Monthly Operating Rept for Jan 1982
ML20041G240
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/01/1982
From: Harriston W
ALABAMA POWER CO.
To:
Shared Package
ML20041G238 List:
References
NUDOCS 8203190429
Download: ML20041G240 (4)


Text

.

4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS JANUARY, 1982 The unit continued to be shutdown through the month of January for repair of the main generator and Cycle 3 - Cycle 4 refueling operations.

The followin month of January:g safety-related maintenance was performed in the

1. Performed miscellaneous maintenance on diesel generators.
2. Performed various design changes required by NUREG-0737 and NUREG-0588.
3. Replaced packing on #9 river water pump.

8203190429 820215

{DRADOCK 05000348 PDR

( OPERATING DATA REPORT DOCKET NO. 50-348 DATE 2/01/82 COMPLETED BY LI A Hairston TELEPHONE (205)899-5156, III OPERATING STATUS I Unit Name: Joseph M. Farley - Unit 1 Notes 1) Cumulative data since 12/01/77, date of 2 Reporting Period: January, 1982 2652 commercial operation.

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 844.6 ,
7. Maximum Dependable Capacity (Net MWe): 803.6
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Lesel To Which Restricted. If Any (Net MWe): N/A'
10. Reasons For Restrictions,if Any: N/A This Month Yr..to-Date Cur'nulatise I1. Hours In Reporting Period 744 744 36.552
12. Number Of Hours Reactor Was Critical 0 0 20,981.8
13. Reactor Reserve Shutdown Hours 0 0 3,492.0
14. Hours Generator On-Line 0 0 20,329.7
15. Unit Reserse Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 50,944.910.5
17. Gross Electrical Energy Generated (MWH) 0 , , ,

0 16,236,952

18. Net Electrical Energy Generated (MWH) -4816 -4816 15,218,908
19. Unit Service Factor 00.0 00.0 55.6
20. Unit Availability Factor 00.0 00.0 55.6
21. Unit Capacity Factor IUsing MDC Net) -00.8 -00.8 51.8
22. Unit Capacity Factor (Using DER Net) -00.8 -00.8 50.2
23. Unit Forced Outage Rate 00.0 00.0 10.0
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup: March, 1982
26. Units In Test Status (Prior to Conimercial Operation): Forecast Achiesed INITIA L CRITICALITY 8/06/77 8/09/77

[, INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPE 5'.". TION 12/01/77 12/01/77 (9/77)

r -

. r

. DOCKET NO. 50-348 j

% UNIT 1 DATE 2/01/82

-..~ . . .. .

COMPLETED BY W.G. Hairston. III I TELEPl!ONE (205) 899-5156 MONTil Jan unry . 1982 DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAll POWER LEVEL (MWe. Net) (Mwe. Net) 17 -0
  • 1 2 - ja gg 3 2D 4
  • ~

5 22 22 6 23 3 7 .

3 24 25 9

~

26 10 gg _ 27 23 12 ..-

33 79 -o- .

14 30 3g ..- IS 16  : ,

[NSTRUCTIONS On this format. list the average daily umt power Icvelin MWe Net for each d:y in the reporting month. Compute to the neare:t whole megswatt.

. (9[77)

%'a.

u .

. t

- e . .

% - m DOCKET NO. 50-148 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME _I _ M. Farlev-Unit 1 DATE 2/01/82 REPORT MONTH January. 1982 COMPLETED BY W.G. Hairston. III TELEPHONE (205) 899-5156

. "5 -

e

.2 _e r.

s 3 so

,sX Licensee c

-r.

5"

c. Cause & Corrective No. Date g 3g y jp Event s '2 83 Action to

$2 E j i?i g Report a N0 ' Prevent Recurrence 6

f 001 811201 F 744 A 3 N/A EB CENERA Continued outage to repair damage to the main generator which occurred September 10, 1981. Refueling rescheduled to take' advantage of forced outage situation.

I 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit i . Same Source 19/77) ll-Other (Explain)