ML20042B933

From kanterella
Jump to navigation Jump to search
Forwards Instruction for Inserting QA Program Plan for Inservice Insp Program in Preservice Insp Program Plan Manual
ML20042B933
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 03/16/1982
From: Peter A
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20042B932 List:
References
NUDOCS 8203260305
Download: ML20042B933 (1)


Text

F-March 16, 1982 1

Mr. Harold R.

Denton, Director - 011-020 Office of Nuclear Reactor Regulat,i,9n Light Water Reactors, Branch 4 U.S. Nuclear Regul*atory Commission Washington, D.C.

20,555 Preservice Inspection Program Plan Transmittal Shoreham Nuclear Power Station - Unit 1 W.

O.

44430/48923 As holder of a controlled copy of the PSI Program Plan Manual, you will receive all revisions to the Manual as they are issued.

At-tached you will find instructions for inserting the enclosed docu-

.ments in the PSI Program Plan Manual.

The' instructions will also serve as a checklist to assure that you have received all the re-quired material.

ENCLOSURE (SO :

NES Transmittal Letter 5536-325 80A0448, Rev. 8 80A2941, Rev. 10 3

Please acknowledge receipt of these documents by signing and dating this transmittal in the space provided below.

Return the completed transmittal form to:

.Mr. A.

Peters, Staff Assistant Long Island Lighting. Company Shoreham Nuclear Power Station P.O.

Box 618, North Country Road Wading River, New York 11792

[

4 Attachment & Enclosure cc:

Eng. File /SR2...SHI-397 r ~.t i

Y Signed Date 8203260305 820316 PDR ADCCK 05000322 G

PDR Y

_*h

  • d