Memorandum & Order Correcting Transcript
ML20042A204
Person / Time
Site: Susquehanna  
Issue date: 03/18/1982
From: Gleason J
Atomic Safety and Licensing Board Panel
To:
References
NUDOCS 8203230199
Download: ML20042A204 (10)


Text

-

UNITED STATES OF AMERICA DM ME ir' NUCLEAR REGULATORY COMMISSION W'

ATOMIC SAFETY AND LICENSING BOARD

.gg g p.,."

(U O

'b In the Matter of

)

)

"3

~

[g y.'+ ;A PENNSYLVANIA POWER AND LIGHT C0.

)

Docket Nos. 50-387 I

4 g

ALLEGHENY ELECTRIC COOPERATIVE, INC. )

50-388 5

~

)

v. g s

(Susquehanna Steam Electric Station, )

8

-Units 1 and 2)

)

0' SEftvto ag19 MEMORANDUM AND ORDER (TRANSCRIPT CORRECTIONS)

The transcript of the evidentiary hearing in this proceeding will be corrected to exclude the following material errors:

Transcript page Line Change 1053 8

"1500 KV" to "15 KV" 1054 14 "a"

to "the" 1071 6-7 "the hour" to "our" 1078 12

" flows" to " flaws" 1085 3

"a change" to "a weight change" l

1086 1

i

'r ge" to "de Lorge" l

23 "fL

' to "are placed" 1087 1

"trimeed" to "trimed" 16 "Griffett" to Grissett" 1095 18 "Franke" to " frank"

?

1120 21

" perception" to " perspective" 1122 22 "Finkerwald" to "Singewald" 1139 4

"quickly" to " carefully" D

1140 13

" relationships of concern incidence to a higher" to " relationships to a higher"

/[

l ho

[

O T

. J Transcript page Line Change 1142 6

"supersive" to "adversive" 1149 11

" bring chemistry" to " brain chenistry" 1169 18 "that it is always" to "that stress is always" 1211 25 "or" to "of" 1226 7

"electrnstatic" to " electric" 16

" field" to " field from the lines."

1230 3

" shorted" to " shorten" 1231 7

"is" to "are" 11,15 "Durfey" to "Durfee" 1232 25 "paecera paecepallum" to " Physarum polyrephalum" 1234 11 "that made" to "that it made" 12 "over" to "or" 1236 6

" impala lorinzini" to "Ampula of Lorenzini" 1253 11 "10 CFR 2.744" to "10 CFR 2.743" 1265 9

"Halamar" to "Hallam" 17 "Almost" to "Almost lost" 1276 20 "that" to "what" 1277 10 "use" to " reuse" 20

" areas" to " pieces" 1292 12 "close" to " gross" I

1304 2

"a bonus" to " BONUS" l

21 "de-use" to " reuse" 1305 23 "let's say," to "let's say, be"

{

1315 19 "if" to "of" l

1318 14

"'69 '70" to "from the '69 '70" l

1319 14 "1980. The" to "1980 using the" l

1324 18

" people associated" to " people on the associated" i

s.

. Transcript page Line Change 1347 23 "decon" to DECON" 1349 3

"four" to "for" 1357 1

"Just" to "Q Just" 4

"PN" to ""NL" 6

"decomination" to " contamination" 10 "Q So" to "So" 1358 17 "P&L study, si" to "PNL study, is" 1384 15

" Lair" to Lehr" 1391 15 "50" to "60" 1415 11 "2.71" to "271" 1521 6

"Ricault Persad" to "Raghaw Prasad" 1524 22

" accidents" to " qualifications" 1556 24

" expensive" to " extensive" 1565 11

" locates" to " allocates" 1565 10 "TJM" to "PJM" 1581 12 "to transmit" to "to transport" 1585 18 "in Culvert," to "in Covert,"

1597 14

" refers to" to " states that" i

1608 24

" contaminated" to " decontaminated" 1629 23

" cooling down of the" to " cooling towers, thu" 24 "the vents." to "the fences,"

j 1638 2

"true.

As to PP&L," to "true as to PP&L."

1642 1

"No, not as to -- the PP&L has been in contact with" to "No, not as to the other utilities but t

PP&L has been in contact with" 1643 3

"if we" to "and we" l

l 1657 11

" agreement of states" to " agreement states" l

1657 12

" existence" to " instance"

. Transcript page Line Change 1669 14 "for" to "from" 1687 22

" valve" to " volume" 1688 2

" insert withdrawal" to " insert or withdrawal" 1691 13

" vent drain" to " vent and drain" 1693 16

" vent drain" to " vent and drain" 1703 14

" disks" to " doses" 21

" correct" to " coolant" 1704 13

" respectable" to "inspectable" 18-19

" ground theory" to " Browns Ferry" 1705 5

" ground theory" to " Browns Ferry" 1708 4

" growth... growth" to " gross... gross" 1709 1

"high control" to " hydraulic control" 1711 4

"be" to "the" 5

" cooled" to " pool" 8

" core" to " pool" 1731-18

" cite" to " site" 1738 14 "No; just it gives" to "No, it gives" 1739 9

" sort" to " source" 1744 13&l4

" worked" to " works" 23 "with" to "with respect to" 1750 10 "or whatever the" to "or whatever, the" 1752 10 "on emergency." to "on emergency planning."

1756 16

" indications" to " concerns" 1757 18 "on that that the" to "on that. The" 21 "as procedure-a sympton-based procedures and" to "as system-based procedures and, as" 22 "the result" to "a result"

\\

. Transcript page Line Change 1759 14

" systems which" to systems in which" 16 "not met but alternative" to "not met. Alternative" 19

" involved are made and" to " involved, are made, and" i

20 delete " charged to" 21

" requirements" to " requirements,"

1761 6

" anteceded" to " initiated" 8

" elements is the operators" to " element is the operators'"

21

" parameters" to " parameter" 1763 2

" pressure" to " direction" 5

" scram," to " scram" 1764 2

" indications" to " conditions" 1768 5

"or" to "of" 25 "d' rained, if you" to " drained.

