Monthly Operating Rept for Feb 1981
ML20042B534
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/10/1981
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20042B514 List:
References
NUDOCS 8203250400
Download: ML20042B534 (5)


Text

'

1 OPERATING DATA REPORT.

DOCKET NO.

50-244 DATE Marc.h 10, 1981 COMPLETED BY M^^ bJ E MS-f - -

1 Andrew E. McNa% ara TELEPHONE 1-(315)-524-4446 OPERATING STATUS EXT. 205, 293

1. Unit Name:

GINNA STATION. UNIT #1 Notes :

2. Reporting Period: February, 1981 1520 The reactor power level was
3. Licensed Thermal Power (MWt):

490 maintained at 100% during the

4. Nameplate Rating (Gross MWe):

470 majority of the report month,

5. Design Electrical Rating (Net MWe):

with a few exceptions.

6. Maximum Dependable Capacity (Gross MWe):490 Detailed on Page 4.

470

7. Maximum Dependable ~apacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

-F

9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 672 1.416

98. 712
11. Ilours la Reporting Period 672 1,416 75, 816.52
12. Number of flours Reactor Was Critical 0

0 1,631.32*

13. Reactor Reserve Shutdown Hours 672 1,406.75 74,038.38
14. Ilours Generator On Line 0

0 8.5*

15. Unit Reserve Shutdown Hours 1,018,488 2,061,624 100.263.826
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 334,188 676.989 32.617s088
18. Net Electrical Energy Generated (MWil) 318,022 643,390 30,898,933 100%

99.35%

75.00%

19. Unit Service Factor 100%

99.35%

75.01%

20. Unit Availability Factor 100.69%

96.67%

68.84%

21. Unit Capacity Factor (Using MDC Net) 100 69%

96.67%

68.84%

22. Unit Capacity Factor (Using. DER Net) 0%

0.65%

8.94%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refueling, maintenance and modifications --4/4/81 10 Weeks

,g

-vo

- N D-

25. If Shut Down At End Of Report. Period, Estimated Date of Startup:

no oJ

26. Units in Test Status (Prior to Commercial Operation):

Foreca st Achi-w c',

U o INITIAL CRITICALITY 8:s:

INITIAL ELECTRICITY N

COMMERCIAL OPERATION an o N<

Qg

  • Cumulative Total Commencing January 1, 1975.

a-a m e v. um no QJ C. E m.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 244

  1. 1. Ginna Station UNIT March 10, 1981 DATE COMPLETED BY

- ~-

Andrew E. McNamara' TELEPHONE 1-(315)-524-4446 EXT. 205, 293 February MONTil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M We-Net)

(MWe-Net) 1.

473 473 37 474 2

18 474 474 475 3

19 473 473 4

20 474 5

21 473 474 472 g

22 474 473 7

23 8

474 471 24 474 472 8

25 474 473 10 28 474 474 33 27 b

474 I2 gg 472 13 29

~~~

14 472 30 472 15 473 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l L------ ---

  • e er nav..f.o

DOCKET NO.

50-244 IINITNAME 3,Ginna Surion UNIT SHUTDOWN AND POWER REDUCTIONS DATE M rch 10, 1931_

COMPLETEDItY_ b l-

" &. A* Andrew E. McNamah REPORT MONTil. February TELEPilONE 1-G15)-524-4446 EXT. 205, 293~

l m

an n

e Eq o

Licensee e,

gm Cause & Corrective e

e o No.

Date 1

j j

]o { j Event 2.g

!j a

Action to e

gI y

ie Report #
  1. j u

Prevent Recurrence 2

g u

O NO SHUT DOWN OR MAJOR POWER REDUCTIONS TO REPORT.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data ll-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain) m 4....

in c v. i/re, li-Other (Explain)

Exhibit 1 - Same Source

.e 4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE 1

I DOCKET NO.

50-244 l

UNIT GINNA STATION, UNIT #1 DATE MARCH 10, 1981 COMPLETED BY "b-r'-

Andrew E. McNama N TELEPHONE 1-(315)-524-4446 EXT. 205, 293 MONTH February The reactor power was maintained at the LOO % level for the majority of the report month, with a few minor re-ductions.

These reductions were:

A turbine run-back due to an instrument channel spike and some periodic tests on the auxiliary feedwater system.49-123 (1/783

=

's GINNA STATION MAINTENANCE REPORT FEBRUARY, 1981 During February, normal maintenance and inspections were performed.

Major safety related maintenance included:

Replacement of a failed amplifier on one pressurizer level transmitter.

Preventive overhaul of the IC service water pump and motor.

Repair of spring on one new fuel assembly.

Replacement of two drain plugs on the motor cooler for the 1C containment fan cooler that were leaking.

'ss b

l l

l l

l