Text
.
l OUISI ANA f 242 onAnoNoE smm POWE R & L1G H T/ P O BOX 6000
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345
'TSS EsYN3 u
March 5, 1982 G. D. McLENDON Senior Vice President W3K-82-0136 Q-3-A35.07.23
\\,~
- s. \\
Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commissio-y 611 Ryan Plaza Drive, Suite 1000 y
- d CJgw;)
Arlington, Texas 76012
.r[
'MR 131982* T3
Subject:
Waterford SES Unit No. 3
' ' M *F? mW Nea
'# fi[* "
Docket No. 50-382 o
7 Sixth Interim Report A
Significant Construction Deficiency #28 N:
"Two Inch and Below Schedule 160 Socket Welds Undersize"
,(n Re ference: Telecon - L. Bass (LP&L) to B. Crossman (NRC) on 3/2/82
Dear Mr. Collins:
As discussed in the reference telecon, the report on Significant Con-struction Deficiency #28 will not be transmitted as previously scheduled.
Additional time is needed in order to complete the paper work review and physical inspection of the undersized socket welds.
The final report will be submitted by April 15, 1982.
l Yours very truly, I
A = -
^K' l
4 GDMcL:LLB:grf
[ r%
cc:
- 1) Director, Office of Inspection and Enforcement r
l U. S. Nuclear Regulatory Commission l
Washington, D. C. 20555 6
- 2) Director, Office of Management
~ ~
Information and Program Control
]hh I
U. S. Nuclear Regulatory Commission
, r-
1 Washington, D. C. 20555 s
)@R - 91982 l
J l
8203170283 820305 DR ADDCK 03000362 PDR l