Text
e
.g.
OPERATlHG DATA REPORT DOCKET NO.
50-244 DATE Raneamher %-
togn d
d-
-d-COMPLETED BY Andrew E. McNamaia TELEPHONE 1 (315) 524-4446 OPER ATING STATUS Ext. 205, 293
- 1. I' nit Name:
GINNA STATION. UNIT #1 Notes The Reactor Power Level
- 1. Reporting Period: Aunust. 1980 averaged 100% for the Report 1520 Period, with the following 4.1.icensed Thermal Power (Mit):
Aan exception: On 8/10, the
- i. Nameplate Rating (Gross MWe):
470 power level was reduced to W
- 5. Design Electrical Rating (Net MWe):
44% for a short period, to
- 6. Maximum Dependable Capacity (Gross MWe):
490 perform Turbine Protection &
470 cmme,m1 v..e.
'. Maximum Dependable Capacity (Net MWe):
H. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr. to Date Cumulative
- 11. Ilours in Reporting Period 744 5.855 94.367.00
- 12. Number of flours Reactor Was Critical 744 4.554.25
_.72.234.02 Ii Reactor Reserve Shutdown flours 0
0 1.621.57
- 744 4,515.25 70,471.88
- 11. Ilours Generator On-Line 0
0 R_9
- 15. Unic Reserve Shutdown flours
- 16. Gross Thermal Energy Generated (MWil) 1.119.528 6.682.00R 44_os7 A n
- 17. Gross Electrical Energy Generated (MWII) 361.976 2.190.013 30.875.804 lH. Net Electrical Energy Generated (MWil) 343 050 7,nat o?R oo,9A3,A7A
- 19. Unit Service Factor 100%
77.11%
74.67%
- 20. Unic Availability Factor 100%
77.11%
74.68%
- 21. I' nit Capacity Factor (Using MDC Net) 98.36%
75.65%
68.25%
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
0 9.33%
2 6. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Schadulad-Remnm ('anarnene Tnansceinn & MnA4 ficnrinn - 10/25 thru 11/26
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cumulative data commencing January 1,1975
...... n cv. um 8203240381 800905 PDR ADOCK 05000244 R
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 244 UNIT #I GI"""SI "
DATE September 5, 1980
[ y dy4r - ---.
COMPLETED BY Andrew E. McNamara TELEPHONE 1 (315) 524-4446 Ext. 205, 293 MONTil August, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 464 gy 462 2
463 18 463 3
461
- 3 462 4
461 462 20 5
^^7 21 476 g
461 22 475 1
458 23 476 g
459 476 24 5
459 25 474 Ig 388 470 26 11 459 27 466 12 462 28 465 13 460 25
&^^
14 462 30 47I 15 462 31 466 16 661 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the neares: whole megawatt.
aav..i..
IXX KET NO.
50-244 llNIT NAMI:.81aGinna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE -_s e ber 5 1980 COMPLETED ltY
_b dJS"" '
Andrew E. McNamafa REPORT MONTilAvicinar-14R0 lELEPilONE 1 (515) 524-4446 Ext. 205. 293 l
m Eq No.
Date
{
jj
}I*j o
Licensee e,
a Cause & Corrective Event j4
!j 1
Action to r
gz y
- ;llj Report #
- j u
Prevent Recurrence e
2 g
u o
No shutdowns or significant power p
j reductions to report.
J l
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 14fanual for Preparation of Data ll-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative.
5 G-Operational Error (Explain)
..... m c v. ine i ll-Other (Explain)
Exhibit I - Same Source
I 4-NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT #1, Ginna Station DATE September 5, 1980
^-
COMPLETED BY AndrewE.McNapara TELEPHONE 1 (315) 524-4446 Ext. 205, 293 MONTli August, 1980 The reactor power level averaged 100% for the report month, with the following exception:
On 8/10 the reactor power level was reduced to u44% to perform a series of Turbine Protection and Control Tests. The reactor power level was restored to 100% after the tests and remained there for the balance of the month.
I l
i l
l
< s.m < u w
5-Ginna Station Maintenance Report for August, 1980 During August, normal inspections and minor maintenance was performed.
The only major safety related maintenance was replacement of a faulty Q flux controtter feeding Channel II of the Reactor Protection System.
t I
en
,-e.
e---
-- -~
-x---,-
m,
- ---+ - --
3-h-
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE September 11, 1980 COMPLETED BY
~ ^ ' ^ '
Andrew E. McNamara '
TELEPHONE 1 (315) 52h hhh6 Ext. 205, 293 August, 1980 MONTH
(. Revised 9/8/80}
The reactor power level averaged 100% for the report month, with the following exceptions:
On 8/10 the reactor power level was reduced to ~ hh% to perform a series of Turbine Protective and Control Tests. The reactor power level was restored to 100% after the test.
On 8/22 the reactor power level was reduced to - 995 to perform a periodic test on the Auxiliary Feedvater System.
On 8/26 the reactor power level was reduced to 95% due to a t'urbine runback.
On 8/27 the reactor power level was reduced to a 97% to perform a periodic test on the Auxiliary Feedvater System.
4,.t 2 3 11/763