Commonwealth Effson
'N) Ons Fest National Plaza. Chicago.pois C 7 Address R: ply to: Post Othco Box 767 y(,/ Chicago, libriois 60690 RIt:",TPAL T :
March 8, 1982 7/nh Jm
\\/n
_ h!J '
owed
\\
Mr. James G. Keppler, Regional Administrator
[gy
\\
Oirectorate of Inspection and
- g. -
g Enforcement - Region III L
U.S. Nuclear Regulatory Commission 799 Roosevelt Road 9
Glen Ellyn, IL 60137 N
g inECWMD
Subject:
Byron Station Units 1 and 2 6
@i R
Ii'E Inspection Report Nos.
n, g g g82l>
50-454/81-09 and 50-455/81-10 NRC Docket Nos. 50-454 and,455
$, ugsyyg3Y:a 4 w
s, References (a):
August 24, 1981, letter from 8
C. E. Norelius to Cordell Reed.
4 m
(b):
September 24, 1981, letter from L. O. De1 George to J.
G. Keppler.
Dear Mr. Keppler:
This is to report the status of pipe support inspections at Byron Station which were promised in reference (b) in response to a violation identified in reference (a).
The inspection of installed supports was scheduled for completion by October 15, 1981.
Over 8500 supports have been checked.
There are 55 supports for which the inspection will not be completed until late 1982.
In general, these supports are being redesigned as a result of revised piping analysis calculations and will be inspected when new material is received and installed.
Please address questions regarding this matter to this Very truly yours, L. O. DelGeorg Director of Nuclear Licensing 1m 1Eol l
3593N MAR 171982 4,g 8203260234 820308 PDR ADOCK 05000454 O