Interim Const Deficiency Repts 17,33 & 35 Re Base Metal Defect in Main Steam & Feedwater Containment Penetration Anchors,Chilled Water Pipping Supports & Matl Properties of Tube Track & Welded Fittings,Respectively
ML20042B820
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/18/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K82-0455, W3K82-455, NUDOCS 8203260184
Download: ML20042B820 (2)


Text

Y LOUISIANA 242 OuAnoNoE S1aur POWER & L1GHT P O 80X 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 muun March 18, 1982 G. D. McLENDON Senior Vice President W3K82- 0155 Q-3-A35.07.17 Q-3-A35.07.33 Q-3-A35.07.35

?/ cA Mr. John T. Collins, Regional Administrator, Region IV g U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

{ 7p'f , p D

' (h L5 Arlington, Texas 76012 o + 6

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 ro 2 Significant Construction Deficiencies No's. 17, 33, and 35 CD No. 17 " Base Metal Defect in Main Steam and Feedwater Con-tainment Penetration Anchors" No. 33 " Chilled Water Piping Supports" No. 35 " Material Properties of Tube Track and Welded Fittings"

Reference:

Telecon - L. L. Bass (LP&L) to B. Crossman (NRC) dated 3/15/82

Dear Mr. Collins:

The final reports for the subject Significant Construction Deficiencies will not be submitted as previously committed. The following information explains the status of each item:

SCD #17 " Base Metal Defect in Main Steam and Feedwater Containnent Penetration Anchors" Due to the amount of rework that remains to be completed on this item's corrective action, a final report will not be submitted until June 1, 1982.

SCD #33 " Chilled Water Piping Supports" Due to the amount of work involved in implementing the corrective action of this item, it is not possible to submit a final report at this time. Of the 259 support / restraints involved, over 50 of these supports / restraints are being worked or are completed. A final report will be submitted by July 30, 1982.

3-l f 8203260184 820318 hI 8 PDR S

ADOCK 03000382 PDR fu[b EI 3 Sl i

l

" l

- __J 6

7

e. .. .. - .

f s .e i

Mr. John T. Collins, Region IV Page 2 SCD #35 " Material Properties of Tube Track and Welded Fittings" The corrective action on this item has not been completed. Ebasco Con-struction Engineering requires additional time in order to complete the identification of areas which require rework or installation of-supports.

A final report on this item will be submitted by June 21,1982.

Very truly yours,

h. y '

. ~ b.- .

G. D. McLendon Senior Vice President GDMcL/LLD/ned cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s