9 a
1 OPERATING DATA REPORI.
DOCKET NO.
50-244 DATE May 6 1981 COMPLETED BY O J" E b h 1-M Andrew E. McNamara TELEPHONE 1-(315)-524-4446 DPERATING STATUS Ext. 205, 293
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes : With a few exceptions
- 2. Reporting Period:
April, 1981 noted on page 4, the reactor
- 3. Licensed Thermal Power (MTt):
1520 power level averaged 100%
490 until "coastdown" began on 4/10
- 4. Namepiste Rating (Gross MWe):
470 The annual refueling shutdown
- 5. Design Electrical Rating (Net MWe):
490 commenced on 4/18,
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Thich Restricted, If Any (Net MTe):
- 10. Reasons For Restrictions, If Any:
F This Month Yr. to Date Cumulative (M70, 2-719 2.879-100.175
- 11. Hours la Reporting Period
- 12. Number of Hours Reactor Was Critical 410.20 M 2.5720.20 76.970.72 0
0 1,631.32*
- 13. Reactor Reserve Shutdown Hours 409.5 2.560.2s 75.191.88
- 14. Hours Generator On-Line 0
0 8.5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MTH) 604.920 3.784.968 101.987.170 197,381 1,240,349 33,180,448
- 17. Gross Electrical Energy Generated (MTH)
- 18. Net Electrical Energy Generated (MTH) 186,936 1.178 31.434.014 56.95%
88.93%
75.06%
- 19. Unit Service Factor
- 20. Unic Availability Factor 56.95%
88.93%
75.07%
55.32%
87.09%
68.97%
- 21. Unit Capacity Factor (Using MDC Net) 55.32%
87.09%
68.97%
- 22. Unit Capacity Factor (Using. DER Net) 0%
0.36%
8.81%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup: June 14, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumulative total Commencing January 1, 1975.
o-u < a sv. um 8203250416 810506 PDR ADOCK 05000244 R
r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT #1. Ginna Station May 6, 1981 DATE
' - ~ -$ A - r-f.&n _ _..--
COMPLETED BY s
Andrew E. McNamara TELEPHONE 1 (315)-524-4446 Ext. 205, 293 MONTil April, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(Mwe. Net) 1 472 17 388 2
472 13 35 472 3
ls 4
472 20 5
472 3
471 g
7 470 23 g
470
~~
24 9
471 gg 10 470 g
n 464 y
12 458 y
13 455 29 14 445
~
30 15
'49 31 16 442 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
am oownt
l IXX:KET NO.
50-244 s*
l
!! NIT NAMi{ 81.GiIna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE Man 6. _1981 COMPLliTED 11Y M_M- - 8.1h _ _ '
%ndrew E. McNamara C
~
REPORT MONTil April, 1981 TELEPilONE I (315)-524-4446 Ext. 205, 293 -
4 m
!q Iy Licensee a
Cowse & Corrective No.
Da te 1
j3 3
1*I Event
$,e 1-8 Action to j:E j
i $ ",
Report #
,]
[d Prevent Recurrence 2
g u
g a
81-2 04-18-81 S
309.5*
C 1
LER 81-007**
Annual Refueling, Modifications and l
Maintenance.
}
l l
4 i
i i
1 1
l
+
(
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions l
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 11-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
~
i E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 4... in ev. ins.
II-Other (Explain)
Exhibis 1 - Same Source l
- 81-2 Shutdown hours in month of April
- Refers to turbine runback on 4/14.
4.
/
HARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO..
50-244 UNIT GINNA STATION. UNIT #1 DATE MAY 6. 1981 COMPLETED BY d'~ ~ "
b Andrew E. McNamara TELEPHONE 1-(315)-524-4446 Ext. 205, 293 MONTH APRIL, 1981 The reactor power level was maintained, for the most part, at 100% until " coastdown" commenced on 4/10. Prior to the start of coastdown, on the same day, a power reduction was initiated to 97% level to perform a periodic test on the auxiliary feed-water system.
On 4/14 a turbine runback was experienced, the cause is ex-plained in LER 81-007.
NOTE:
A summary of safety related maintenance will be submitted at the conclusion of the shutdown.
9 D
49-113 11/783