/ OPERATING DATA REPORT DOCKET NO.
50-244 DATE JUN_E 8_,
1981 C O hlP L E T E D B Y Mub e AYDR'Eki E. MCNAMARA' TELEPilONE 1 (315) 524-4446 OPERATING STATUS Ext. 205 or 293
- 1. Unit Narne:
GINNA STATION. UNIT #1 Notes:
The Annual Refueling,
- 19 1
- 2. Reporting Period:
Modifications, and Maintenance 1520 Shutdown Continued.
- 3. Licensed Thermal Power (SITt):
490
- 1. Nameplate Rating (Gross SITE):
g
- 5. Design Electrical Rating (Net htWe):
490
- 6. staximum Dependable Capacity (Gross SITE):
470
- 7. Sfaximum Dependable Capacity (Net SITE):
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Thich Restricted, If Any (Net htTe):
- 10. Reasons For Restrictions, If Any:
This 5footh Yr. to Date Cumulative 744 3,623 100,919 i1. Ilours in Reporting Period
- 12. Number of flours Reactor Tas Critical 0
2,570.20 76,970.72 0
0 1,631.32* --
l L Reactor Reserve Shutdown llours 0
2,560.25 75,191.88
- 11. Ilours Generator On-Line 0
0 8.5 *
- 15. Unit Reserve Shutdown llours 0
3,784,968 101.987.170
- 16. Gross Therras! Energy Generated (SITil) 0 1,240,349 33,180,448
- 17. Gross Electrical Energy Generated (51T11) 0
- 18. Net Electrical Energy Generated ($1Til) 1.178.469 31,434,014 0%
70.67%
74.51%
- 19. Unit Service Factor 0%
70.67%
74.52%
- 20. Unit Availability Factor 0%
69.21%
64.45%
- 21. Unit Capacity Factor (Using 51DC Net) 0%
69.21%
64.45%
- 22. Unit Capacity Factor (Using DER Net) 0%
0.36%
8.81%
- 23. Unit Forced Outage Rate
- 21. Shutdowns Scheduled Over Next 6 Stonths (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: JUNE 18, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
- Cumulative Total Commencing January 1, 1975 INITIAL CRITICALITY INITIAL ELECTRICITY COhiNIERCIAL OPERATION 82032504g4 gDR ADOCK O ohoh 4 a-u
< u v.
um PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT #1. Ginna Station DATE JUNE 8. 1981 r-COMPLETED BY ANDRER E. MCNMfAAA TELEPHONE 1 (115) 524 4446 Ext. 205 or 293 MONTi{
MAY, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M We-Net)
(MWe-Net) 1 17 2
18 3
IS 4
20 5
21 6
gg 7
23
~~
8 24 9
25
~-
10 26 11 27 12 28 13 14 30 l
~-
15 31
-~
16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
DOCKET NO.
50-244 UNITNAMii _81aGinna Sixtion UNIT SHUTDOWN AND POWER REDUCTIONS DATE AUME,8, 1981 COMPLETED HY Me k d-M'T:---
ANDREW E. MCNAMARA REPORT hlONTII MAY, 1981 TELEPflONI.: 1 (315) 524-4446 Ext. 205 or 293 m
m5 a
c e
a Licensee e,
gm Cause & Corrective oq c
.c u No.
Date
{
jg
} @g,E Event
- 4 gj Action to Report #
y
!u Prevent Recurrence D-dE j
e c
2 g
U o
81-2 04-18-81 S
744
- C 1
Annual Refueling, Modifications, and Maintenance Shutdown Continued.
- Shutdown llours in the Month of May 1
2 3
4 F: Forced Reason:
Methoti:
Exhibit G - Instructions S: Scheiluted A-liquipment Failure (Explain) 1 -hfanual for Preparati. n of Data ll-hfaintenance or Test 2-hfanual Scram.
Entry Sheets for Licensec l
C-Hefueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Hestriction 4-Other (Explain) 0161)
E-Operator Training & License Examination l
F-Administrative l
G-Operational Error (Explain) u 4s...
inev.i/1.e II-Other (Explain)
Exhibit 1 - Same Source I
o 4
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50 244 UNIT GINNA STATION DATE JUNE 8, 1981 Y---
COMPLETED BY ANDREW E. MCNAMARA b.
TELEPHONE 1 (315) 524-4446 MONTH The annual refueling, modifications, and maintenance shutdown continued.
f 43123 (1/7sp
_