Monthly Operating Rept for Nov 1981
ML20042B549
Person / Time
Site: Humboldt Bay
Issue date: 12/03/1981
From: Baum P
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20042B545 List:
References
NUDOCS 8203250414
Download: ML20042B549 (4)


Text

O t'

MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of November 1981. This report was prepared by the Plant Staff and is submitted in accordance with Section IX.I.1.c of the Technical Specifications.

During the report period the reactor remained in the cold shutdown mode of operation.

There were no significant events associated with the operation of the Unit. There was no significant maintenance completed during the month.

i f

4 r

l l

8203250414 811204 PDR ADOCK 05000133 R

PDR

\\

p OPERATING DATA REPORT DOCKET NO. 50-/33 DATE / Z. 8 7 COMPLETED BY P. W.6A.m TELEPHONE 7o7/40-2737 OPERATING STATUS

1. Unit Name:

uMoot.W A/

se w Oss? 1 Not'5

2. Reporting Period:

Mo#M OEA ITBI

3. Licensed Thermal Power (MW ):

27O df

4. Nameplate Rating (Gross MWe):

S S~

S. Design Electrical Rating (Net MWe):

df

6. Maximum Dependable Capacity (Gross MWel:

M

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:

N

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

AI/M This Month Yr.-to-Date Cumulative 72.O 8o16

/$O,70P.,

I1. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical O

O 98./7/

13. Reactor Reserve Shutdown Hours O

o O

14. Hours Generator On-Line O

o 97.252.

15. Unit Reserve Shutdown Hours O

o O

16. Gross Thermal Energy Generated (MWH)

O o

/.5~ t/8. 45"d

17. Gross Electrical Eriergy Generated (MWH)

O o

4.7.39.732

18. Net Electrical Energy Generated (MWH)

-/T4

-2304 41.ff/, S*l4

19. Unit Service Factor O

o do.f" 7.

20. Unit Availability Factor O

O 8 0. S"A

21. Unit Capacity Factor (Using MDC Net)

O O

44.97.

22. Unit Capacity FactorIUsing DER Net)

O O

43.57.

23. Unit Forced Outage Rate o

o

/. 9/ 7.

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

Al A M'b6 TEAM /NA E

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (9/771

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

.5~o -/3 3 UNIT N AME H S PP *3 DATE

/A-3-as COMPLETED BY EW,8AM REPORT MONTil TELEPilONE 707/44.3-Z'T 87 "i

3 5

a c

e.

~.

.E _e 8

e.s g Licensee.

Ev.

8%

c Cause & Corrective No.

Date g

3g

,g g 5 Event

?

Action to jd

$E 5

j di g Report

  • A0 Prevent Recurrence d

74 - 4 740707.

S 73.0 C. H l

W/A 5MSM8 C-M DDIFICATs oeJS.

e I

c t

l I

2 3

4 F: Forced Reason:

Method:

Exhibit G-Instructions S: SchedMed A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LERI File (NUREG-D Regulatory west:.ction 4-Other (Explain) 0161)

E Operator Training & Ucense Examination F Administrative 5

G Operational Errur (Explain)

Eshibit I Same Source (9/77)

Il Other (Explain)

I

,'., y a '

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-43 H8PP *3 UNIT DATE 1 2 20 P.W.8Aom COMPLETED BY TELEPHONE 707-if 3'Z787 MONTH OWSA86A DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net t (MWe-Net)

O O

37 1

2 18 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 II 27 12 28 13 29 14 30 if 15 31 Y

16 l

l INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771 l

'