ML20042B820
| ML20042B820 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/18/1982 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3K82-0455, W3K82-455, NUDOCS 8203260184 | |
| Download: ML20042B820 (2) | |
Text
Y LOUISIANA 242 OuAnoNoE S1aur POWER & L1GHT P O 80X 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 muun March 18, 1982 G. D. McLENDON Senior Vice President W3K82- 0155 Q-3-A35.07.17 Q-3-A35.07.33 Q-3-A35.07.35
?/
cA Mr. John T. Collins, Regional Administrator, Region IV g
U. S. Nuclear Regulatory Commission
{ 7p'f, p D
(h L5 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 o
SUBJECT:
Waterford SES Unit No. 3
+
6 Docket No. 50-382 ro 2
Significant Construction Deficiencies No's. 17, 33, and 35 CD No. 17
" Base Metal Defect in Main Steam and Feedwater Con-tainment Penetration Anchors" No. 33
" Chilled Water Piping Supports" No. 35
" Material Properties of Tube Track and Welded Fittings"
Reference:
Telecon - L. L. Bass (LP&L) to B. Crossman (NRC) dated 3/15/82
Dear Mr. Collins:
The final reports for the subject Significant Construction Deficiencies will not be submitted as previously committed. The following information explains the status of each item:
SCD #17
" Base Metal Defect in Main Steam and Feedwater Containnent Penetration Anchors" Due to the amount of rework that remains to be completed on this item's corrective action, a final report will not be submitted until June 1, 1982.
SCD #33
" Chilled Water Piping Supports" Due to the amount of work involved in implementing the corrective action of this item, it is not possible to submit a final report at this time.
Of the 259 support / restraints involved, over 50 of these supports / restraints are being worked or are completed. A final report will be submitted by July 30, 1982.
3-f l
fu[b hI 8 8203260184 820318 EI PDR ADOCK 03000382 PDR l
3 Sl S
i l
- __J 6
7 e.
f
.e s
i Mr. John T. Collins, Region IV Page 2 SCD #35
" Material Properties of Tube Track and Welded Fittings" The corrective action on this item has not been completed. Ebasco Con-struction Engineering requires additional time in order to complete the identification of areas which require rework or installation of-supports.
A final report on this item will be submitted by June 21,1982.
Very truly yours,
h. y ' ~ b.-.
G. D. McLendon Senior Vice President GDMcL/LLD/ned cc:
1)
Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 2)
Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s