.. OPERATING DATA REPORT DOCKET NO. 50-244 DATE January 6,1982 COMPIE'ED BT fnh 2. heseu Andrew E. McNamara -
TELEPBONE 1 (315) 524-4446 r
OPERATING STATUS Ext. 205 or 293
- 1. Unit Name:
SINNA STATION, UNIT #1 Notes: The reactor power level was
- 2. Reporting Period:
Decenber, 1981 maintained at the 100% level for the
- 3. Licensed Thermal Power (MWt):
1520 majority of the report month, with
- 4. Nameplate Rating (Gross MWe):
490 the excepticns listed on page 4.
- 5. Design Electrical Rating (Net MWe): 470
- 6. Maximum Dependable capacity (Gross MWe): 490
- 7. Maximun Dependable capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Items Nunber 3 through 7) Since Last Rsport, Give Reasons:
- 9. Power Level to Which Restricted, If Argr (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cummulative
- 11. Hours In Reporting Period 744 8,760 106,056
- 12. Nunber of Hours Reactor Was Critical 744.00 7,242.10 81,642.62
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 1,631 32 *
- 14. Hours Generator On-Line 744.00 7,196.00 79,827.63
- 15. Unit Reserve Shutdown Hours 0.00 0.00 8.50 *
- 16. Oross Thermal Energ Generated (MWH) 1,121,904 10,703,352 108,905,554
- 17. 3r s Electrical Energ Generated (MWH) 368,092 3,494,866 35,434,965
- 18. Nst Electrical Energ Generated (MWH) 350,462 3,322,528 33,578,073
- 19. Unit Service Factor 100.00%
82.15%
75 27%
- 20. Unit Availability Factor 100.00%
82.15%
75 28%
- 21. Unit Capacity Factor (Using MDC Net) 100.22%
80.7C%
69.46%
- 22. Unit Capacity Factor (Using DER Net) 100.22%
80.70%
69.46%
- 23. Unit Forced Outage Rate 0.00%
0 55%
8 37 %
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duraticn of Each):
March 20,1982 - 60 day outage for modifications, maintenance and refueling.
- 25. If Shutdown At End Of Report Period, B3timated Date Of Startup:
- 26. Units In Test Status (Prior to Comercial Operatim):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cunmulative total Commencing January 1,1975 8203250446 8201o7 DR ' ADOCK 05000244 PDR
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT #1 31nna Station DATE January 6,1982 COMPID ED BY /L y-e E. hW = _
I,ndrew E. McFamEQ*a TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 MONTH December, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne*,)
(MWe-Net) 1.
474 17 474 2.
474 18.
475 3
474 19 475 4
4 75 20.
4 74 5
473 21.
473 6.
388 22.
474 7
472 23 474 8.
474 24 474 9
474 25 473 10.
473 26.
474 11.
474 27 474 12.
4 74 28.
473
- 13. _
474 29 474 14 474 30.
4 74 15 475 31.
474 16.
475 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Ccinpute to the nearest whole megawatt.
DOCKFT NO. 50-244 GIT NAME -#1 Ginna Station UNIT SlHRDOWN AND POWER REDICTIONS DATE January 6, 1 %2 (XEPLETED FI /z 1 e-2. AsW t
Andrew E. McNamdra REPORT MONTH December,1981 TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 Method of Duration Reason Shutting Licensee System Component Cause & Corrective Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to No.
Dau Reactor 3 Report #
Pmvent Recurrence No outages or significant power reductions to report.
1 2
3 4
F: Forced Reason:
Method:
Exhibit 3 - Instructions A-B uipnent Failure (Explain) 1-Manual for Preparation of Data h
S: Scheduled l
B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refuellug 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NURE"r-0161)
E-Operator Training & License Examination F-Administrative "dperational Error (Explain) 5 H-Other (Explain)
Exhibit 1 - Same Source
. NARRATIVE SIPEARY OF OPERATING EXPERIMICE DOCKET NO.
50-244 UNIT Ginna Station, Unit #1 DATE January 6, 1982 COMPIRPRD BY [ k 1-5,AW _
Andrew E. McNa A TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 IONTH December, 1981 The reactor power level was maintained at the 100% level for the majority of the reporting period. The exceptions to this were:
On 12/6/81, the resctor power level was reduced to approximately 46% to p%
erform a series of turbine valve and trip tests. The power level was restored to 100 after the tests were completed.
On 12/20/81, the reactor power level was reduced to approximately 98% to perform a periodic test on the standby auxiliary feed pump flow. The reactor power level was restored to 100% after the test and remained there until the end of the report month.
l l
. GINNA STATION Maintenance Report December, 1981 During December, normal maintenance and inspections were performed. Major safety related maintenance included:
Cleaning of_ a containment isolation check valve for the containment air radiation monitor return line.
The valve failed to seal properly due to dirt on the seal.
I
_.