ML20042B592
| ML20042B592 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 07/10/1981 |
| From: | Bernard D YANKEE ATOMIC ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20042B586 | List: |
| References | |
| NUDOCS 8203250447 | |
| Download: ML20042B592 (5) | |
Text
_.. _ -
i 1
l 6
YANKEE ATOMIC NUCLEAR POWER STATION i
MONTHLY STATISTICAL REPORT 81-6 FOR THE MONTH OF JUNE,1981 i
s i
T 4
8203250447 810710 PDR ADDCK 05000029 R
l PDR i,-~,,....._
OPERATING DATA REPORT.
DOCKET NO.
50-29 DATE A10710 C051PLETED BY
- n. M Rarnard TELEPHONE 617 R77-8100 X2390 OPERATING STATUS o
Yankee Rowe Notes
- 1. Unit Name:
- 2. Reporting Period:
June. 1981 p
- 3. Licensed Thermal Power (31Wt):
600 g
185
- 4. Namep!ste Rating (Gross 51We):
plates in turbine.
175
- 5. Design Electrical Rating (Net SIWE):
180
- 6. 51sximum Dependsble Capacity (Gross 51We):
175
- 7. 51sximum Dependsble Capscity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Ressons:
' 9. Power Level To Which Restricted.If Any (Net SIWE):
150 MWe See Notes
- 10. Ressons For Restrictions.lf Any:
This 51onth Yr. to.Date Cumulative 720.00 4,343.00
- 11. Hours In Reportin2 Period
- 12. Number Of Hours Rescror Was Critica!
0.00 2.856.13 143,190.41
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator Ori Line 0.00 2.840.52 138,802.25_
- 15. Unit Reserve Shutdown Hours 0.00 0.00.
0.00 0.00 1.485.666.90 74.359.447.71
- 16. Cross Therms! Energy Generated (5tWH)
- 17. Gross Electrical Energy Generated (31WH)
- 0. 00..
397.238.90 22.782.379.40
- 18. Net Electrical Energy Generated (31WH) 0.00 366.934.42 21.325.044.11 0.00 65.40 76.75
- 19. Unit Service Factor
- 20. Unit Availability Factor 0.00 65.40 76.75
- 21. Unit Capacity Factor (Using 51DC Net) 0.00 48.28 69.50 0.00 48.28 69.50
- 22. Unit Capacity Factor (Using DER Net) 0.00 2.35 5.32
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date.snd Durstion of Each1:
None t
I i
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
Jniv 27. 19R1
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITIC.4LITY INITIA L ELECTRICITY CONIMERCIAL OPERATION t/77) 9
i AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO. 50-29 UNIT Yankee Rowe DATT R10710 COMPLETED BY D. M. Bernard 617-872-8100 X2390 TELEPHONE MONTH JtEE. 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4
(MWe Net)
(MWe-Net) 0.0 0.0 37 2
18 3
19
.~.
4 20 5
21 6
22 k.-
7 23 8
24 9
25 10 26 II 27 12 28 13 29 14 30 N/
IS 31 16 5/
i I
INSTRUCTIONS On this format. list the.sverage daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megswatt.
(9/77) t l
,,_.-._,p
s DOCKET NO.
50-29 UNITSIlUTDOWNS AND POWER REDUCTIONS j
UNIT NAME Yankee Rowe DATE 810710 I
REPORT Af0NTII JUNE, 1981 COMPLETED llY D. M. Bernard i
TELEPilONE 617-872-8100 X2390 w.
.! E
}
.E Licensee
,E*
Cause & Corrective 5g
,, g 5 Event uT o3 Action to No.
Date a-N g3 5 5~ jgg Report *
- G u
Preveni Recterence d
2 5/2/81 S
720 C
1 N/A N/A N/A Shut down for Core XV refueling and maintenance outage.
t 2
3 4
F: Fneted Reason:
Method:
Exhibit G Instructions S: Scheduled A Etinipinent Failure (Explain) 1 Manual for Picparation of Data Il Mai itenance of Test 7-Manual Scram.
Entsy Sheets for Licensee C. Refueling 3 Autonratic Scram.
Event Repunt (Llini Fue INUREG-D Regulatiny Restriction 4 Other (Explain) 0161)
E Opciator Training & License Examination F Administsalive 5
G Opeutional I;iner (limplain)
Exhibit I Same Sonsce
('8/17)
Il-Othes (limplain) 1 l
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 810710 COMPLETED BY D. M. Bernard TELEPHONE 617-872-8100 X2390 REPORT MONTH JUNE, 1981 SU'-BIARY OF OPERATING EXPERIENCES
'Ihe plant remained shut down for the entire month for Core XV refueling and maintenance shutdown.
4 e
m