OPFRAllNG DA1 A REPORI DOcKLI NO. 50-250 init Jii J E 1982 CO\\let.01ED ny P.L. Pace fI I EPflONE [3.05J 552-3654 ~

OPT R A IING STAT US Turkey Point Unit No. 3 Notes

1. Unit Name:

December, 1981 Unit mo. 3 remained out of

2. Reporting ectiod:

service due to Steam Gener-

3. Licensed t hennal Power isiwii:

2200 ator Repair (Continued from 760

4. Nameplaic Rating g,.ross siwe r previous month)
5. Design Electrical Rating (Net alwe):

.693

6. hlatimum Dependable Capacity (Grow SIWE):

680 646

7. blasimum Dependable Capacity (Net StWe):
b. If Changes Occur in Capxity Ratings litems Number 3 Through 7i Since Last Report.Gise Reasons:
9. Power Lesello which Restrictrd.lf An3 (Net 31Wer None
10. Reauens foi Restrictions,if Any:

~

Ihis Stunth Yr..t o. D.it e Cu m ul. itis e ll. Ilours In Reporting Period 744 8,760 79 545.6

12. Number Of flours Reactor has Critical -

G459 3 55 760'.1

13. Reactor Resene Shutdown llour, 631.0 844.4
14. Ilours Generator On-Line 1,385.6 53 891T0
15. Unit Rewne Shutdown flour, 121.8
16. Gross Therm.sl Energy Generated (N1Wil) 3 025 277 109 197 555 18D 4F 34 693 62[

~

17 Grow tiectrical Energy Generated t.\\1wil,

18. Net Liectrical roerg> Generated istWil,

-1402 912 181 32 821 666

19. Unit Senice I actor 15 A __

67 7-~

20. Unit Asail.ibiht) I actor 15.8 67.9
21. Unit Cagucity I actor (Using \\lDC Net 16.1 63._9 15.0 59.5
22. Unii Capacit.s rauor <Using DI R Nc0

-U-52.4 5.1

23. Uni to,cca Oniace Raie
24. Shntdowns Scheduled Osci Nest 6 51onths t 1 pe. Date.and Duration of I achi 3
25. If Shnt Down At Lnd Of Report Period. litimated D.ne of Si.utup _ Mar _ch_8 m1982
26. Units in Ics St.itus t Prior o Conunercial Operatio 1 I orecan A chies ed

(

INill \\ L CRillCAI.II Y INill \\ L 1.LI C IRICil Y 3

( O\\t\\ll Rt i \\l. OPI R \\110N I203240216 820115

-~ '

PDR ADOCK 05000250 R

PDR

o

~

[

AVER AGE DAILY UNIT POhER LEVEL DOCKET NO.

50-250 Turkev P Unit flo.oint 3

UNIT DATE January 15, 1982

~

COMPLETED BY '

P.L. Pace

--N (305) 552-3654 TELEPfl0NE s

December, 1981 MONDI DAY AVER AGE DA!LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL OfWe Net)

