Os MAINE YANKEE fiUCLEAR POWER STATION HONTHLY STATISTICAL REPORT 82-1 FOR THE !!0 NTH OF JANUARY,1982 l
l 1
MOhhh$[9 PDR
OPERATING DATA REPORT DOCKET NO. 50-309 DATE R?n?ti COMPLETED BY A F.
nnyin TELEPHONE 617-R7?-8100-X2390 OPERATING STATUS Maine Yankee Notes
- 1. Unit Name:
- 2. Reporting Period:
3nm'avv-14R?
- 3. Licensed Thermal Power (MWt):
2630 Power level restricted by steam flow through #1 low 864
- 4. Namepiste Rating (Gross 51We):
Pressure turbine.
825
- 5. Design Electrical Rating (Net SIWE):
850
- 6. Maximum Dependable Capseity (Gross MWe):
810
- 7. Maximum Dependable Capacity (Net MWe).
- 8. If Changes Occur in Capseity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
- 9. Power Lese! To Which Restricted.lf Any (Net MWe):
835 MWe (=97%)
See notes
- 10. Ressons For Restrictions.lf Any:
This Month Yr..to.Date Cumuistive 744.00 744.00
- 11. Hours in Reporting Period 744.00 744.00 65.652.64
- 12. Number Of Hours Reactor Was Critical
- 13. Resetor Resene Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On Line 744 nn 7AA nn 63.454.63 0.00 0.00 0.00
- 15. Unit Resene Shutdown Hours 1,888,681.00 1,888,681.00 137,981,911.00
- 16. GrossThermal Energy Generated (MWil)
- 17. Gross Electrical Ener;y Generated (MWH) 611;R9n nn 611.R?O OO 45.?R1 570.00
- 18. Net Electrical Energy Genersted (MWil) 585.449.00 585.449.00 43.028.715.00 100.00 100.00 78.43
- 19. Unit Service Factor
- 20. Unit Availability Factor 100.00 100.00 78.43 97.15 97.15 68.30
' 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) o5 3a 95,38._
66.21
- 23. Unit Forced Outage Rate 0.00 0.00 6.4?
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.snd Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION
'(9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-309 UNIT Maine Yankee DATE 820211 A.E. Dope
~
COMPLETED BY TELEPHONE 617-872-8100-X239C JANUARY, 1982 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 795 794 37 g
790 2
18 792 788 3
793 19 793 20 4
792 794 5
21 707 790 6
22 793 7
23 797 781 8
793 24 79I 25 791 9
709 790 10 26 790 33 789 27 797 737 12 28 791 749 13 29 793 791 I4 30 790 792 g3 3g 753 16 i
INSTRUCTIONS l
On th.s format. list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
i 191771 l
l I
UNITSilUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.
50-309 UNIT NAME Maine Yankee DATE 8?o211 REPORT MONTil.TANUARY. 1982 COMPLETED HY
_A.E.
Doyle TELEPilONE 617-872-8100.42390 "i
.$ ?
3
.A.5 k Licensee
,E%
Cause & Correceive No.
Date g
3g
,g g 5 Even:
3?
$3 Action les F
c5 E 5
j;5g Report a
$G yu Psevent Recurrence t5 01/16/82 S
9.8 B
1 NA IIA VALVEX-C Load reduction for turbine valve testing.
01/28/82 F
15.8 B
1 NA IIF IITEXCll-D Load reduction to investigate Cl~
inleakage in condenser bay "A".
01/29/82 F
11.6 A
1 NA IC INSTRU-C Load reduction to replace CEA #55 timer module subsequent to CEA #55 dropping.
1 1
2 3
F: Fins ed Reason:
4 Method:
Exhibit G-Instruesiinis S: Scheduled A Etinipment Failure (Explain) 1-Manual for Picparation of Data R. Maintenance of Test 7-Manual Scram.
Entsy Sheets for Licensee C Rcfueling 3 Automatic Scrain.
Eveni Report (LER) Fde INUREG-D Regulaiosy Restriction 4-Other (Emplain) 0161)
E-Ope ator Tsaining & License Examination F Aihninisisasive 5
G Opesasi..nal I.isne (limplain) 08/i7)
Il Othen Ilimplain)
Enlubit I Same Sinuce
DOCKET NO.
50-309 UNIT Maine Yankee DATE 820211 COMPLETED BY A.E. Doyle TELEPHONE 617-872-8100-X2390 REPORT MONTH JANUARY. 1982 SU't!ARY OF OPERATING EXPERIENCES The plant was at full power at the beginning of the month.
On January 16th a load reduction to 79% was completed for turbine valve testing. The plant returned to full power on the same day.
On_ January 28th, a load reduction to 80% was completed to investigate C1 inleakage in condenser bay "A".
The plant returned to full power on January 29th.
On January 29th, a load reduction to 82% was completed to replace the CEA #55 timer module. The plant returned to full power on the same day.
The plant was at full power at the end of the month.
!