asuun SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830, Sacramento, California 95813; (916) 452-3211 N
March 18, 1982 gg 13 W C '.*. m
.33l9 n,92% ~2 5 un:m..ux[ en RICilARD C DE YOUNG DIRECTOR
/
r 3
0FFICE OF INSPECTION AND ENFORCEMENT kK U S NUCLEAR REGULATORY COMMISSION N r -f\\ #
WASIIINGTON D C 20555
- IIU DOCKET 50-312 RANC110 SECO NUCLEAR GENERATING STATION UNIT NO 1 PROMPT NOTIFICATION SYSTEM
REFERENCES:
10 CFR 50 Appendix E Section IV.D.3 District letter of June 30, 1981 District letter of July 24, 1981 Federal Register Vol. 46, No. 182 p46587 NRC Region V letter of October 20, 1981 District letter of December 31, 1981 NRC Region V letter of January 21, 1982 Notice of Violation, February 12, 1982 District letter of February 12, 1982 District letter of March 3, 1982 The following is the current status of our Prompt Notification System:
Materials Alerting Communicators of America (ACA)
As last reported, ACA planned to ship the first 10 control panels on March 5th.
Due to design problems with the siren control circuitry, they were not able to ship on this date.
Subsequent modifications were made to the controls. On March 10th & lith, a modified control panel and encoder were l
brought to our offices by an ACA Field Engineer. He supplied l
us with information on installation and testing of the siren equipment and also demonstrated the operation of the modified
{
control panel. During the demonstration, the decoder in the control panel failed to operate properly. ACA worked March 12th J
through the 14th to solve the problem, and are presently making
/D another modification. This has delayed shipment of the control pancis. ACA received all of the modified siren motors on March 15th, 3hh O
l
.F l
Ah ELECTRIC SYSTEM SERVING MORE THAN 600.000 IN THf H(ARI 0F Calif 0FN4 A
6 RICllARD C DE YOUNG March 18, 1982 and are currently in the process of testing the motors and assembling the siren units. We have received all of the siren mounting brackets and all of the antennas with mounting brackets and cable. ACA's schedule now calls for 20 sirens, complete with control panels, to be shipped on March 19th, with the remaining 15 sirens to be shipped on March 25th.
Interfaces FEMA / State / Counties The meeting mentioned in the District's letter of March 3, 1982 was held.
FEMA, the State, and the Counties were updated on the design and schedule of the project.
The District is prepared to test and install the siren equipment immediately upon arrival. Provided there are no more shipping delays, we are still planning to have an installed system by April 15, 1982. The District will keep you informed as further information develops.
lla
, John '. Mattimoe Acting General Manager cc: