-l-OPERATING DATA REPORT DOCKET NO.
50-244 DATE 8/3/JO E. w
-= ~
COMPLETED BY Andrew E. McNamarb-TELEPHONE 1-(315)-524-4446 OPERATING STATUS Ext. 205, 293
- 1. Unit Name:
GINNA STATION. UNIT et Notes The Reactor Power Level July, 1980
- 2. Reporting Period:
averaged 1007. for the most 1520
- 3. Licensed Thermal Power (MWt):
part during the report month; 490 the exceptions are detailed
- 4. Nameplate Rating (Gross MWe):
470 on page 4.
- 5. Design Electrical Rating (Net MWe):
490
- b. Itaximum Dependable Capacity (Gross MWe):
470
'. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, if Any:
This Month Yr. to-Date Cumulative 744 5.111 93.623 i1. Ilours In Reporting Period 744 3,810.25 71.490.02
- 12. Number of Hours Reactor Was Critical 0
0 1.621.57
- IL Reactor Reserve Shutdown Hours 744 3,771.25 69,727.88 I.i. Ilours Generator On-Line 0
0 0.5 *
- 15. Unit Reserve Shutdown Hours 1.120.680 5.562.480 93.838.282
- 16. Gross Thermal Energy Generated (MWH) 367.149 1.828.037 30.513.828
- 17. Gross Electrical Energy Generated (MWH) 349.162 1.737.969 28.899.517
- 18. Net Electrical Energy Generated (MWH) 1007.
73.797.
74.487.
- 19. Unit Service Factor 1007.
73.797.
74.497.
- 20. Unic Availability Factor 99.857.
72.34%
687.
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 99 857-72.347.
687.
0 0
9.437.
2A Unic Forced Outage Rate
- 21. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Scheduled: Steam Generator Inspection and Modification - 10/24 thru 11/23
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achievd INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cumulative total cot:nnencing January 1,1975
..... m a v. in.,
8203240374 800811 PDR ADOCK 05000244 R
2-AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50 244
- 1. Ginna Station UNIT 8/8/80 DATE Mf. D e- - _
COMPLETED BY Andrew E. McNamar'a TELEPHONE 1-(315)-524-4446 Ext. 205 293 July, 1980 MONTil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER I.EVEL (MWe-Net)
(MWe. Net) 1 479 17 670 2
479 13 468 3
478 IS 46.8
'77 468 4
20 5
477 21 464 476 466 6
22 1
475 23 469 477 470 g
24 470 475 25 473 467 10 28 11 446 27 468 470 470 12 28 468 13 471 29 440 465 14 30 464 15 471 31 Ig 469 b
]
A10'"?* M 0%
p INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l l
49 87 t R EV. 9/70
IMX:MiT NO.
50-244
.~
IfN T NAM!i 81aGinna Station 8/ /80 UNIT SHUTDOWN AND POWER REDUCTICHS D^l t-
, ^ e,8
- gg - ' ^ - "
(.OMPI.lTliD 14), ~ n'dfew DcNaisidra~ ~ ~
RiiPORT if0NTil July, 1980 TEL((PilONE 1-(315)-524-4446 Ext. 205, 293 cm Eq o"
Licensee s,,
vi Cause & Corrective e
No.
Date 1
is 2
1,* E Event
{.
1 -3 Action to o:E E
j$$
Repor #
- 3 5u Prevent Recurrence E
cm x
n u
o O
M No outages or significant power reductions to report.
I 2
3 4
F: Forced Reason:
Licehod:
Exhibis G - Instructions S: Scheduled A-Equipment Failure (limplain) 1 -hfa nual for Preparation of Data ll-hfaintenance or Tes 2-ht.inual Scram.-
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Evens Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & l.icense Examin.ision F-Administrative 5
1 G-Operational Error (Explain) 4.ee u.ev.in.
II-Osher (linplain)
Exhihin 1 - Same Source
5
. NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50 244 UNIT Ginna Station, Unit #1 DATE 8/8/80 d-N ~ct
COMPLETED BY Andrew E. McNamah TELEPHONE 1-(315)-524-4446 Ext. 205, 293 MONTH July, 1980 The reactor power level was maintained at 100% for the majority of the report month; with the following exceptions:
On 7/11, the reactor power level was reduced to 70% due to low boron concentration in the boric acid storage tanks. The power level was restored to 100% by 2400, same date.
On 7/14, the reactor power level was reduced to u 93% @ 0725, due to low boron concentration in the boric acid storage tank. The power level was restored to 100% by 1041. At 1042 another power level decrease was initiated, to the 70%
level, due to high boron concentration in the boric acid storage tanks. The power level was restored to 100% by 1950, af ter further tests of the boron concentration showed that a contaminated reagant was being used in the Chemistry Laboratory to determine the boron concentration in the boric acid storage tanks.
(These power level fluctuations were reported via LER 80-006).
r t
s e
49 123 (1/703
(
. GINNA STATION MAINTEMANCE REPORT FOR JULY 1980 During July, normal inspections and minor maintenance was per-formed. Major safety related maintenance included:
- 1. Inspection of the l A Reactor Coolant Drain Tank Pump as part of the preventive maintenance program.
- 2. Inspection of the ID Service Water Pump and Motor as part of the preventive maintenance program.
- 3. Repacking of the IC Charging Pump.
- 4. Continuity verification of all safety related W-2 switches.