ML20042B522

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1981
ML20042B522
Person / Time
Site: Humboldt Bay
Issue date: 03/09/1981
From: Weeks E
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20042B523 List:
References
NUDOCS 8203250390
Download: ML20042B522 (1)


Text

e PACIFIC OAS AND E LE C T RIC C O M PANY FOW3 l

77 9EALE STREET

  • SAN FRANCISCO, CAL:FORNIA 94106. (415) 781-4211 a TWX 910 372-6587 b

JAMES o SHIFFER DEPORTMENT OF NUCLEAR PLANT OPERATCNS NUCLEAR POWER GENERATION March 9, 1981 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 sc-Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the completed monthly report forms and the na- '.tive of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for February,1981. These forms and the narrative are submitted in accordance with Section IX I.l.c of our Technical

~ Specifications.

Sincerely, E D. taal/

E. D. Weeks Plant Superintendent Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)

Enclosure cc:

hr. J. D. Shiffer Mr. R. H. Engelken, Director Directorate of Regulatory Operations Region V Office U. S. Nuclear Regulatory Commission 1990 N. California Boulevard Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596 g 63 EDWeeks:me 3

8203250390 810309

/

PDR ADOCK 05000133 W

PDR