-(MWe-Net) g 17 y

18 st 3

gg 4

20 5

., y 6

.i y

3 3

"E- -

8 y

9 10 26 gy

~~~

35 2S 13

,9 14 IS 16 I

INSTRUCTIONS On this forinat. lic the average daily unit power lesel ist MWe Net for ca:h day in the reporting :n.inth. Compute io the nearest wh+ile xgawatt.

r' s

(

(9/771

- 1 8

~

s 50-251 UNIT $11UTDOWNS AND'POWt.R R[ DUCTIONS DOCKET NO.

uni r N AM E Turkey Point Unit 4 DATE~ Janucry 15, 1932 REPORT \\tONil: December, 2981 CO%fPLETED DY P.L._ Pace ____

TELEPIIONE (JUb) bbd,)bb4 i

~~=

=_

ei 5w 5

j; i

7_Ey L8'cH5cc 5"o g%

Cause & Cturectne I' ' ',

fI 2E 4

.E : x Event a?

El Action to

$3 5

j5j Rer ut :

SC

]'

Present Recurrence 6

13 81-11-19 S

223.4 C

4 RC FUELXX Unit No. 4 completed outage for scheduled refueling, maintenance and inspection. (Continued from previous month) (Nuclear and non-nuclear systems) 14 81-12-20 F

1.7 A

3 EB GENERA' RX trip caused by failure'of 4B invertor.

15 81-12-22 F

17.5 A

?

EB GENERA RX trip caused by loss of "B" spare invertor. Fuse replaced.

I 2

3 4

F: Forced Geason:

Method:

Exhibit G -Instructions S Stheduled A-l.quipnient failure (Explain)

I-Man ual for Preparation of Data ll Maintenance of Test 2-Manual Se:ain.

Entry Sheets for Lcensee C Refueling 3 Autoinatic Scram.

livent Report ILER) File tN1IRI G-D-Regulatory Restriction q-Other ( E splain i 01611 1.-Operator Training & beense INamination F Adnunntratise G-Operational 1: ros t E splain)

,r. /.o a o Mo ve.,.. cl 1:shibit I - Saine Source 07/77) li-Other t lisplain) i a

i 4

i "O

t' e

e

1 OPERAllNG DATA RLPOR T DOCKl:1 NO 50-251 DATE January 15, 1982

~

~

COMPLETED liy P.L. Pace TEI EPilONE b.0 0 32-3654 ~

OPER \\ TING STAT US Turkey Point Unit No. 4 Notes

1. Unit mme:
2. Reporting Period:

December, 1981 Unit 4 returned to service 2200 from scheduled refueling,

3. Licensed Thermal Power (Mht):

760 maintenance and inspection

4. Nameplate Rating (Gross MWel:

(continued from previous 693

5. Deu.gn Electrical Rating (Net MWe):

month).

680

6. Pfasimum Dependable Capacity (Grow MWe):

646

7. Masimum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
9. Power Lesel To which Restricted. If An3 (Net MWel None
10. Reasons for Restrictions. If Any:

1 This,'.Lmt h Yr..to-Date Cumularise

11. Ilours la Reporting Period 744.0 8.760 73 273
12. Number Of flours Reactor ba. Critical 575.0 6.966.2 63 979.0
13. Reactor Resene Shutdown !!our, 166.6
14. Ifours Generator On.Line 501.4 6.805.4 52 OB4.4
15. Unit Resene Shutdown flour, 31 2___

1 I

16. Gross Thermal Energy Generated (MWil) 1 070 874 14 850 268 109 216 623 348 2EG 4 748 894 34 722 067
17. Gross Electri.al Energy Generated (MWil)
18. Net Electrical Energy Generated #MWill 327 649 4 444 758 32 888 778
19. Unit Senice factor 67.4 70.8 71.1
20. Unit Avil.'bility factor 67.4
21. Unit Capacity Factor (Using \\lDC Net

_68.2 70.8 71.1 78.5 69.5 6T5 73.2 64~.T

22. Unit Capacity f actor IUsing DLR Neil 3*/

3.5 3.0

23. Unit forced Outape Rate 2.t. Shutdowns Scheduled Oscr Nest 6 Months (1 pe. Date.and Duration of l'ach t 3
25. If Shnt Down At Lnd Of Report Period.1%:imated D.ste of Startup.
26. Units in Test Status IPrior io Cmumercial Operations:

I orecast Achiesed

,7

(

INI11 \\ L CRIl'lCA LILY INI fl \\ L 1 Li~C f RICil Y

- 1

( Osl\\f! Rrl,\\L OPl'R \\IlON h%h J h

o l

AVEltAGE DAILY UNIT POhER LEVEL

~

DOCKET NO. _50-251 WNO d" UNIT DATE January 15, 1982 P.L. Pace COMPLETED 11Y -

=~ %

(305) 552.365'4 TELEP110NE s

MONTlf December, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

~

.fMWe-Net) 720 s

17 722 2

18 721'

.,e 3

19 664 4

20 Pp+

S 21 723

~

452 6

22 430 1

7 23 e-e--

g 24 717' 715 25 193 712 10 26 618 712 In 27 709 709 12 23 721 13 29 709 717 705 I4 30 716 708 is 33 16 718 INSITIUCTIONS On this forenar. f ar the average daily unit power few! in Mw,. : for ca:h day in the reporting m.inth. Compute to tiie nearest v 1,,,te,3,.g3w.,,,

te j-;

(9/771 m-e

~.

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 J

UNIT N AME Turkey Point No. 3 DATE _ January 15. 1982 December,1981 COMPLETED Hy P.L. Pace REPOR T MON nt TELEPHONE (305) 552-3654 i

~;-

=

  • e 3 a:

?,"1, Cause & Correctise 7.,

.2 c E

5X Licensee

.p.,

3

=

No.

Dat e g

3g

(

,3 i 5 Event

?

4!

Action to 8_ E j5-Report =

tE C

]L Prevent Recurrence 6

05 81-06-24 5

744.0 B

4 HB HTEXCH Unit No. 3 Steam Generator Repair Program in progress. (Contined from previous month)

I t

4 F: Forced Reason:

Method:

Exinbit G Instructions S. Scheduled A. Equipment Failure (Esplain) 1 -Manual for Preparation of Data II. Maintenance of Test 2-Manual Scra m.

Entr> Sheets for Licensee C Reiueling 1-Automatic Scram.

Esent Report (LI:R) File int 1Rl.G-D-Regulatory Restriction SOther i E splam)

Olol) 1 -Operator Training & License Esamination I.Administ ratise

.s G-Operational Error (Esplaml c _ t o ao 44a,v<.,...J Eshibit i. Same Source

('s/77 )

Il-Ot her ( E splain) i a

e i

B a

~'

k

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-251

, UNIT Turkey Point Unit No. 4

"-~~'~

DATE January 15, 1982 COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 REPORT MONTH:

December, 1981 Unit No. 4 started up following scheduled refueling, maintenance and inspection (continued from previous month).

Refer to " Unit Shutdowns and Power Reductions" section of December 1981, Operating Status Report for additional information.

Unit No. 4 operated at approximately 100% power for the renainder of tne month except for outages on 12/20/81 and 12/22/81.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

c 1

I o.

1

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-250 4

. UNIT Turkey Point Unit No. 3 DATE Janua ry 15, 1982

~

'~~~

COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 REPORT MONTH:

December, 1981 Unit No. 3 remained out of service due to Steam Generator Repair program.

Refer to " Unit Shutdowns and Power Reductions" section of December 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

)

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation 2

are continuing. Refer to correspondence between' FPL and NRC for additional information.

Steam Generator Repair program in progress.