ML20042B296

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1151/82-03 on 820208-12.No Noncompliance Noted
ML20042B296
Person / Time
Site: Westinghouse
Issue date: 03/01/1982
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Damore M
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20042B297 List:
References
NUDOCS 8203250194
Download: ML20042B296 (2)


Text

i

[.dfr i

~

MAR 0 L1982 Westinghouse Electric Corporation

  • [jpu%

s

.s s

ATTN: Mr. M. D' Amore, Manager p/

V Columbia Plant

~7

^,'N 3

"~

Nuclear Fuel Division M@ g 4 7gg* b Drawer R z-n y;:mm

~

'G Columbia, SC 29205

'y'e am" n

V{Q. d Gentlemen:

a

Subject:

Report No. 70-1151/82-03 This refers to the routine safety inspection conducted by Mr. G. L. Troup of this office on February 8-12, 1982, of activities authorized by NRC License No SNM-1107 for the Columbia Nuclear Fuel facility and to the discussion of our findings held with you and members of your staff at the conclusion; of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

P Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be piaced in the NRC's Public Document Room unless you notify this office, by i

telephone, within ten days of the date of this letter and submit written j

application to withhold information contained therein within thirty days of the I

date of this letter. Such application must be consistent with the requirements of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss tnem with you.

l Sincere l

ltdL l

A. F. Gibson, Chief Technical Inspection Branch Division of Engineering and Technical Programs j

Enclosure (See Page 2) 8203250194 820301 PDR ADOCK 07001151

[h] s C

PDR

Westinghouse Electric Corporation 2

Enclosure:

Inspection Report No. 70-1151/82-03 bec w/ encl:

Document Management Branch State of South Carolina

'bec w/o encl:

License Fee Management Branch i

t l

1 l

RII RII RII s

[(d'<{N1 pine A P Gibson es 2/ts/82 2/.2482 2

82