ML20042A422

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1981
ML20042A422
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 08/01/1981
From: Chapman M
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20042A416 List:
References
NUDOCS 8203230406
Download: ML20042A422 (2)


Text

  • an**

OPERATING DATA HLPO!tT DOCKET NO. 50-260 DATE 8-1-81

- . CO.\lPLETED !!Y _llike Chapman TELEPilONE 205-729-6846

.~

OPl.R ATING ST \TUS Ilrowns Ferry - 2 N"l"

1. Unit Name:
2. Reporting Period: July 1981
3. Licensed T hermal Pow er (51Wti: 3293
4. Nameplate Itating (Gross SIWE): 1152
5. Design Electrical Rating (Net SIWE): 1065
6. Statimum Dependable Capacity (Gross SIWE): 1098.4 7 Stasimum Depen.lable Capacity (Net $1We): 1065
h. If Changes Occur in Capacity ltarinp (Items Number 3 Through 71 Since I.ast Report.Give lleasons:

NA _

9. Power Lesel To hhich Restricted,if Any (Net alwe): . NA
10. Reasons For Itestrictions, if Any: NA _

This alont b Yr..to Date Cumularise ll. liours In Reporting Period 744 5,087 56,280

12. Number Of Ilours Re.ictor Was Critical 702.92 _ 4,460.53 35,204.14
13. Reactor itesene Shutdoun llours 41.08 598.10 13,051.58
14. Ilours Generator on Line 634.72 4294.51 34,035.47
15. Unit Resene Shutdown linurs 0 0 J0 g,
16. Grow Thermal Energy Gencrated (SIWil) _ 1,966,354 L ,10,,416 9W 760%

17 Gross Electrical Energy Generated (N!Wil) ~54,140 4,402,870 32,140,058 -

' 506 4,273,003 ~ 31,223,310 IS. Net Electrical Energy Genciated t.\lWil)

19. Unit Senice Factor __.,

'.3 84.4 60.5 '

20. Unit Asailability Factor -) . 3 84.4 60.5
21. Unit Capacity Factor (Using .\lDC Net) /9.7 78.9 52,1
22. Unit Capacity rattor (Using 1) fit Net) 79 7 78 9 52.1
23. Unit forced Ontage Itate 14.7 6.3 30.3
24. Shutdouin Scheduled Oser Next 6 Slonths (Type.1) ate.and Duration of 1.ach):
25. If Shut Down At End Of Iteport Period. Luimated Date of Startup. 8-18-81 2 ti . Units in lest Status (Prior to Conuncreial Operatinnl: Forecast A chies ed

(

INil I.\ l. CR !l lCA LITY _ [

INI TI Al. F1.!:C 1 RIC11 Y CO\l\ll'RCI AL OPl R ATION 8203R30406 810910 PDR eJOCK 05000260 PDR p:/77; R

y , ;. . . . . _ . - . _ -

gi - ;fj

.'.' T1

/

i OPERATING DATA REPORT DOCKET NO. 50-260 DATE 9-1-81 COSIPLETED BY T. Thog_,

TELEPilONE 70 5-7 29-684 6 + - -

OPERATING S1 AlUS N"

- 1. Unit Name: Browns Ferry -2

2. Reporting Period: August 1981
3. Licensed Thennal Power (Sth al:

3293 1152

4. Nameplate Rating (Gross SIWel:
5. Design Electrical Rating (Net .\lWel:
6. Stasimum Dependable Capacity (Gross 51We): ~1098.4
7. \lasimum Dependable Capacity (Net 51We): 1069 N. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gi c Reasone NA
9. Power Lesello which Restricted lf Any (Net 31Wel: NA Itl Reasons For Restrictions,if Any: NA __

.1 This 31onIh Yr. Io.Daie Cumulaeise il llours in Reporting Period 744 5831 57,024 402.15 4,862.68 35,606.29

12. N. umber Of llemrs Reactor has Critical
13. Reactor Resene Shutdown llours 341.85 939.95 13,393.43

.5Z6.17 4,620.68 34,361.64

14. Ilours Generator On-Line 0 0 0 15 Umt Resene Shutdown flours 16 Grow Thermal Energv Generated (5thill 929,335 14,118,753 -vs7wap7@]? 68f,39f' 17 Grow Electrical Energy Generated t.\lWill 299,250 . 4,702,120 32,439.308 11 Net I:lectrical Energy Generated 45th H)

~

285,490 4.558.493 31.508.800 19 Unit Senice Factor 43.8 79.2 60.3 20 Unit Asailability Factor 43.8 79.2 60.3 21 Unit Capacity Factor (U>ing .\tDC Net t 36.0 73.4 51.9 2 .' t: nit Capacii> Factor iU>ing DER Net) 36.0 73.4 51.9 21 Unit Forced Outage Rate 56.2 13.3 30.7 24 Shutdowns Scheduled (her Nest 6 \lonths flype. Date,and Duration of Eacht 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

2e- l' nits in lest Status t Prior io Commercal Operation). l'orecast Aclocsed e

INill A L CRillC Al.IlY INill-\ L Ell.CIRICITY - 3 CO\t\1ERCI \L OPER \ TION

1) e g