4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS JANUARY, 1982 The unit continued to be shutdown through the month of January for repair of the main generator and Cycle 3 - Cycle 4 refueling operations.
month of January:g safety-related maintenance was performed in the The followin
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Performed various design changes required by NUREG-0737 and NUREG-0588.
- 3. Replaced packing on #9 river water pump.
8203190429 820215
{DRADOCK 05000348 PDR
(
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 2/01/82 COMPLETED BY LI A Hairston (205)899-5156, III TELEPHONE OPERATING STATUS I Unit Name: Joseph M. Farley - Unit 1 Notes 1) Cumulative data 2 Reporting Period: January, 1982 since 12/01/77, date of
- 3. Licensed Thermal Power (MWt):
2652 commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Lesel To Which Restricted. If Any (Net MWe):
N/A'
- 10. Reasons For Restrictions,if Any: N/A This Month Yr..to-Date Cur'nulatise I1. Hours In Reporting Period 744 744 36.552
- 12. Number Of Hours Reactor Was Critical 0
0 20,981.8
- 13. Reactor Reserve Shutdown Hours 0
0 3,492.0
- 14. Hours Generator On-Line 0
0 20,329.7
- 15. Unit Reserse Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
50,944.910.5
- 17. Gross Electrical Energy Generated (MWH) 0 0
16,236,952
- 18. Net Electrical Energy Generated (MWH)
-4816
-4816 15,218,908
- 19. Unit Service Factor 00.0 00.0 55.6
- 20. Unit Availability Factor 00.0 00.0 55.6
- 21. Unit Capacity Factor IUsing MDC Net)
-00.8
-00.8 51.8
- 22. Unit Capacity Factor (Using DER Net)
-00.8
-00.8 50.2 00.0 00.0 10.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
March, 1982
- 26. Units In Test Status (Prior to Conimercial Operation):
Forecast Achiesed
[,
INITIA L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPE 5'.". TION 12/01/77 12/01/77 (9/77)
r r
DOCKET NO.
50-348 j
UNIT 1
DATE 2/01/82
~..
COMPLETED BY W.G. Hairston. III I
TELEPl!ONE (205) 899-5156 MONTil Jan unry. 1982 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAll POWER LEVEL (MWe. Net)
(Mwe. Net)
. 17
-0
- 1 ja 2 - 3 gg 4 -
2D *
- ~ 22 5 6 22 7 23 3
. 3 24 9 25.
10 26 ~ '
gg
_ 27
' 23 12
. -o-33 79
. 14 30 3g IS 16
[NSTRUCTIONS On this format. list the average daily umt power Icvelin MWe Net for each d:y in the reporting month. Compute to the neare:t whole megswatt.
(9[77)
%'a.
u t
e
m UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-148 UNIT N AME
_I _ M. Farlev-Unit 1 DATE 2/01/82 COMPLETED BY W.G. Hairston. III REPORT MONTH January. 1982 TELEPHONE (205) 899-5156 "5
e r.
3 so 5"
.2 _e s
,sX Licensee c-r.
c.
Cause & Corrective No.
Date g
3g y
jp Event s '2 83 Action to
$2 E
j i?i g Report a N0 Prevent Recurrence 6
f 001 811201 F
744 A
3 N/A EB CENERA Continued outage to repair damage to the main generator which occurred September 10, 1981.
Refueling rescheduled to take' advantage of forced outage situation.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)