UNITED STATES OF AMERICA DM ME ir' NUCLEAR REGULATORY COMMISSION W'
ATOMIC SAFETY AND LICENSING BOARD
.gg g p.,."
(U O
'b In the Matter of
)
)
"3
~
[g y.'+ ;A PENNSYLVANIA POWER AND LIGHT C0.
)
Docket Nos. 50-387 I
4 g
ALLEGHENY ELECTRIC COOPERATIVE, INC. )
50-388 5
~
)
- v. g s
(Susquehanna Steam Electric Station, )
8
-Units 1 and 2)
)
0' SEftvto ag19 MEMORANDUM AND ORDER (TRANSCRIPT CORRECTIONS)
The transcript of the evidentiary hearing in this proceeding will be corrected to exclude the following material errors:
Transcript page Line Change 1053 8
"1500 KV" to "15 KV" 1054 14 "a"
to "the" 1071 6-7 "the hour" to "our" 1078 12
" flows" to " flaws" 1085 3
"a change" to "a weight change" l
1086 1
i
'r ge" to "de Lorge" l
23 "fL
' to "are placed" 1087 1
"trimeed" to "trimed" 16 "Griffett" to Grissett" 1095 18 "Franke" to " frank"
?
1120 21
" perception" to " perspective" 1122 22 "Finkerwald" to "Singewald" 1139 4
"quickly" to " carefully" D
1140 13
" relationships of concern incidence to a higher" to " relationships to a higher"
/[
l ho
[
O T
. J Transcript page Line Change 1142 6
"supersive" to "adversive" 1149 11
" bring chemistry" to " brain chenistry" 1169 18 "that it is always" to "that stress is always" 1211 25 "or" to "of" 1226 7
"electrnstatic" to " electric" 16
" field" to " field from the lines."
1230 3
" shorted" to " shorten" 1231 7
"is" to "are" 11,15 "Durfey" to "Durfee" 1232 25 "paecera paecepallum" to " Physarum polyrephalum" 1234 11 "that made" to "that it made" 12 "over" to "or" 1236 6
" impala lorinzini" to "Ampula of Lorenzini" 1253 11 "10 CFR 2.744" to "10 CFR 2.743" 1265 9
"Halamar" to "Hallam" 17 "Almost" to "Almost lost" 1276 20 "that" to "what" 1277 10 "use" to " reuse" 20
" areas" to " pieces" 1292 12 "close" to " gross" I
1304 2
"a bonus" to " BONUS" l
21 "de-use" to " reuse" 1305 23 "let's say," to "let's say, be"
{
1315 19 "if" to "of" l
1318 14
"'69 '70" to "from the '69 '70" l
1319 14 "1980. The" to "1980 using the" l
1324 18
" people associated" to " people on the associated" i
s.
. Transcript page Line Change 1347 23 "decon" to DECON" 1349 3
"four" to "for" 1357 1
"Just" to "Q Just" 4
"PN" to ""NL" 6
"decomination" to " contamination" 10 "Q So" to "So" 1358 17 "P&L study, si" to "PNL study, is" 1384 15
" Lair" to Lehr" 1391 15 "50" to "60" 1415 11 "2.71" to "271" 1521 6
"Ricault Persad" to "Raghaw Prasad" 1524 22
" accidents" to " qualifications" 1556 24
" expensive" to " extensive" 1565 11
" locates" to " allocates" 1565 10 "TJM" to "PJM" 1581 12 "to transmit" to "to transport" 1585 18 "in Culvert," to "in Covert,"
1597 14
" refers to" to " states that" i
1608 24
" contaminated" to " decontaminated" 1629 23
" cooling down of the" to " cooling towers, thu" 24 "the vents." to "the fences,"
j 1638 2
"true.
As to PP&L," to "true as to PP&L."
1642 1
"No, not as to -- the PP&L has been in contact with" to "No, not as to the other utilities but t
PP&L has been in contact with" 1643 3
"if we" to "and we" l
l 1657 11
" agreement of states" to " agreement states" l
1657 12
" existence" to " instance"
. Transcript page Line Change 1669 14 "for" to "from" 1687 22
" valve" to " volume" 1688 2
" insert withdrawal" to " insert or withdrawal" 1691 13
" vent drain" to " vent and drain" 1693 16
" vent drain" to " vent and drain" 1703 14
" disks" to " doses" 21
" correct" to " coolant" 1704 13
" respectable" to "inspectable" 18-19
" ground theory" to " Browns Ferry" 1705 5
" ground theory" to " Browns Ferry" 1708 4
" growth... growth" to " gross... gross" 1709 1
"high control" to " hydraulic control" 1711 4
"be" to "the" 5
" cooled" to " pool" 8
" core" to " pool" 1731-18
" cite" to " site" 1738 14 "No; just it gives" to "No, it gives" 1739 9
" sort" to " source" 1744 13&l4
" worked" to " works" 23 "with" to "with respect to" 1750 10 "or whatever the" to "or whatever, the" 1752 10 "on emergency." to "on emergency planning."
1756 16
" indications" to " concerns" 1757 18 "on that that the" to "on that. The" 21 "as procedure-a sympton-based procedures and" to "as system-based procedures and, as" 22 "the result" to "a result"
\\
. Transcript page Line Change 1759 14
" systems which" to systems in which" 16 "not met but alternative" to "not met. Alternative" 19
" involved are made and" to " involved, are made, and" i
20 delete " charged to" 21
" requirements" to " requirements,"
1761 6
" anteceded" to " initiated" 8
" elements is the operators" to " element is the operators'"
21
" parameters" to " parameter" 1763 2
" pressure" to " direction" 5
" indications" to " conditions" 1768 5
"or" to "of" 25 "d' rained, if you" to " drained.
