Monthly Operating Rept for Dec 1981
ML20042B591
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/06/1982
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20042B588 List:
References
NUDOCS 8203250446
Download: ML20042B591 (5)


Text

.

.. OPERATING DATA REPORT DOCKET NO. 50-244 DATE January 6,1982 COMPIE'ED BT fnh 2. heseu Andrew E. McNamara -

TELEPBONE 1 (315) 524-4446 r

OPERATING STATUS Ext. 205 or 293

1. Unit Name:

SINNA STATION, UNIT #1 Notes: The reactor power level was

2. Reporting Period:

Decenber, 1981 maintained at the 100% level for the

3. Licensed Thermal Power (MWt):

1520 majority of the report month, with

4. Nameplate Rating (Gross MWe):

490 the excepticns listed on page 4.

5. Design Electrical Rating (Net MWe): 470
6. Maximum Dependable capacity (Gross MWe): 490
7. Maximun Dependable capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Nunber 3 through 7) Since Last Rsport, Give Reasons:
9. Power Level to Which Restricted, If Argr (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cummulative

11. Hours In Reporting Period 744 8,760 106,056
12. Nunber of Hours Reactor Was Critical 744.00 7,242.10 81,642.62
13. Reactor Reserve Shutdown Hours 0.00 0.00 1,631 32 *
14. Hours Generator On-Line 744.00 7,196.00 79,827.63
15. Unit Reserve Shutdown Hours 0.00 0.00 8.50 *
16. Oross Thermal Energ Generated (MWH) 1,121,904 10,703,352 108,905,554
17. 3r s Electrical Energ Generated (MWH) 368,092 3,494,866 35,434,965
18. Nst Electrical Energ Generated (MWH) 350,462 3,322,528 33,578,073
19. Unit Service Factor 100.00%

82.15%

75 27%

20. Unit Availability Factor 100.00%

82.15%

75 28%

21. Unit Capacity Factor (Using MDC Net) 100.22%

80.7C%

69.46%

22. Unit Capacity Factor (Using DER Net) 100.22%

80.70%

69.46%

23. Unit Forced Outage Rate 0.00%

0 55%

8 37 %

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duraticn of Each):

March 20,1982 - 60 day outage for modifications, maintenance and refueling.

25. If Shutdown At End Of Report Period, B3timated Date Of Startup:
26. Units In Test Status (Prior to Comercial Operatim):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Cunmulative total Commencing January 1,1975 8203250446 8201o7 DR ' ADOCK 05000244 PDR

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT #1 31nna Station DATE January 6,1982 COMPID ED BY /L y-e E. hW = _

I,ndrew E. McFamEQ*a TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 MONTH December, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne*,)

(MWe-Net) 1.

474 17 474 2.

474 18.

475 3

474 19 475 4

4 75 20.

4 74 5

473 21.

473 6.

388 22.

474 7

472 23 474 8.

474 24 474 9

474 25 473 10.

473 26.

474 11.

474 27 474 12.

4 74 28.

473

13. _

474 29 474 14 474 30.

4 74 15 475 31.

474 16.

475 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Ccinpute to the nearest whole megawatt.

DOCKFT NO. 50-244 GIT NAME -#1 Ginna Station UNIT SlHRDOWN AND POWER REDICTIONS DATE January 6, 1 %2 (XEPLETED FI /z 1 e-2. AsW t

Andrew E. McNamdra REPORT MONTH December,1981 TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 Method of Duration Reason Shutting Licensee System Component Cause & Corrective Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to No.

Dau Reactor 3 Report #

Pmvent Recurrence No outages or significant power reductions to report.

1 2

3 4

F: Forced Reason:

Method:

Exhibit 3 - Instructions A-B uipnent Failure (Explain) 1-Manual for Preparation of Data h

S: Scheduled l

B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refuellug 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NURE"r-0161)

E-Operator Training & License Examination F-Administrative "dperational Error (Explain) 5 H-Other (Explain)

Exhibit 1 - Same Source

. NARRATIVE SIPEARY OF OPERATING EXPERIMICE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE January 6, 1982 COMPIRPRD BY [ k 1-5,AW _

Andrew E. McNa A TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 IONTH December, 1981 The reactor power level was maintained at the 100% level for the majority of the reporting period. The exceptions to this were:

On 12/6/81, the resctor power level was reduced to approximately 46% to p%

erform a series of turbine valve and trip tests. The power level was restored to 100 after the tests were completed.

On 12/20/81, the reactor power level was reduced to approximately 98% to perform a periodic test on the standby auxiliary feed pump flow. The reactor power level was restored to 100% after the test and remained there until the end of the report month.

l l

. GINNA STATION Maintenance Report December, 1981 During December, normal maintenance and inspections were performed. Major safety related maintenance included:

Cleaning of_ a containment isolation check valve for the containment air radiation monitor return line.

The valve failed to seal properly due to dirt on the seal.