- an**
OPERATING DATA HLPO!tT DOCKET NO.
50-260 DATE 8-1-81 CO.\\lPLETED !!Y _llike Chapman TELEPilONE 205-729-6846
.~
OPl.R ATING ST \\TUS N"l"
- 1. Unit Name:
Ilrowns Ferry - 2 July 1981
- 2. Reporting Period:
- 3. Licensed T hermal Pow er (51Wti:
3293 1152
- 4. Nameplate Itating (Gross SIWE):
1065
- 5. Design Electrical Rating (Net SIWE):
1098.4
- 6. Statimum Dependable Capacity (Gross SIWE):
1065 7 Stasimum Depen.lable Capacity (Net $1We):
- h. If Changes Occur in Capacity ltarinp (Items Number 3 Through 71 Since I.ast Report.Give lleasons:
NA NA
- 9. Power Lesel To hhich Restricted,if Any (Net alwe):
NA
- 10. Reasons For Itestrictions, if Any:
This alont b Yr..to Date Cumularise 744 5,087 56,280 ll. liours In Reporting Period
- 12. Number Of Ilours Re.ictor Was Critical 702.92
_ 4,460.53 35,204.14 41.08 598.10 13,051.58
- 13. Reactor itesene Shutdoun llours
- 14. Ilours Generator on Line 634.72 4294.51 34,035.47 0
0 J0 g,
- 15. Unit Resene Shutdown linurs
- 16. Grow Thermal Energy Gencrated (SIWil)
_ 1,966,354 L,10,,416 9W 760%
17 Gross Electrical Energy Generated (N!Wil)
~54,140 4,402,870 32,140,058 IS. Net Electrical Energy Genciated t.\\lWil)
~ 31,223,310
' 506 4,273,003
'.3 84.4 60.5
- 19. Unit Senice Factor
-). 3 84.4 60.5
- 20. Unit Asailability Factor
/9.7 78.9 52,1
- 21. Unit Capacity Factor (Using.\\lDC Net) 79 7 78 9 52.1
- 22. Unit Capacity rattor (Using 1) fit Net) 14.7 6.3 30.3
- 23. Unit forced Ontage Itate
- 24. Shutdouin Scheduled Oser Next 6 Slonths (Type.1) ate.and Duration of 1.ach):
- 25. If Shut Down At End Of Iteport Period. Luimated Date of Startup.
8-18-81 2 ti. Units in lest Status (Prior to Conuncreial Operatinnl:
Forecast A chies ed
(
INil I.\\ l. CR !l lCA LITY
[
INI TI Al. F1.!:C 1 RIC11 Y CO\\l\\ll'RCI AL OPl R ATION 8203R30406 810910 PDR eJOCK 05000260 PDR p:/77; R
y, ;.
gi -
- fj T1
/
i OPERATING DATA REPORT DOCKET NO. 50-260 DATE 9-1-81 COSIPLETED BY T. Thog_,
TELEPilONE 70 5-7 29-684 6 + - -
OPERATING S1 AlUS N"
- 1. Unit Name:
Browns Ferry -2
- 2. Reporting Period:
August 1981 3293
- 3. Licensed Thennal Power (Sth al:
1152
- 4. Nameplate Rating (Gross SIWel:
- 5. Design Electrical Rating (Net.\\lWel:
~1098.4
- 6. Stasimum Dependable Capacity (Gross 51We):
1069
- 7. \\lasimum Dependable Capacity (Net 51We):
N. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gi c Reasone NA
- 9. Power Lesello which Restricted lf Any (Net 31Wel:
NA NA Itl Reasons For Restrictions,if Any:
.1 This 31onIh Yr. Io.Daie Cumulaeise 744 5831 57,024 il llours in Reporting Period 402.15 4,862.68 35,606.29
- 12. N. umber Of llemrs Reactor has Critical 341.85 939.95 13,393.43
- 13. Reactor Resene Shutdown llours
.5Z6.17
- 14. Ilours Generator On-Line 4,620.68 34,361.64 0
0 0
15 Umt Resene Shutdown flours 929,335 14,118,753
-vs7wap7@]? 68f,39f' 16 Grow Thermal Energv Generated (5thill 17 Grow Electrical Energy Generated t.\\lWill 299,250.
4,702,120 32,439.308 11 Net I:lectrical Energy Generated 45th H) 285,490 4.558.493 31.508.800
~
43.8 79.2 60.3 19 Unit Senice Factor 43.8 79.2 60.3 20 Unit Asailability Factor 36.0 73.4 51.9 21 Unit Capacity Factor (U>ing.\\tDC Net t 36.0 73.4 51.9 2.' t: nit Capacii> Factor iU>ing DER Net) 56.2 13.3 30.7 21 Unit Forced Outage Rate 24 Shutdowns Scheduled (her Nest 6 \\lonths flype. Date,and Duration of Eacht 25 If Shut Down At End Of Report Period. Estimated Date of Startup:
2e-l' nits in lest Status t Prior io Commercal Operation).
l'orecast Aclocsed e
INill A L CRillC Al.IlY INill-\\ L Ell.CIRICITY
- 3 CO\\t\\1ERCI \\L OPER \\ TION
- 1) e g