OPERATING DATA REPORT 50-29 DOCKET NO.

DATE 820211 COMPLETED BY A.E.Doyle TELEPHONE 617-872-8100-X2390 OPERATING STATUS Notes Yankee Rowe

1. Unit Name:
2. Reporting Period: -

Januarv. 19R>

Power level restricted by 600

3. Licensed Therma! Power (MWr):

installation of baffle 185

4. Nameplate Rating (Gross MWe): _

175 P ates in turbine.

l

5. Design Electrical Rating (Net MWe):

180

6. Maximum Dependable Capacity (Gross MWe):

175

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Ocar in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

150 MWe

9. Power Lese! To Which Restricted.If Any (Net MWe):

con nnene

10. Ressons For Restrictions.lf Any:

This Month Yr to.Date Cumulative 744.00-744.00

11. Ilours in Reportin2 Period 744.00 744.00 147.675.15
12. Number Of Hours Reactor Was Criticag 0.00 n. nn-n.nn
13. Re$ctor Resene Shutdown Hours 744.00 744.00 143.224.50
14. Hours Generator On.Line 0.00 0.00 0,00
15. Urd: Feserve Shutdown Hours A A A. R77 nn 444.A?7.no 76.444.760.s?
16. Cross Thumal Energy Generated (MW}I) 115.117.90 its 117 9n

_92 Aqq n9n on

17. Gross Electriesl Energy Generated (MWH) 107.203.05 in7 ?na ns 91 oqn 9an 7,
18. Net Electrical Energy Generated (MWH) 100.00 100.00 76.99
19. Unit Service Fsetor 100.00 100.00 76.99
20. Unit Availability Factor A9 1A oo n cn in
21. Unit Capacity Factor (Using MDC Net) 82.34 82'.34 56'.46
22. Unit Capacity Factor (Using DER Net) 0.v0 0.00 q, i n l
23. Unit Forced Outage Rate l
24. Shutdowns Scheduled Over Next 6 Months (rype. Date.and Durstion of Esch):

l l

25. If Shut Down At End Of Report Period Estimated Date of Startup:

Forecast Achieved

26. Units in Test Ststus (Prior o Commercial OperationJ:

INITIAL CRITICALITY

~

f l

INITIAL ELECTRICITY CO\\lMERCIAL OPERATION (9/77)

AVERAGE DAILY UNIT POWER LEVEL e'

DOCKET NO. 50-29 UNIT Yankee Rowe DATE A?O?ll COMPLETF.D BY A.E. Doyle TELEPIIONE 617-872-8100=X239 MONT11 JANUARY, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) i 144.I 17 144 &

2 143.8 gg 144.2 3

143.7 19 144.3 4

143.8 20 144.3 5

144.4 21 144.2 6

I44 7 22 144.3 144.6 23 144.4 8

144.6 24 144 0 9

144.8 25 144.0 10 138.6 26 143.9 il 144 4 27 144.0 12 144.6 28 143 9 13 144.8 29 161 0 14 144.7 30 I44 1 15 144.6 33 144.2 16 144.6 l

INSTRUCTIONS On this format.Iist the average daily unit power leselin MWe Net for each dsy in the reporting month. Compute to the nearest whole snegawatt.

l P!/771 l

i I

UNITSilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

50-29 UNIT NAME Yankee Rowe DATE R20211 REPORT AIONTI! Mt'ARY. 1982 COMPLETED llY A.E.Dovie TELEPIIONE _617-872--8100-X2390 "s

$E

. $k Licensee 5%,

Cause & Currective No.

Dale g;

3g

,g g 5 Event gg e.1 Action so g3 5 5

jgg Report

  • v3 0 yO Pacient Recurrence 5

None N/A N/A N/A N/A N/A N/A N/A N/A N/A

~

I 2

3 4

F: Fusted Reason:

Mcttiod:

Extiibit G-Instructions S: Sclieduled A G uipenent Failuie(Explain)

I Manual for Picparation of Data l

II. Maintenance niTest 7 Manual Scram.

Entey Sliccis for Licensee C I(efueling 3-Automatic Scram.

Event RepinI(LER) File (NUnt'.G.

D Regulatiny Restriction 4 Onlict (Explain) 0161) li-Opciator Tsaining & License Exa.aination F-Administrative 5

G Operational I.sius (limplain)

Eminteit 1 - Same Source P8/77)

Il utlics (limplain)

r DOCKET NO.

50-2.9 UNIT Yankee Rowe DATE 820211 COMPLETED BY A.E. Doyle TELEPHONE 617-872-8100-X2390 1

REPORT MONTH JANUARY. 1982 StEBIARY OF OPERATING EXPERIENCES 1/8 1337 Reduced load by =6'MWe for No. 1 feedwater heater extraction steam valve manipulation.

1433 Returned to full power.

1/10 0001 Started a load reduction for throttle and control valve exercise.

0045 Completed control valve test.

0345 Completed throttle valve exercise and. began increasing load.

0730 Plant load at 155 MWe.

1/18 1915 Experienced earth tremor. No abnormalities or alarms were experienced.