4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS JANUARY, 1982 The unit continued to be shutdown through the month of January for repair of the main generator and Cycle 3 - Cycle 4 refueling operations.

month of January:g safety-related maintenance was performed in the The followin

1. Performed miscellaneous maintenance on diesel generators.
2. Performed various design changes required by NUREG-0737 and NUREG-0588.
3. Replaced packing on #9 river water pump.

8203190429 820215

{DRADOCK 05000348 PDR

(

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 2/01/82 COMPLETED BY LI A Hairston (205)899-5156, III TELEPHONE OPERATING STATUS I Unit Name: Joseph M. Farley - Unit 1 Notes 1) Cumulative data 2 Reporting Period: January, 1982 since 12/01/77, date of

3. Licensed Thermal Power (MWt):

2652 commercial operation.

860

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

844.6

7. Maximum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Lesel To Which Restricted. If Any (Net MWe):

N/A'

10. Reasons For Restrictions,if Any: N/A This Month Yr..to-Date Cur'nulatise I1. Hours In Reporting Period 744 744 36.552
12. Number Of Hours Reactor Was Critical 0

0 20,981.8

13. Reactor Reserve Shutdown Hours 0

0 3,492.0

14. Hours Generator On-Line 0

0 20,329.7

15. Unit Reserse Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

50,944.910.5

17. Gross Electrical Energy Generated (MWH) 0 0

16,236,952

18. Net Electrical Energy Generated (MWH)

-4816

-4816 15,218,908

19. Unit Service Factor 00.0 00.0 55.6
20. Unit Availability Factor 00.0 00.0 55.6
21. Unit Capacity Factor IUsing MDC Net)

-00.8

-00.8 51.8

22. Unit Capacity Factor (Using DER Net)

-00.8

-00.8 50.2 00.0 00.0 10.0

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

March, 1982

26. Units In Test Status (Prior to Conimercial Operation):

Forecast Achiesed

[,

INITIA L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPE 5'.". TION 12/01/77 12/01/77 (9/77)

r r

DOCKET NO.

50-348 j

UNIT 1

DATE 2/01/82

~..

COMPLETED BY W.G. Hairston. III I

TELEPl!ONE (205) 899-5156 MONTil Jan unry. 1982 DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAll POWER LEVEL (MWe. Net)

(Mwe. Net)

. 17

-0

  • 1 ja 2 - 3 gg 4 -

2D *

  • ~ 22 5 6 22 7 23 3

. 3 24 9 25.

10 26 ~ '

gg

_ 27

' 23 12

. -o-33 79

. 14 30 3g IS 16

[NSTRUCTIONS On this format. list the average daily umt power Icvelin MWe Net for each d:y in the reporting month. Compute to the neare:t whole megswatt.

(9[77)

%'a.

u t

e

m UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-148 UNIT N AME

_I _ M. Farlev-Unit 1 DATE 2/01/82 COMPLETED BY W.G. Hairston. III REPORT MONTH January. 1982 TELEPHONE (205) 899-5156 "5

e r.

3 so 5"

.2 _e s

,sX Licensee c-r.

c.

Cause & Corrective No.

Date g

3g y

jp Event s '2 83 Action to

$2 E

j i?i g Report a N0 Prevent Recurrence 6

f 001 811201 F

744 A

3 N/A EB CENERA Continued outage to repair damage to the main generator which occurred September 10, 1981.

Refueling rescheduled to take' advantage of forced outage situation.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit i. Same Source 19/77) ll-Other (Explain)