Forwards Seismic Reassessment of Major Mechanical Equipment, Per 820112 Request
ML20042A477
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/18/1982
From: Tauber H
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
Shared Package
ML20042A478 List:
References
EF2-56-817, NUDOCS 8203230473
Download: ML20042A477 (2)


Text

-

H rry Truber N?; Nefa 10 cc<>wuesm DeirOlt Edison inGs5=~

March 18 1982 EF2-56,817

~m..

o Q

Mr. L. L. Kintner Sig 9.

US Nuclear Regulatory Commission b

M4g C,

g8/Sgg q.

Office of Nuclear Reactor Regulation Division of Licensing 9

Washington DC 20555 C>

E

Dear Mr. Kintner:

g

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Seismic Reassessment of Major Mechanical Equipment In response to a question from the Equipment Qualification Branch during a telephone conversation on January 12, 1982, we confirm that major mechanical equipment essential to the safe shutdown (identified in Supplementary Seismic Evaluation Report EF2-53,332, dated July 15,1981) was reassessed for the effects of site specific earthquake.

The seismic reassessment program considered structural integrity as well as operability requirements. provides a list of major mechanical equipment with corresponding equipment damping values used in reassessment.

Attacnment 2 contains the floor response spectra (for several equipment damping values including 2% equipment damping) for your reference.

Sincerely,

./

,fn f l$1 Attachments CC B. Little QO

\\ SSl 8203230473 820318 PDR ADOCK 05000 A

to:

EF2 - 56,817 SEISMIC REASSESSMENT

% Equipment Damping Used Major Mechanical Equipment.

(Assumed)

Hydraulic Control Unit 2

RHR Mechanical Draft Cooling Towers 0.8 #

RHR Service Water Pump &-Motor 2

E.D.G. Skid Assembly 1

EECW Pump & Motor 2

E.D.G Service Water Pump & Motor 2

EESW Pump & Motor 2

Control Air Compressor & Motor 2

HVAC Dampers 2

Return Air Fan 2

Centrifugal Chilling Units 2

Emergency Makeup Motors 2

Emergency Makeup Fans 2

Emergency Makeup Filters 2

Multizone Climate Changer 2

Chilled Water & Pump Motor 2

Switchgear Room, EECW Room,'and Control Air-Compressor Coolers 2

RHR Room Cooler 2

Equipment Room Fan Coil Unit 2

RCIC Pump Room Cooler 2

Cable Tray Cooling Fans 5 **

Drywell Cooling Fans & Coolers 2

RHR Complex Fans 5 ***

RHR Pump 2

RHR Motor 2

RCIC Pump 2

RCIC Turbine 2

For Eliminators:

being the governing item for seismic loads Tested Item:

TRS ) RRS Damping Measured was 9%, ) 5% used in reassessment i

- - + = -,,,

n e--.----,-.

,y-

-y,----w, y

to:

EF2 - 56,817 SITE SPECIFIC EARTHQUAKE Floor Response Spectra

(

Reference:

Floor Response Spectra and Envelopes -

EF2-55,462:

November 9, 1981)

REACTOR AUXILIARY BUILDING - P.

96 to 152 RHR COMPLEX:

- P. 165 to 179

-