Portland General Electric Cornpany March 4, 1982 Trojan Nuclear Plant CPY-199-82 P.O. Box 439 Rainier, Oregon 97048 (503)556 3713 g
g e
~
ICiy. g g
.ffApg IOO2A _.
Mr. R. II. Engelken, Director Z ' iltm 7,.
7Y PW US Nuclear Regulatory Commission
' 47 iN 260 Creekside Oaks Office Park E
'D 3 1450 Maria Lane js Walnut Creek, California 94596-5368
'b/'
,A
[T;if '
Qu' > [
Dear Sir This is a 30-day special report concerning 3-hour fire barriers pursuant-to Trojan Technical Specifications 3.7.9 and 6.9.2.
The 3-hour fire barrier surrounding the cable spreading room has been rendered inoperable to install conduit associated with t te installation of the cable spreading room deluge system (RDC 80-026, D'P 6).
To comply with Technical Specification 3.7.9a, a continuous fire watch was stationed prior to breaching the fire barrier. The cable spreading room fire barrier is expected to be returned to a functional status by March 31, 1982.
Sincerely, C.
. Ynndt General Manager CPY:ga h
s c:
LER Distribution Ib e
~
D
.TN e
m Co Mk
- n _rw
~i DZ c:r
~
8203240238 820304 PDR ADOCK 05000344 S