Monthly Operating Rept for Jul 1980
ML20042A997
Person / Time
Site: Ginna 
Issue date: 08/08/1980
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20042A995 List:
References
NUDOCS 8203240374
Download: ML20042A997 (5)


Text

,

e b

1 1

-l-OPERATING DATA REPORT DOCKET NO.

50-244 DATE 8/3/JO E. w

-= ~

COMPLETED BY Andrew E. McNamarb-TELEPHONE 1-(315)-524-4446 OPERATING STATUS Ext. 205, 293

1. Unit Name:

GINNA STATION. UNIT et Notes The Reactor Power Level July, 1980

2. Reporting Period:

averaged 1007. for the most 1520

3. Licensed Thermal Power (MWt):

part during the report month; 490 the exceptions are detailed

4. Nameplate Rating (Gross MWe):

470 on page 4.

5. Design Electrical Rating (Net MWe):

490

b. Itaximum Dependable Capacity (Gross MWe):

470

'. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr. to-Date Cumulative 744 5.111 93.623 i1. Ilours In Reporting Period 744 3,810.25 71.490.02

12. Number of Hours Reactor Was Critical 0

0 1.621.57

  • IL Reactor Reserve Shutdown Hours 744 3,771.25 69,727.88 I.i. Ilours Generator On-Line 0

0 0.5 *

15. Unit Reserve Shutdown Hours 1.120.680 5.562.480 93.838.282
16. Gross Thermal Energy Generated (MWH) 367.149 1.828.037 30.513.828
17. Gross Electrical Energy Generated (MWH) 349.162 1.737.969 28.899.517
18. Net Electrical Energy Generated (MWH) 1007.

73.797.

74.487.

19. Unit Service Factor 1007.

73.797.

74.497.

20. Unic Availability Factor 99.857.

72.34%

687.

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 99 857-72.347.

687.

0 0

9.437.

2A Unic Forced Outage Rate

21. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Scheduled: Steam Generator Inspection and Modification - 10/24 thru 11/23

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achievd INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Cumulative total cot:nnencing January 1,1975

..... m a v. in.,

8203240374 800811 PDR ADOCK 05000244 R

PDR

2-AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50 244

  1. 1. Ginna Station UNIT 8/8/80 DATE Mf. D e- - _

COMPLETED BY Andrew E. McNamar'a TELEPHONE 1-(315)-524-4446 Ext. 205 293 July, 1980 MONTil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER I.EVEL (MWe-Net)

(MWe. Net) 1 479 17 670 2

479 13 468 3

478 IS 46.8

'77 468 4

20 5

477 21 464 476 466 6

22 1

475 23 469 477 470 g

24 470 475 25 473 467 10 28 11 446 27 468 470 470 12 28 468 13 471 29 440 465 14 30 464 15 471 31 Ig 469 b

]

A10'"?* M 0%

p INSTRUCTIONS l

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l l

49 87 t R EV. 9/70

IMX:MiT NO.

50-244

.~

IfN T NAM!i 81aGinna Station 8/ /80 UNIT SHUTDOWN AND POWER REDUCTICHS D^l t-

, ^ e,8

  • gg - ' ^ - "

(.OMPI.lTliD 14), ~ n'dfew DcNaisidra~ ~ ~

RiiPORT if0NTil July, 1980 TEL((PilONE 1-(315)-524-4446 Ext. 205, 293 cm Eq o"

Licensee s,,

vi Cause & Corrective e

No.

Date 1

is 2

1,* E Event

{.

1 -3 Action to o:E E

j$$

Repor #

  1. 3 5u Prevent Recurrence E

cm x

n u

o O

M No outages or significant power reductions to report.

I 2

3 4

F: Forced Reason:

Licehod:

Exhibis G - Instructions S: Scheduled A-Equipment Failure (limplain) 1 -hfa nual for Preparation of Data ll-hfaintenance or Tes 2-ht.inual Scram.-

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Evens Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & l.icense Examin.ision F-Administrative 5

1 G-Operational Error (Explain) 4.ee u.ev.in.

II-Osher (linplain)

Exhihin 1 - Same Source

5

. NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50 244 UNIT Ginna Station, Unit #1 DATE 8/8/80 d-N ~ct

COMPLETED BY Andrew E. McNamah TELEPHONE 1-(315)-524-4446 Ext. 205, 293 MONTH July, 1980 The reactor power level was maintained at 100% for the majority of the report month; with the following exceptions:

On 7/11, the reactor power level was reduced to 70% due to low boron concentration in the boric acid storage tanks. The power level was restored to 100% by 2400, same date.

On 7/14, the reactor power level was reduced to u 93% @ 0725, due to low boron concentration in the boric acid storage tank. The power level was restored to 100% by 1041. At 1042 another power level decrease was initiated, to the 70%

level, due to high boron concentration in the boric acid storage tanks. The power level was restored to 100% by 1950, af ter further tests of the boron concentration showed that a contaminated reagant was being used in the Chemistry Laboratory to determine the boron concentration in the boric acid storage tanks.

(These power level fluctuations were reported via LER 80-006).

r t

s e

49 123 (1/703

(

. GINNA STATION MAINTEMANCE REPORT FOR JULY 1980 During July, normal inspections and minor maintenance was per-formed. Major safety related maintenance included:

1. Inspection of the l A Reactor Coolant Drain Tank Pump as part of the preventive maintenance program.
2. Inspection of the ID Service Water Pump and Motor as part of the preventive maintenance program.
3. Repacking of the IC Charging Pump.
4. Continuity verification of all safety related W-2 switches.

I i

i l

i i