ML20042B828

From kanterella
Jump to navigation Jump to search
Forwards Initial Approach to Power Tests (B-Series), Interim Rept 22 for 811123-820222
ML20042B828
Person / Time
Site: Fort Saint Vrain 
Issue date: 03/12/1982
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20042B829 List:
References
P-82072, NUDOCS 8203260196
Download: ML20042B828 (2)


Text

r 4

pubile service company ofeduzde ve 16805 WCR 19 1/2, Platteville, Colorado 80651

~

m March 12, 1982 i

ff f6Cgg'ED 3

Fort St. Vrain 2

Unit #1 pg259F G_

P-82072 nu,fj$Y' q

6 sc g

Mr. John T. Collins, D

Regional Administrator Region IV i

Nuclear Regulatory Commission 611 Ryan Plaza.Orive Suite 1000 Arlington, Texas 76011

Reference:

Facility Operating License No. DPR-34 Docket No. 50-267

Dear Mr. Collins:

Enclosed please find a copy of the twenty-second Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No.1.

This report covers the period from November 23 1981, through February 22, 1982, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

Very truly yours,

)}ius.t Don Warembourg Manager, Nuclear Production 1

DW/lsb Enclosure cc:

Director I and E

g. p[gdg {'~

Director, MIPC k; I;~*R 2 2 ss2

)

r l

M 0

u h /

0203260196 820312 PDR ADOCK 05000267 p

PDR

w e

STARTt? #TPORT Of 5TRI 5L'T!nN Number n f ropleg

()(OriginalofPLetter)

Karl V. Seyfrit. Director----------------------------

Region IV Office of Inspection and Enforcement Nuclear Pegulatory Commission 611 Ryan Plaza Drive Suite 1009 Arlington. Texas 76012 Di rec to r ------------------------------------

2 (P Letter) of fice of Management Info rmation and Program Control Nuclea r Regulatory Commission Washington D.C.

20555 Di rec to r ------------------------------------ 25 (P Letter) of fice of inspection anj Enforcement U. S. Nuclea r Re gulatory Commission Washington. D.C.

20555 Department of Ene rgy 1

(P Letter)

Mr. Glen A. Newby. Chie f HTR Branch Division of Nuclear Power Development Mail Station B-107 Washin gt on. D.C.

20545 W. B u s hn e l l. S i t e Ma n a ge r - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (Original of FPLG Letter General Atomic Company Plus 2 Copice Plus 1 P.O.

Box 426 Copy of P Letter)

Pla tteville. Colorado 80651 N RC Re s i den t S i t e In spec to r - - - - - - - - - - - - - - - - - * * - - - * * - - -

1 (P Letter)

Vice P resident. Engineering and Planning. 39 t h A ve n ue - - - - - - - - - - -

1 (P Letter. FPLC Letter)

Vice P ren tden t. Production Division. Belleview 1

(P Letter)

Q ua l i ty As s u ranc e Man a ge r - - - = = - - - - - - - - - - - - - - - - - - - - - - -

1 (P Letter. FPLG Letter) site Fngineering Coordinator


==-----------------

1 (P Letter. FPLG f.et te r)

Se nio r Vice President. Ro o m 7 7 0 - - - - - - - - - - - - - - - - - - - - - - - - -

1 (P Letter)

Nuclear Pro ject Manager. !bntbellt 1

(P Letter. FPLG Letter)

Supervisor. Licensing and Administr2tive Services.

Nuclear Projec t Departrent. !bntbello -------------------

1 (P Letter. FPLG Letter) hupe rvisor. Project Enginee ring. Nuclear Project Department. Mont be llo - - - - -

1 (P Letter. FPLG Letter)

Do c ume nt s con t ro l Technic ian, tbn t ba llo - - - - - - - - - - - - - - - - - - - -

2 (2 P Letters. 2 FPLG Let ters)

Correspondence coordinator. Nuclear Project Depa rt men t. Mantbello - - - - - - - - 1 (P Letter. FPLG Letter)

Nuclear Production Manager 1

(P Letter. FPLG Letter)

O e ra tions Manage r -----------------------------.-

1 (P Letter)

P Admi ni s t ra tive Se rvi ces Mana ge r - - - - - - - - - - - - - - - - - - - - - - - - -

1 (P Letter)

PnRC Committee ---------------------------------

1 (P Letter)

Dr.H.G.Olson---------------------------------

1 PSV NFSC Secretary -------------------------------

1 (P Letter)

P Files - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

1 (P Letter)

Record Storage 2

(P Letter)

Te c h ni cal Se rvi c e s Re view - - - - - - - - - - - - - - - - - - - - - - - - - - - -

1 (p Letter)

Te c hni ca l S e rv i c e s S upe rviso r - - - - - - - - - - - - - - - - - - - - - - - - - -

1 (P Letter)

Technical Services Startup Report Notebook 1

Startup Report Folder - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

1 (P Letter. FPLG Letter)

Startup Report File - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

0 (Original of Report.

P Letter. FPLG Letter)

E"