Discusses 820209 Telcon W/D Budzik,W Cloutier & W Kuhl Re Borated Water Storage Tanks & Schedule Changes
ML20042A820
Person / Time
Site: Midland
Issue date: 03/11/1982
From: Hood D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8203240147
Download: ML20042A820 (4)


Text

_.

n.

/

c MAR 11682 j

i, D'ocket Hos.: 50-329/330 Oti, OL M8=3 3

y MAnyg1982u "-

1 nun,dsgg J

APPLICANT:

Consuuers Power Company

{

ca,u FACILITY:

Hialand Plant, Units 1 and 2 s

i 4

SUBJECT:

TELEPHONE C0hfERENCE OF FEBRUARY 9, 1982 :

RATED WATER STORAGE TANKS AND SCHEDULE CHANGES On February 9,1982, liessrs. F. Rinaldi and D. Ilood of the. HRC Staff received a call from Hessrs. D. Budzik, W. Cloutier and W. Kuhl of Consumers Power Caiapany.

The principal purpose of the call was to determine the status of open item.C in the testir%ny of Frank Rinaldi, filed February 5,1982 for the Off, OL hearing regarding the Dorated Water Storage Tanks at Midland since these items had been discussed during the Audit Hecting of February 2-5, 1982 (i.e.

since the testinony was prepared). Page 7, Question 9 of that testimony identified four open items:

1.

Evaluation of Composite Ring Beam Calculations have been received and are under review by the Staff.

Review will be completed before start of the February 16, 1982 hearing session.

2.

Committnent to ACI-349-76 Augmented by Regulatory Guide 1.142 This item is resolved by the con 11ttment stated in the' Applicant's testimony.

3.

Satisfactory Evaluation of any Significant Cracks in the New Ring Wall Applicant's te-timony is under review. Preliminary indications; cre that the testimony edequately resolves Staff concerns, i

\\'

i 4.

Provision of an Adequate Leveling Scheme i

The Applicant's testimony satisfies that portion of Kinaldi's testimony which asks for identification of the leveling scheme. l However, as acknowledgeo in Applicant's testimony, studies needed for justification of the adequacy of the leveling scheme will be providea in the near future. This item remains open. The applicant

\\

has very recently received RECO's detailed procedure for leveling.

Other information provided by fir. D. Budzik during this call included the following:

1.

The g...pplicant fc A

els that Sta"f approval o f the Fox-How lett couplers omes>................g y )

g. W'G'Ja'J'*1 n"d5nJUi2YlfBa"seTtTiTtTff' ippF6VbT"6f"6 (dsystT6n"" ' '

d sunnue).................%m +ath. 4he..h ete.4sola4 on-Va4 w. Pit 9.*M-t+:e.1 isite+ exceva14un~~~~~~~~-

8203240147 820311 Q PDR ADOCK 05000329.

>FFICIAL RECORD COPY usam =-as-m A

PDR:

- L.

beneath the the Turbino Building (Phase II of the Auxiliary building Underpinning construction sequence). Phase II is presently scheduled to begin Narch 15, 1962.

The original schedule (February 15,1982) has slipped because of delays in starting installation of the vertical access shaft (Phase I).

The access shaft delay resulted from removal of the dewatering header located in the area of the access shaft.

2.

Installation of the first soldier pile for the vertical access shaft began today (February 9, 1982).

3.

The inpact of the construction delay on Phase III construction (excavation beneath the Auxiliary builuing) is not yet known and it is anticipated that rauch of the Phase I and Phase II delay can be recovered.

4 The dewatering recharge test was initiated February 6,1962, around noon.

Darl 11000, Project flanager Licensing Brinch No. 4 Division of Licensing cc:

See next pcge DISTRIBUTION Docket File LB#4 r/f DEisenhut EAdensam DHood RHernan HThompson RTedesco RVollmer JKramer RMattson RHartfield, MPA 0 ELD OI&E (3) bcc: LOCAL PDR NRC PDR TIC /NSIC TERA ACRS(lfQ omce)

..DL:,( @

kdB#4 SEB,df,/

..DHood,:ef, g,,Edff,n,,am

,,,F,R i, 1i sunscue>

2/.,;4/.gz " h,.Q/p2 3'

p, ocu,

/

Nnc ronu m oo sa sscu cc40 OFFICIAL RECORD COPY usam mi-us*o

~

s MIDLAND Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.

Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq.

Division of Radiological Health Alan S. Farnell, Esq.

Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1 First National Plaza

Chicago, Illinois 60603 William J. Scanlon, Esq.

2034 Pauline Boulevard James E. Brunner, Esq.

Ann Arbor, Michigan 48103 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Ms. Mary Sinclair Midland, Michigan 48640 5711 Summerset Drive Midland, Michigan 48640 Ms. Barbara Stamiris 5795 N. River Stewart H. Freeman Freeland, Michigan 48623 Assistant Attorney General State of Michigan Environmental Mr. Paul A. Perry, Secretary Protection Division Consumers Power Conpany 720 Law Building 212 W. Michigan Avenue Lansing, Michisan 48913 Jackson, Michigan 49201 Mr. Wendell Marshall Mr. Walt Apley Route 10 c/o Mr. Max Clausen Midland, Michigan 48640 Battelle Pacific North West Labs (PNWL)

Battelle Blvd.

Mr. Roger W. Huston SIGMA IV Building Suite 220 Richland, Washington 99352 7910 Woodmont Avenue Bethesda, Maryland 20814 Mr. I. Charak, Manager NRC Assistance Project Mr. R. B. Borsum Argonne National Laboratory Nuclear Power Generation Division 9700 South Cass Avenue Babcock & Wilcox Argonne, Illinois 60439 7910 Woodmont Avenue, Suite 220 Bethesda, Maryland 20814 James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission, Cherry & Flynn Region III Suite 3700 799 Roosevelt Road Three First National Plaza Glen Ellyn, Illinois 60137 Chicago, Ellinois 60602

s Mr. J. W. Cook.

cc: Commander, Naval Surface Weapons Center ATTN:

P. C. Huang White Oak Silver Spring, Maryland 20910 Mr. L. J. Auge, Manager Facility Design Engineering Energy Technology Engineering Center P.O. Box 1449 Canoga Park, California 91304 Mr. Neil Gehring U.S. Corps of Engineers 4

NCEED - T 7 th 'Fl oor 477 Michigan Avenue Detroit, Michigan 48226 Charles Bechhoefer, Esq.

Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. Ralph S. Decker Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. Frederick P. Cowan Apt. B-125 6125 N. Verde Trail Boca Raton, Florida 33433 Jerry Harbour, Esq.

Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.

20555 Geotechnical Engineers, Inc.

ATTN: Dr. Steve J. Poul os 1017 Main Street Winchester, Massachusetts 01890 m

4