If you" 1769 14

" spent" to " vent" 15

" drained" to " drain" 1776 17

" guide" to "by" 1777 7

"FDB" to "SDV" 1783 16 "was to referring" to "was not referring" i

1793 4

"and" to "in" 1806 1

"despite" to " design" 1815 10

" STB" to "SDV" t

l 1861 10 "I do know" to "I do not know" 16

" chemical" to " technical" 1867 8

" outage" to " residence" 1881 24 "biostudier" to " biosphere"

  • Transcript page Line Change 1884 3

"for" to "or" 1885 2

"by disposal in" to "from disposal by" 1887 15 "19" to "10" 1889 15 "0kla" to "0klo" 1904 3

"F-3" to "S-3" Applicant's Testimony of Grayson E. McNair following Tr.1957:

24 Punch-add "the 1980" hole 28 Punch-add "2.4" hole 1960 7

"some temporary" to " sun tempering" 1962 20

" type" to " tight" 1965 4

"Tunchanic" to "Tunkhannock" 19 "4B" to "4D" "y'ur" to "you" 1971 4

o 2001 2

"is" to "it's" 2006

" installation" to " insulation"

~

2013 19

" sealing" to " ceiling" 2018 3

" load" to " low" 2020 18

" spheres" to " years"

'2021 25

" mix-up" to " fuel mix" 2022 25

" monetary" to "Montour" l

2028 17

" outage" to " usage" i

f 2041 12,14,20,21

" Hamilton" to "Hammel" 2054 21

" upper" to " proper" 2059 3

" connection" to " interconnection" 2060 9,16 "TJM" to "PJM"

. Transcript page Line Change 2061 12

" arrangement. One" to " arrangement, one" 2063 21 "for" to "or" 23,24

" Mils" to " Mills" 2065 3

" kilowatt" to " kilowatt hour" 23 "or" to "for" 2069 6

"of" to "and" 2079 6,10 "KB" to "KV" 2080 14

" depicted" to " detected" 2082 10

" Liability" to " Reliability" 2085 9

"Limrick" to " Limerick" 2089 6

"P&L" to "PP&L" 14 "Limrick" to " Limerick" 2096 23 "PT&L" to "PP&L" 2103 24 "7S percent" to "25 percent" 2109 8

"were to" to "were not to" 2111 13

" front" to " sunk" 2113 6

"other" to "of the" 2117 8

"would not shut" to "would shut" 9

"and operate" to "and not operate" 2119 2

" state, public utility, Commission" to

" state public utility commission" 2125 13

" ineffective of" to "it affects" 2129 8

" eleven gigawatt" to " eleven thousand gigawatt" 2215 21 "TJM's" to "PJM's" 9

2244 9

" plants" to " plans" 2246 4

" clarify" to " clarification" 2253 5

" geographic" to " geometric" 2259 '

17 "like" to "at"

. Transcript page Line Change 2263 7

" roadways and" to " roadways at" 2265 7

"?"

to "."

2267 3

Delete "per" 9

"three-day case" to " peak day case" 16 "overtest" to " overtax" 2269 19

" pregnant" to " permanent" 2272 16 Delete "at the end of the second" 2274 21

" snowfalls" to " snow plows" 2275 7

" condition" to " good condition" 14

" applies" to " implies" 2277 23 "The why" to "The reason why" 2282 4

"with the EPZs" to "within the EPZ" 19 Delete " core" 2283 21 "potention" to " potential" 25 "are" to " area" 2285 21 "90" to "19" 2286 2

"better" to "better way" 2287 6

"in" to "and" 2289 22

" drive" to " driver" 2291 12

" " to "?"

2295 11

" appropriated" to " appropriate" and "from 30" to "from the 30" 2297 13

" involvement" to " enrollment" 14 "transcience" to " transients" 2303 17

" productions" to " reductions" 2325 12 "new" to " news" l

2338 8

"R.N.K." to "0ran K."

r e

-9_

Transcript page Line Change 2340 11

" Commander" to " Command and" 19

" office" to " officer" 2351 17 "31 to 37" to "21 to 27" 2373 25

" rep" to "RERP" 2374 8

" resigned" to " assigned" 2405 7

" stations" to " patients" 2440 1

" accounting" to " counting" 2453 10

" disability" to " visibility" 2455 14

" taps' to " track" 2457 22 "AMES" to "AMS" 2462 2

"first" to " source" 2487 8

" metal" to " natural" 2489 20 "those" to " dose" 2495 18

" plant" to " top" 2504 11

" synaptic" to " synoptic" 2565 5

" followup" to " fallout" 2607 14 "DCB730" to "CD V-730" l

l 2609 3

"HIPPERT" to "BELSER" l

16

" drama" to " drummer" l

2626 14

" Nuclear Regulation" to"NUREG" 2641 7

" relevant" to " irrelevant" 2642 15

" evaluation" to " evacuation" 2679 18

" forces" to " sources" l

2710 7

"Tencanik or Strasburg" to "Tunkhannock or Stroudsburg" l

2719 9

"Macanagua" to "Mocanaqua" l

l

--=

o 4.

ORDERED l

1 ATOMIC SAFETY AND LICENSING BOARD I

.e'

[

_(/.

James P. Gleason, Chairman ADMINISTRATIVE JUDGE i

l i

l 1

J 4

4 Bethesda, Maryland

' March 18, 1982 1

j i

-