ML20041G536

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 7 to Development of Thermal-Hydraulic Stability Methods for Bwrs. Contractor:Rensselaer Polytechnic Inst
ML20041G536
Person / Time
Issue date: 03/04/1982
From: Jacobs A
NRC OFFICE OF ADMINISTRATION (ADM)
To: Batson W, Zuber N
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20041G537 List:
References
CON-FIN-B-7230, CON-NRC-03-78-128, CON-NRC-3-78-128 NUDOCS 8203220484
Download: ML20041G536 (1)


Text

110 3 L)

F fiPC-03-7C-128 DIVislON OF COtolf4 ACTS M00lf aC AllON NuMtil R U.S. FJUCL E Aft RE GUL A10RY CGMMi$510N WASHINGT ON, D.C. 70555 7

D NE W D MODIF ICATION 01 HE R ($pecofri NOTIFICATION OF CONTRACT EXECUTION CONT R ACT B ASE D ON:

f 7,,,,j AU1HOF412 ATION NUMBE R flRR 78-128 Office of fluclear Regulatory Research DATE 9/25/81 i nDM: _

_3

' " ' " ^ ' ' ' " * " ' ' ' " ' " ' * * '

sconivrr sy,

..,u ri i

Wo Extension of period of IJ I

  • erformance, addition of ds and workscope Research Contracts Branch

/9 RECEl' JEU.

M 7

MM1019E Ze ;

f a ust 150510 **

Ad DIVISION OF CONTR ACTG, ADM

\\

i -

c VJ A COrein AC10R lt.'ame A L ocar,on)

ECUTION DATE Rensselaer Polytechnic Institute 3/5/82 Troy, NY 12181 TYPI Of CONTRACT Cost Reimbursement PROJECT TITLE PERIOD OF PERFORMANCE "The Development of Thermal-Hydraulic Stability Methods for Bailing Water PRINCIPAL INVESTIG ATOR Reactors" Dr. R. T. Lahey NRC AUTHORIZED REPRESENTATIVE

=

Dr. Novak Zuber.

B&R NUMBER FIN NUMBCn 60 19 13 B7230 AMOUNT NEW NRC FUNDS s 100,000.00 FUNDING TOTAL FY 82_ FUNDING S 100,000.00 TOTAL NRC OBLIGATIONS S 476,425.00 GOVE RNMENT PROPERTY ATT ACHME NT151:

CONTRACT DOCUMENT l l

NRC F ORM 755 (1076)

S 3203220484 820304

'l l

NRC-03-78-128 PDR

-[)tk PDR CONTR

'uk > 6 tm w

.