Responds to NRC 820115 Ltr Re Violations Noted in IE Insp Rept 50-267/81-25.Corrective Actions:Program Initiated to Control Time Limits on Surveillances.All Involved Personnel Made Aware of Previous Scheduling Problems
ML20041G465
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/11/1982
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20041G464 List:
References
P-82040, NUDOCS 8203220339
Download: ML20041G465 (9)


Text

_ _ _ - _ _ _ - _ _ _ _ _

A PUBLIC SERVICE COMPANY OF COLORADO P. O. BOX 840 OENVER, COLORADO 8020; OSCAR R. LEE February 11, 1982' vice mesiom Fort St. Vrain Unit No. I P-82040 Mr. John T. Collins, Regional Administrator U S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 1000 Arlington, TX 76011

SUBJECT:

I & E Inspection Report 81-25

Dear Mr. Collins:

This letter is in response to the Notice of Violation received as a result of inspections conducted at this facility during the period November 16, 1981 to November 20, 1981. The specific items found in violation and responses are as follows:

1. Technical Specification 5.2.10a 3 requires that the diesel engine for the diesel driven fire pump be inspected each refueling shutdown.

Contrary to this requirement, the diesel engine for the

~

diesel driven fire , pump was not inspected during the May 1981 refueling shutdown. It was last inspected in September 1980 and December 1981.

2. Technical Specification 5.10.1 requires an annual actuation test of the heating and ventilation dampers and fans in the three room control complex Contrary to this requirement, this surveillance test was last performed on July 17, 1980, an interval of 16 months to the date of this NRC inspection. This interval is in excess of the +25 percent adjustment to surveillance intervals permitted by the Technical Specification definition (2.18) of surveillance intervals.

8203220339 820316 PDR ADOCK 05000267 G PDR

D

3. Technical Specifications 5.10.2 (a) and (b) require that the pressure and weight of the Halon storage cylinders be checked quarterly.

Contrary to this requirement, Halon storage cylinder weight and pressure checks were not performed between February 20, 1981 and July 1, 1981. An interval of 19 weeks. This interval is in excess of the +25 percent adjustment to surveillance intervals permitted by the Technical Specification definition (2.18) of surveillance intervals.

These items constitute a Severity Level V Violation.

Response

(1) The corrective steps which have been taken and the results achieved:

Immediately upon learning of the violations it was determined that a program be initiated to maintain a guideline as to surveillance performance time periods, and to establish control over the types of surveillances to insure completion within these time limitations. The Scheduling Department was given .

responsibility of controlling time limits on surveillances.

All involved personnel were made aware of previous Scheduling problems. This has improved the ability to implement the new Surveillance Scheduling Program.

(2) Corrective steps which will be taken to avoid further violations:

A new Surveillance Scheduling Program (Level III Procedure SSP-1) was written and is presently being reviewed for approval. The context of the procedure has been discussed by all concerned to insure that implementation can be attained and maintained. The position of the person controlling the Surveillance Scheduling Program is being upgraded to provide a more technically qualified individual. A new Surveillance Scheduling computer program is being completed by on site Computer Services personnel to maintain a better method of Surveillance Scheduling control.

s o

The surveillances are presently being renumbered by only the suffix portion of the number. This is to aid in determining the type of test.

(3) The date when full compliance will be achieved:

Compliance specifically addressing the violations was achieved on January 4, 1982.

The compliance regarding actions, as listed, to avoid further violations will be achieved by April 1, 1982.

Should you have any further questions, please contact Mr. Ed Hill, (303-571-7436, Ext. 218).

Very truly yours,

{Y$ U

0. R. Lee ORL/skd

. _ . . _ _ . _ _ _ . . - _ _ _ . _ _ _ _ . _ ____ _ _ . . _ ~ . .. . .

(

! .J.*.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter )

)

Public Service Company of Colorado ) Docket No. 50-267.

1 Fort St. Vrain Unit No. 1 )

~

AFFIDAVIT

. . . . . . . being duly sworn, hereby deposes and says that he is Vice President of Electrical Production of Public Service Company of j Colorado; that he is duly authorized to -sign the file with the Nuclear Regulatory Commission the attached response to the Notice af Violation identified in NRC Inspection Report 81-25; that he is familiar with the content thereof; and that the matters- set forth l tharein are true and correct to the best of his knowledge, i

4 information and belief.

1

.i f- ^^

O. R. Lee Vice President of Electrical Production t

i STATE OF O/OrddO )

COUNTY OF NE f .

)

i I

Subscribed and worn to before me, a Notary Public in and for Weld 000 nfy j on this // day of Fe brnMru,, 1982.

4 W$h 7

No1(gry Public l My commission expires // - 29 , 19 _6 5 I

1

_ . . . - - , . _ . . - . , , , _ , . . . . . _ _ . - _ . . , , , _ . . . - - , ~ . , . - , _ _ _ , _ _ _ . , , _

_ _ _ _ - _ . , - . ~,.,,--.._-m,_ _ _ - , ~ _ , .,

i l

A lACHME T l

.r l

l l

l a

-- -w w---