_ _. _ _ _n:
I OPERA 1'ING DM REPORE i
DOCKEP NO.
50-244 DATE January 9, 1982 (DMPLETED BY /L L - 2.M= ~
Andrew E. McNamart-TELEPBCNE 1 (315) 524-4446 OPERATING STA'IUS Ext. 205 or 293
- 1. Unit Nane: GIltiA STATI N, UNIT #1 Notes: 'Ihe reactor power level was
- 2. Reporting Period: January, 1982 mair*ained at 100%, generally, fraa
- 3. Licensed 'Ibermal Power (IWt):
1520 1/1 to 1/25, with a few minor excep-l
- 4. Nameplate Rating (Gross M e):
490 tions. Unit shutdown on 1/25 and re '
- 5. Design Electrical Rating (Net Me): 470 mained so at end of report period.
- 6. Maxistan Dependable Capacity (Gross IWe): 490 l
- 7. Maximan Dependable Capacity (Net IWe):
470
- 8. If Changes Occur in Capacity Ratings (Itens Ntmeer 3 through 7) Since Last Report, Give Reasons:
- 9. Power Iavel to Which Restricted, If Any (Net IMe):
- 10. Reasons For Restrictions, If Any:
'Ihis Month Yr.-to-Date n - i1=Pive
- 11. Hours In Reporting Period 744 744 106,800.00
- 12. Ntaber of Bours Reactor Was Critical 585.5 585.5 82,228.12 i
l
- 13. Reactor Reserve Shutdown Bours 0.00 0.00 1,631.32 *
- 14. Bours Generator On-Line 5$5.5 585.5 80,413.13
- 15. Unit Reserve Shutdown Bours 0.00 0.00-8.50 *
- 16. Gross '1hermal Energy Generated (PMB) 881,568 881,568
,109,787,122
- 17. Gross Electrical Energy Generated (IMB) 288,921 288,921 35,723,886
- 18. Net Electrical Energy Generated (IMB) 274,975 274,975 33,853,048
- 19. Unit Service Factor 78.70t 78.70%
. -75.29%
- 20. Unit Availability Factor 78.70%
78.70%
75.30%
- 21. Unit Capacity Factor (Using POC Net) 78.64%
78.64%
69.53%
- 22. Unit capeity Factor (Using DER Net) 78.64%
. w 78.64%-
69.53%
- 23. Unit Forced Outage Rate 21.30%
21.30%
8.48%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Badt):
April 3,,1982, 60 day outage for modifications, maintenance and refueling
- 25. If Shutdown At End Of Report Period, Esei==* M Date Of Startup: February 17, 1982
- 26. Units In Test Status (Prior to c m mrcial Operation):'
Forecast Adlieved INITIAL CRITICALITY INITIAL E WCTRICITY 00fMERCIAL OPERATI N
- n==ilative total c==ncing January 1,1975.
820324032? 820209 PDR ADOCK 05000244 R
PDR s
~
. AVERAGE DAIM UNIT POWER LEVEL DOCKET NO.
50-244 UNIT #1 Ginna Station DATE January 9, 1982 CJMPIETED BY bi V -
-LMW---,
Andrew E. McNamara b TEIHHONE 1 (315) 524-4446 Ext. 205 or 293 M0tml January, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAIM POWER LEVEL
(
(We-Net)
(We-Net) 1 1.
474 17.
472 2.
473 18.
472 3.
473 19.
472 4,
474 20.
472 5.
474 21.
473 6.
474 22.
471 7.
474 23.
472 8.
474 24.
472 i
9.
474 25.
456 10.
394 26.
11.
472 27.
12.
472 28.
13.
473
- 29. ____
14.
473 30.
15.
473
- 31..
16.
473 INST 10CTICNS On this format, list the average daily unit power level in We-Net for each day in the reporting month. Capute to the nearest Wole megawatt.
DOCKET NO.
50-244 UNIT NEE #1 Ginna Station UNIT SIKTIDOW AIO POWER REDUCTICNS DME January 9, 1982 (Ir1PIEFED BY /1 1- <- f. ')Meh-._~
Andrew E. McNamarR-REPORP IOmi January,1982 TEIEPHCNE 1 (315) 524-4446 Ext. 205 or 293 Method of Duration Reason Shutting Licensee System Component Ca = & Corrective No.
Date Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 Report i Prevent Recurrence i
01 01/25/82 P
158.5*
A 3
82-003 RJ (MEXO1)
Tube leak in the "B" Steam Gen-erator cm M a rapid drop in Reactor Coolant Systein Pressure whidt initiated a Reactor Trip and Safety Injection.
1 2
3 4
?F: Forced Reason:
Method:
Exhibit G - Instructions
'S: Scheduled A-Equfpnent Failure (Explain) 1-Manual for Preparatica of Data B-staintenance or Test 2-Manual Scram.
Entry Sheets for Licensae i
C-Refueling 3-Automatic Scram.
Ernt Report (IER) File D-Regulatory Restriction 4-Other (Explain)
(kitBG-0161)
E-Operator Training & License Examination 8
F-Administrative '
- Unit remained G-Operational Error (Explain) off line at end 5
H-Other (Explain) of report month.
Exhibit 1 - Same Source i
~
NARRATIVE SUPMARY OF OPERATIIG EXPERIIMCE DOCKET NO.
50-244 UNIT Ginna Station, Unit il DATE January 9, 1982 00MP2Tl!D BY M 0- r-k. M W - g _.
Andrew E. McMunark TELEPHONE 1 (315) 524-4446 Ext. 205 or 293 KNIH January, 1982 The reactor power level was maintained at 100% until 1/10 when it was reduod to a 48% to perform a series o". turbine valve and trip tests. The power level was re-stored to 100% after the tests were ocupleted.
)
On 1/20 and 1/22 the reactor power level was reduced to-99% and-971, respec-l tively, to perform periodic tests on the auxiliary feedwater system and mapnnents.
l On 1/25 the unit automatically tripped off line due to a tube leak in the "B" Steam Generator which caused a rapid drop in Reactor Ooolant System pressure M11ch initiated a reactor trip and Safety Injection.
The unit rescained off line at the end of the report month.
- GDea STATICN Maintenance Report January, 19821 l
l During January routine inspections and maintenance were performed including jobs associated with the 1-25-82 transient. Major safety related maintenance included:
1.
Repair of a weld defect on the suction piping to the Reactor Drain Tank ptmp. A pinhole leak was found in a cold lap on the weld. '1he weld was repaired. The line is ammon to Residual Heat Removal syster. recirculation phase suction fran containment.
2.
Replacement of the rupture disc on the Pressurizer Relief Tank.
The disc performed properly during the 1-25-82 actuation of the relief valve.
i l
.