Monthly Operating Rept for Aug 1980
ML20042B002
Person / Time
Site: Ginna 
Issue date: 09/05/1980
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20042B001 List:
References
NUDOCS 8203240381
Download: ML20042B002 (6)


Text

e

.g.

OPERATlHG DATA REPORT DOCKET NO.

50-244 DATE Raneamher %-

togn d

d-

-d-COMPLETED BY Andrew E. McNamaia TELEPHONE 1 (315) 524-4446 OPER ATING STATUS Ext. 205, 293

1. I' nit Name:

GINNA STATION. UNIT #1 Notes The Reactor Power Level

1. Reporting Period: Aunust. 1980 averaged 100% for the Report 1520 Period, with the following 4.1.icensed Thermal Power (Mit):

Aan exception: On 8/10, the

i. Nameplate Rating (Gross MWe):

470 power level was reduced to W

5. Design Electrical Rating (Net MWe):

44% for a short period, to

6. Maximum Dependable Capacity (Gross MWe):

490 perform Turbine Protection &

470 cmme,m1 v..e.

'. Maximum Dependable Capacity (Net MWe):

H. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr. to Date Cumulative

11. Ilours in Reporting Period 744 5.855 94.367.00
12. Number of flours Reactor Was Critical 744 4.554.25

_.72.234.02 Ii Reactor Reserve Shutdown flours 0

0 1.621.57

  • 744 4,515.25 70,471.88
11. Ilours Generator On-Line 0

0 R_9

15. Unic Reserve Shutdown flours
16. Gross Thermal Energy Generated (MWil) 1.119.528 6.682.00R 44_os7 A n
17. Gross Electrical Energy Generated (MWII) 361.976 2.190.013 30.875.804 lH. Net Electrical Energy Generated (MWil) 343 050 7,nat o?R oo,9A3,A7A
19. Unit Service Factor 100%

77.11%

74.67%

20. Unic Availability Factor 100%

77.11%

74.68%

21. I' nit Capacity Factor (Using MDC Net) 98.36%

75.65%

68.25%

22. Unit Capacity Factor (Using DER Net)

QA 3AY 79 A;Y AR 99Y

23. Unit Forced Outage Rate 0

0 9.33%

2 6. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Schadulad-Remnm ('anarnene Tnansceinn & MnA4 ficnrinn - 10/25 thru 11/26

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Cumulative data commencing January 1,1975

...... n cv. um 8203240381 800905 PDR ADOCK 05000244 R

PDR

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 244 UNIT #I GI"""SI "

DATE September 5, 1980

[ y dy4r - ---.

COMPLETED BY Andrew E. McNamara TELEPHONE 1 (315) 524-4446 Ext. 205, 293 MONTil August, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 464 gy 462 2

463 18 463 3

461

3 462 4

461 462 20 5

^^7 21 476 g

461 22 475 1

458 23 476 g

459 476 24 5

459 25 474 Ig 388 470 26 11 459 27 466 12 462 28 465 13 460 25

&^^

14 462 30 47I 15 462 31 466 16 661 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the neares: whole megawatt.

aav..i..

IXX KET NO.

50-244 llNIT NAMI:.81aGinna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE -_s e ber 5 1980 COMPLETED ltY

_b dJS"" '

Andrew E. McNamafa REPORT MONTilAvicinar-14R0 lELEPilONE 1 (515) 524-4446 Ext. 205. 293 l

m Eq No.

Date

{

jj

}I*j o

Licensee e,

a Cause & Corrective Event j4

!j 1

Action to r

gz y

;llj Report #
  1. j u

Prevent Recurrence e

2 g

u o

No shutdowns or significant power p

j reductions to report.

J l

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 14fanual for Preparation of Data ll-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative.

5 G-Operational Error (Explain)

..... m c v. ine i ll-Other (Explain)

Exhibit I - Same Source

I 4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT #1, Ginna Station DATE September 5, 1980

^-

COMPLETED BY AndrewE.McNapara TELEPHONE 1 (315) 524-4446 Ext. 205, 293 MONTli August, 1980 The reactor power level averaged 100% for the report month, with the following exception:

On 8/10 the reactor power level was reduced to u44% to perform a series of Turbine Protection and Control Tests. The reactor power level was restored to 100% after the tests and remained there for the balance of the month.

I l

i l

l

< s.m < u w

5-Ginna Station Maintenance Report for August, 1980 During August, normal inspections and minor maintenance was performed.

The only major safety related maintenance was replacement of a faulty Q flux controtter feeding Channel II of the Reactor Protection System.

t I

en

,-e.

e---

-- -~

-x---,-

m,

- ---+ - --

3-h-

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE September 11, 1980 COMPLETED BY

~ ^ ' ^ '

Andrew E. McNamara '

TELEPHONE 1 (315) 52h hhh6 Ext. 205, 293 August, 1980 MONTH

(. Revised 9/8/80}

The reactor power level averaged 100% for the report month, with the following exceptions:

On 8/10 the reactor power level was reduced to ~ hh% to perform a series of Turbine Protective and Control Tests. The reactor power level was restored to 100% after the test.

On 8/22 the reactor power level was reduced to - 995 to perform a periodic test on the Auxiliary Feedvater System.

On 8/26 the reactor power level was reduced to 95% due to a t'urbine runback.

On 8/27 the reactor power level was reduced to a 97% to perform a periodic test on the Auxiliary Feedvater System.

4,.t 2 3 11/763