YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 82-1 FOR THE MONTH OF JANUARY, 1982 I
I E
l a
e a
r i
1 8203300094 820211 PDR ADOCK 05000029 R
PDR e
m w
-ew..,
y.
-y.
f OPERATING DATA REPORT 50-29 DOCKET NO.
DATE 820211 COMPLETED BY A.E.Doyle TELEPHONE 617-872-8100-X2390 OPERATING STATUS Notes Yankee Rowe
- 1. Unit Name:
- 2. Reporting Period: -
Januarv. 19R>
Power level restricted by 600
- 3. Licensed Therma! Power (MWr):
installation of baffle 185
- 4. Nameplate Rating (Gross MWe): _
175 P ates in turbine.
l
- 5. Design Electrical Rating (Net MWe):
180
- 6. Maximum Dependable Capacity (Gross MWe):
175
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Ocar in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
150 MWe
- 9. Power Lese! To Which Restricted.If Any (Net MWe):
con nnene
- 10. Ressons For Restrictions.lf Any:
This Month Yr to.Date Cumulative 744.00-744.00
- 11. Ilours in Reportin2 Period 744.00 744.00 147.675.15
- 12. Number Of Hours Reactor Was Criticag 0.00 n. nn-n.nn
- 13. Re$ctor Resene Shutdown Hours 744.00 744.00 143.224.50
- 14. Hours Generator On.Line 0.00 0.00 0,00
- 15. Urd: Feserve Shutdown Hours A A A. R77 nn 444.A?7.no 76.444.760.s?
- 16. Cross Thumal Energy Generated (MW}I) 115.117.90 its 117 9n
_92 Aqq n9n on
- 17. Gross Electriesl Energy Generated (MWH) 107.203.05 in7 ?na ns 91 oqn 9an 7,
- 18. Net Electrical Energy Generated (MWH) 100.00 100.00 76.99
- 19. Unit Service Fsetor 100.00 100.00 76.99
- 20. Unit Availability Factor A9 1A oo n cn in
- 21. Unit Capacity Factor (Using MDC Net) 82.34 82'.34 56'.46
- 22. Unit Capacity Factor (Using DER Net) 0.v0 0.00 q, i n l
- 23. Unit Forced Outage Rate l
- 24. Shutdowns Scheduled Over Next 6 Months (rype. Date.and Durstion of Esch):
l l
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
Forecast Achieved
- 26. Units in Test Ststus (Prior o Commercial OperationJ:
INITIAL CRITICALITY
~
f l
INITIAL ELECTRICITY CO\\lMERCIAL OPERATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL e'
DOCKET NO. 50-29 UNIT Yankee Rowe DATE A?O?ll COMPLETF.D BY A.E. Doyle TELEPIIONE 617-872-8100=X239 MONT11 JANUARY, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) i 144.I 17 144 &
2 143.8 gg 144.2 3
143.7 19 144.3 4
143.8 20 144.3 5
144.4 21 144.2 6
I44 7 22 144.3 144.6 23 144.4 8
144.6 24 144 0 9
144.8 25 144.0 10 138.6 26 143.9 il 144 4 27 144.0 12 144.6 28 143 9 13 144.8 29 161 0 14 144.7 30 I44 1 15 144.6 33 144.2 16 144.6 l
INSTRUCTIONS On this format.Iist the average daily unit power leselin MWe Net for each dsy in the reporting month. Compute to the nearest whole snegawatt.
l P!/771 l
i I
UNITSilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 UNIT NAME Yankee Rowe DATE R20211 REPORT AIONTI! Mt'ARY. 1982 COMPLETED llY A.E.Dovie TELEPIIONE _617-872--8100-X2390 "s
$E
. $k Licensee 5%,
Cause & Currective No.
Dale g;
3g
,g g 5 Event gg e.1 Action so g3 5 5
jgg Report
- v3 0 yO Pacient Recurrence 5
None N/A N/A N/A N/A N/A N/A N/A N/A N/A
~
I 2
3 4
F: Fusted Reason:
Mcttiod:
Extiibit G-Instructions S: Sclieduled A G uipenent Failuie(Explain)
I Manual for Picparation of Data l
II. Maintenance niTest 7 Manual Scram.
Entey Sliccis for Licensee C I(efueling 3-Automatic Scram.
Event RepinI(LER) File (NUnt'.G.
D Regulatiny Restriction 4 Onlict (Explain) 0161) li-Opciator Tsaining & License Exa.aination F-Administrative 5
G Operational I.sius (limplain)
Eminteit 1 - Same Source P8/77)
Il utlics (limplain)
r DOCKET NO.
50-2.9 UNIT Yankee Rowe DATE 820211 COMPLETED BY A.E. Doyle TELEPHONE 617-872-8100-X2390 1
REPORT MONTH JANUARY. 1982 StEBIARY OF OPERATING EXPERIENCES 1/8 1337 Reduced load by =6'MWe for No. 1 feedwater heater extraction steam valve manipulation.
1433 Returned to full power.
1/10 0001 Started a load reduction for throttle and control valve exercise.
0045 Completed control valve test.
0345 Completed throttle valve exercise and. began increasing load.
0730 Plant load at 155 MWe.
1/18 1915 Experienced earth tremor. No abnormalities or alarms were experienced.
W