ML20042A449
| ML20042A449 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/15/1982 |
| From: | Deacon W BOSTON EDISON CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20042A450 | List: |
| References | |
| 82-79, NUDOCS 8203230430 | |
| Download: ML20042A449 (1) | |
Text
'
di D
EOSTON EDISON COMPANY h
eno Benetem 5,ess, gg, Soevo,s. MaseAce*uerf ts 02199 L}
InAR2 2198ga 71 j$w"["
March 15, 1982 g
BECo. Ltr. #82-79 g
g Mr. Ronald C. Haynes Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA.
19406 License No. DPR-35 Docket No. 50-293 Radioactive Effluent Release Report July 1 through December 31, 1981 l
Dear Sir:
i In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.C.1, Boston Edison Company hereby submits 2 copies of the Pilgrim Nuclear Power Station Radioactive Effluent Release Report.
The reporting period is from July 1,1981 through Decenter 31, 1981.
4 The report format and content are in accordance with NRC Regulatory Guide 1.21:
l f1EASURING, EVALUATING, AND REPORTING RADI0 ACTIVITY IN SOLID WASTES AND RELEASES 0F RADI0 ACTIVE MATERIALS IN LIQUID AND GASE0US EFFLUENTS FR0:1 LIGHT-WATER COOLED NUCLEAR POWER PLANTS, Revision 1, Tables 1A,18,1C, 2A, 28, 3, 4A..
4A-2 and Supplemental Information.
Please note that the date of this submittal was the subject of an extension request which was granted by ilRC.
h Very truly yours,
{
As
<b William H. Deacon Acting flanager Nuclear Operations Support (2 copies) cc: Mr. Domenic B. "assallo, Chief Commonwealth of fiassachusetts Operating Reactors Branch #3 Director, Executive Office of flanpower Division of Operating Reactors Affai rs Office of Nuclear Reactor Regulation Dept. of Labor and Industries U.S. Nuclear Regulatory Comission Division of Occupational Hygiene Washington, D. C.
20555 (6 copies) 39 Boylston Street (9th floor)
Boston, MA.
02116 (1 copy) hoo O