H rry Truber N?; Nefa 10 cc<>wuesm DeirOlt Edison inGs5=~
March 18 1982 EF2-56,817
~m..
o Q
Mr. L. L. Kintner Sig 9.
US Nuclear Regulatory Commission b
M4g C,
g8/Sgg q.
Office of Nuclear Reactor Regulation Division of Licensing 9
Washington DC 20555 C>
E
Dear Mr. Kintner:
g
Reference:
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341
Subject:
Seismic Reassessment of Major Mechanical Equipment In response to a question from the Equipment Qualification Branch during a telephone conversation on January 12, 1982, we confirm that major mechanical equipment essential to the safe shutdown (identified in Supplementary Seismic Evaluation Report EF2-53,332, dated July 15,1981) was reassessed for the effects of site specific earthquake.
The seismic reassessment program considered structural integrity as well as operability requirements. provides a list of major mechanical equipment with corresponding equipment damping values used in reassessment.
Attacnment 2 contains the floor response spectra (for several equipment damping values including 2% equipment damping) for your reference.
Sincerely,
./
,fn f l$1 Attachments CC B. Little QO
\\ SSl 8203230473 820318 PDR ADOCK 05000 A
to:
EF2 - 56,817 SEISMIC REASSESSMENT
% Equipment Damping Used Major Mechanical Equipment.
(Assumed)
Hydraulic Control Unit 2
RHR Mechanical Draft Cooling Towers 0.8 #
RHR Service Water Pump &-Motor 2
E.D.G. Skid Assembly 1
EECW Pump & Motor 2
E.D.G Service Water Pump & Motor 2
EESW Pump & Motor 2
Control Air Compressor & Motor 2
Return Air Fan 2
Centrifugal Chilling Units 2
Emergency Makeup Motors 2
Emergency Makeup Fans 2
Emergency Makeup Filters 2
Multizone Climate Changer 2
Chilled Water & Pump Motor 2
Switchgear Room, EECW Room,'and Control Air-Compressor Coolers 2
RHR Room Cooler 2
Equipment Room Fan Coil Unit 2
RCIC Pump Room Cooler 2
Cable Tray Cooling Fans 5 **
Drywell Cooling Fans & Coolers 2
RHR Complex Fans 5 ***
RHR Pump 2
RHR Motor 2
RCIC Pump 2
RCIC Turbine 2
For Eliminators:
being the governing item for seismic loads Tested Item:
TRS ) RRS Damping Measured was 9%, ) 5% used in reassessment i
- - + = -,,,
n e--.----,-.
,y-
-y,----w, y
to:
EF2 - 56,817 SITE SPECIFIC EARTHQUAKE Floor Response Spectra
(
Reference:
Floor Response Spectra and Envelopes -
EF2-55,462:
November 9, 1981)
REACTOR AUXILIARY BUILDING - P.
96 to 152 RHR COMPLEX:
- P. 165 to 179
-