Monthly Operating Rept for Mar 1981
ML20042B543
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/08/1981
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20042B539 List:
References
NUDOCS 8203250408
Download: ML20042B543 (4)


Text

.

O-o

-I-OPERATING DATA REPORT DOCKET NO.

50-244 DATE 4/_8 /8,1 COMPLETED BY M>b h.MW c '

Andiew E. McNamarab TELEPilONE 1 (315)-524-4446 OPERATING STATUS Ext. 205, 293

1. Unit Name:

GINNA STATION. UNIT #1 Notes: The reactor power level

2. Reporting Period:

March, 1981 was maintained at the 100%

1520 level for the majority of the

4. Licensed Thermal Power (MW ):

490 reporting period.

Exceptions

6. Nameplate Rating (Gross MWe):

470 are detai. led on Page 4.

s. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

H. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

g 74,lative$d 052 This Month Yr.-to-Date f Cumu 744 2,160

(

99,456

11. Ilours In Reporting Period 744 2,160 b 99,858.45_
12. Number of Hours Reactor Was Critical 0

0 16,331.22*

l4 Reactor Reserve Shutdown llours 744 2,150.75 74,782.38 l-1. Ilours Generator On.Line 0

0 8.5*

15. Una Reserve Shutdown llours
16. Gross Thermal Energy Generated (MWil) 1,118,424 3,180,048 101,382,250 365,979 1,042,968 32,983,067
17. Gross Electrical Energy Generated (MWil)

IH. Net E!cetrical Energy Generated (MWil) 348,143 991,533 31,247,078"*

19. Unit Service Factor 100%

99.57%

75.19%

100%

99.57%

75.20%

20. Unit Availability Factor 99.56 97.67%

69.07%

21. Unit Capacity Factor (Using MDC Net) 99.56 97.67%

69.07%

2. Unit Capacity Factor (Using DER Net) 0 0.42%

8.86%

3. Unit Forced Outage Rate
1. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

- Re fueling, Maintenance and Modifications--4/18/81.

(10 Weeks)

Ota ensa. 5. If Shut Down At End Of Report Period, Estimated Date of Startup:

oO

6. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved C"8 INITIAL CRITICALITY o

b INITIAL ELECTRICITY COMMERCIAL OPERATION oo in o

  • Cumulative Total Commencing January 1, 1975.

ni<c O

g a s-s e (REv. t/7en O$ ggCorrects error in addition of 2 MWe in January, 81 report (D a.a-

/

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 244 UNIT #1. Ginna Station DATE 4/8/81 "w--

COMPLETED BY

^

Andrew E. McNamaha TELEPHONE 'l (315)-524-4446 Extension 205, 293 MONTil March, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 472 471 17 2

472 471 18 473 471 3

gg 4

473 471 23 471 344 5

gg 472 471 y

472 471 7

23 471 g

24 468 25 473 473' 474 10 28 11 473 472 27 471 472 12 2g 473 472 13 25 14 472 30 473 472 472 15 31 473 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, f

Compute to the nearest whole megawatt.

I

^ ^ ~ -

IXX:KET NO.

50-244 tlNIT NAMF. _fl Gimna Station a

UNIT SHUTDOWN AND POWER REDUCTIONS DATE

'l8L81 l

COMPLETED IlY d Y - " ? - M"

^

Andfew E. McNama W j

REPORT MONTII March, 1981 TELEPilONE 1-(315)-524-4446 i

Extensions-205, 293 m

n e

o=u Licensee e,

gm Cause & Corrective e

No.

Date 1

jj

]o,j,I Event 2.g

!j 1

Action to gz g

;ji,

Report #

  1. j u

Prevent Recurrence 2

u oo No Outages or Significant Power Reductions to report.

1 i

1 2

3 4

F: Forced Reason:

Method:

Ext.ibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Erplain) 5 w

4... insv. i/7 >

li-Other (Explain)

Exhibit 1 - Same Source

i 4

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50 244 UNIT CINNA STATION. UNIT #1 DATE 4/8/81 m _F b-M "-- 2 ' - -

COMPLETED BY Andrew E. McNamara TELEPHONE 1-(315)-524-4446 Ext. 205, 293 MONTH March, 1981 The reactor power level was n'.intained at 100% for the majority of the report month with a few exceptions:

On March 5th, 8th, 9th, lith and 12th, the reactor power level was reduced slightly for a short period of time to perform periodic tests.

On March 21st, the reactor power level was reduced to N 48% to repair tube leaks in the "B" condenser.

a 49 123 (1/79p

- - -