ML20042B120
| ML20042B120 | |
| Person / Time | |
|---|---|
| Issue date: | 03/11/1982 |
| From: | Eadie G NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Wogman N Battelle Memorial Institute, PACIFIC NORTHWEST NATION |
| Shared Package | |
| ML20042B121 | List: |
| References | |
| CON-FIN-B-2217, REF-WM-40 NUDOCS 8203240587 | |
| Download: ML20042B120 (2) | |
Text
l Pin rdorn 4o WMuR M 2-SS DISTRIBUTION MAR 1 ' 1992 Pro.iect WM_40-WMUR s/f 426.3 B-2217 40/f1NE/82/03/09/0 WMUR w/f (2) WMUR r/f WM r/f NMSS r/f P,g, WMUR:GGE GEadie WM-40/426.3 HPettengill BFisher Dr. N. A. Wogman, flanager JLinehan Radiological and Inorganic Chemistry Section DMartin Battelle Pacific Northwest Laboratories RScarano P.O. Box 999 RBrowning Richland, WA 99352 JMartin
Dear Dr. Wogman:
N
,q I have reviewed Program (B-2217)your monthly report for the Edgemont Cleanup Actio'n for January,1982, and have the following comchrit's,:,g" j
w,f o
You should continue to emphasize completing all remaining full M'd J, /sd 1) e i ]
engineering assessments at those properties which have been identified to date as requiring such full _EAs.
^N4 A
s-2)
Your evaluation of the mini-EA protocol should be completed and['
a\\
l reported no later than your March,1982 monthly letter report.
' ^ ~
3)
Your RPISU summary report should be completed and reported no later than your May,1982 monthly letter report.
4)
Please continue to provide a summary of the response you obtain from the permission letters sent to the remaining homeowners to permit BPNL to complete the radiological surveys. All homeowners should be personally contacted by May,1982; so that your final report may be completed no later than your June,1982 monthly letter report.
5)
Your revised summary tables for the grab Working Level Surveys and the Lot Surveys were acceptable.
6)
As soon as they are available, please provide all ARIX, Inc.
architect-engineering assessment reports in the next monthly letter report following their receipt from ARIX, Inc.
7)
Your Financial Statement was acceptable.
Please continue to keep me informed of any increased costs due to the subcontract arrangement with ARIX, Inc. for the performance of architect-engineering services necessary to complete the. engineering assessment reports.
DIST:
TICKET N0:
0FC NAME :
.DATE :82/03/10
-8203240587 820311 PDR WASTE 6
f I
1 I
e 40/l1NE/82/03/09/0
_2-vAp 7 7 ggp l
All other aspects of your January,1982 report were acceptable. The t
actions taken in this letter are considered to be within the scope of the i
currentcontract(B-2217).
No changes to costs or delivery of contract products are authorized.
Please notify me immediately if you believe l
this letter would result in changes of contract products.
l I
i i
Ulut.M cauLU BY I
Gregory G. Eadie t
Operating Facility Section II
(
Uranium Recovery Licensing Branch j
Division of Waste fianagement CC:
R. Perkins - PNL f
P. O. Jackson - PNL f
i i
J i
f o
t i
i i
DIST:
TICKET N0:
i
- 0FC
- WMUR fa
- /WMUR
_____:_____4.
f
(_______gj]g2)_,_,>:.___________:.___________::___________:____________:________
lNAME :GEadie:me
- HPetten
_ _ _ _ _ _ _1. _ _ _ : _ _ _ _ _ _ _ _g i l l :
l DATE :82/03/10
- 82/03/10
l l
OBaneHe Pacific Nnrthwest Laboratories P.O. Box 999 Richland, Washington U.S.A. M352 Telephone (509) FTS 444-3780 Telex 15-28N February 11, 1982 Mr. Gregory G. Eadie Uranium Recovery Licensing Branch Division of Waste Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Eadie:
Enclosed is the letter report on "Edgemont Remedial Action Program" (B-2217) for the month of January 1982.
Very truly yours,
. 0 AW4 en l)h P. O. Jackson Research Scientist Radiological & Inorganic Chemistry Section PHYSICAL SCIENCES DEPARTMENT Y
. //
6 }/lAtte R. W. Perkins N. A'. Wogman (
Associate Department Manager Project Manager cc: HJ Pettengill, NMSS (1)
E Redden, DOE Germantown Encl.
(EV/ SED) (1)
R Ramsey, DOE Germantown (1)
Office of the Director, NMSS (Attn:
Program Support) (1)
J Themelis, DOE / Grand Junction (1) t N.
r
... _.,.