If you" 1769 14
" spent" to " vent" 15
" drained" to " drain" 1776 17
" guide" to "by" 1777 7
"FDB" to "SDV" 1783 16 "was to referring" to "was not referring" i
1793 4
"and" to "in" 1806 1
"despite" to " design" 1815 10
" STB" to "SDV" t
l 1861 10 "I do know" to "I do not know" 16
" chemical" to " technical" 1867 8
" outage" to " residence" 1881 24 "biostudier" to " biosphere"
- Transcript page Line Change 1884 3
"for" to "or" 1885 2
"by disposal in" to "from disposal by" 1887 15 "19" to "10" 1889 15 "0kla" to "0klo" 1904 3
"F-3" to "S-3" Applicant's Testimony of Grayson E. McNair following Tr.1957:
24 Punch-add "the 1980" hole 28 Punch-add "2.4" hole 1960 7
"some temporary" to " sun tempering" 1962 20
" type" to " tight" 1965 4
"Tunchanic" to "Tunkhannock" 19 "4B" to "4D" "y'ur" to "you" 1971 4
o 2001 2
"is" to "it's" 2006
" installation" to " insulation"
~
2013 19
" sealing" to " ceiling" 2018 3
" load" to " low" 2020 18
" spheres" to " years"
'2021 25
" mix-up" to " fuel mix" 2022 25
" monetary" to "Montour" l
2028 17
" outage" to " usage" i
f 2041 12,14,20,21
" Hamilton" to "Hammel" 2054 21
" upper" to " proper" 2059 3
" connection" to " interconnection" 2060 9,16 "TJM" to "PJM"
. Transcript page Line Change 2061 12
" arrangement. One" to " arrangement, one" 2063 21 "for" to "or" 23,24
" Mils" to " Mills" 2065 3
" kilowatt" to " kilowatt hour" 23 "or" to "for" 2069 6
"of" to "and" 2079 6,10 "KB" to "KV" 2080 14
" depicted" to " detected" 2082 10
" Liability" to " Reliability" 2085 9
"Limrick" to " Limerick" 2089 6
"P&L" to "PP&L" 14 "Limrick" to " Limerick" 2096 23 "PT&L" to "PP&L" 2103 24 "7S percent" to "25 percent" 2109 8
"were to" to "were not to" 2111 13
" front" to " sunk" 2113 6
"other" to "of the" 2117 8
"would not shut" to "would shut" 9
"and operate" to "and not operate" 2119 2
" state, public utility, Commission" to
" state public utility commission" 2125 13
" ineffective of" to "it affects" 2129 8
" eleven gigawatt" to " eleven thousand gigawatt" 2215 21 "TJM's" to "PJM's" 9
2244 9
" plants" to " plans" 2246 4
" clarify" to " clarification" 2253 5
" geographic" to " geometric" 2259 '
17 "like" to "at"
. Transcript page Line Change 2263 7
" roadways and" to " roadways at" 2265 7
"?"
to "."
2267 3
Delete "per" 9
"three-day case" to " peak day case" 16 "overtest" to " overtax" 2269 19
" pregnant" to " permanent" 2272 16 Delete "at the end of the second" 2274 21
" snowfalls" to " snow plows" 2275 7
" condition" to " good condition" 14
" applies" to " implies" 2277 23 "The why" to "The reason why" 2282 4
"with the EPZs" to "within the EPZ" 19 Delete " core" 2283 21 "potention" to " potential" 25 "are" to " area" 2285 21 "90" to "19" 2286 2
"better" to "better way" 2287 6
"in" to "and" 2289 22
" drive" to " driver" 2291 12
" " to "?"
2295 11
" appropriated" to " appropriate" and "from 30" to "from the 30" 2297 13
" involvement" to " enrollment" 14 "transcience" to " transients" 2303 17
" productions" to " reductions" 2325 12 "new" to " news" l
2338 8
"R.N.K." to "0ran K."
r e
-9_
Transcript page Line Change 2340 11
" Commander" to " Command and" 19
" office" to " officer" 2351 17 "31 to 37" to "21 to 27" 2373 25
" rep" to "RERP" 2374 8
" resigned" to " assigned" 2405 7
" stations" to " patients" 2440 1
" accounting" to " counting" 2453 10
" disability" to " visibility" 2455 14
" taps' to " track" 2457 22 "AMES" to "AMS" 2462 2
"first" to " source" 2487 8
" metal" to " natural" 2489 20 "those" to " dose" 2495 18
" plant" to " top" 2504 11
" synaptic" to " synoptic" 2565 5
" followup" to " fallout" 2607 14 "DCB730" to "CD V-730" l
l 2609 3
"HIPPERT" to "BELSER" l
16
" drama" to " drummer" l
2626 14
" Nuclear Regulation" to"NUREG" 2641 7
" relevant" to " irrelevant" 2642 15
" evaluation" to " evacuation" 2679 18
" forces" to " sources" l
2710 7
"Tencanik or Strasburg" to "Tunkhannock or Stroudsburg" l
2719 9
"Macanagua" to "Mocanaqua" l
l
--=
o 4.
ORDERED l
1 ATOMIC SAFETY AND LICENSING BOARD I
.e'
[
_(/.
James P. Gleason, Chairman ADMINISTRATIVE JUDGE i
l i
l 1
J 4
4 Bethesda, Maryland
' March 18, 1982 1
j i
-