ML20042B877

From kanterella
Jump to navigation Jump to search
Provides Info Re Status of Pipe Support Insp,In Response to Violations Noted in NRC 810824 Ltr & IE Insp Repts 50-454/81-09 & 50-455/81-10.Insp Will Not Be Completed Until Late 1982 for 55 Supports
ML20042B877
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/08/1982
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8203260234
Download: ML20042B877 (1)


Text

Commonwealth Effson

'N) Ons Fest National Plaza. Chicago.pois y

C 7 Address R: ply to: Post Othco Box 767

( ,/ Chicago, libriois 60690 RIt:",TPAL T :

March 8, 1982 #

7/nh Jm

\/n . _ h!J '

owed \

Mr. James G. Keppler, Regional Administrator [gy \

Oirectorate of Inspection and Enforcement - Region III g.L - -

g U.S. Nuclear Regulatory Commission 799 Roosevelt Road 9 Glen Ellyn, IL 60137 N g

inECWMD

Subject:

Byron Station Units 1 and 2 6

@iR Ii'E Inspection Report Nos. n, g g g82l> -

50-454/81-09 and 50-455/81-10 -

4 NRC Docket Nos. 50-454 and,455 $, ugsyyg3Y:a s, w References (a): August 24, 1981, letter from 8 C. E. Norelius to Cordell Reed. 4 m (b): September 24, 1981, letter from L. O. De1 George to J. G. Keppler.

Dear Mr. Keppler:

This is to report the status of pipe support inspections at Byron Station which were promised in reference (b) in response to a violation identified in reference (a).

The inspection of installed supports was scheduled for completion by October 15, 1981. Over 8500 supports have been checked. There are 55 supports for which the inspection will not be completed until late 1982. In general, these supports are being redesigned as a result of revised piping analysis calculations and will be inspected when new material is received and installed.

Please address questions regarding this matter to this Very truly yours, L. O. DelGeorg Director of Nuclear Licensing 1m l 3593N 1Eol 8203260234 820308 PDR ADOCK 05000454 MAR 171982 4,g O PDR