e C011SufilBIS power u-w c.*
Vice President - Projects, Engineering and Constructson oeneral offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 788 0453 March 10, 1982
- 4 S
IMECENED 3
MART 8 4 Harold R Denton, Director gp '
Office of Nuclear Reactor Regulation ac U
US Nuclear Regulatory Commission U
k'ashington, DC 20555
- u re MIDLAND PROJECT MIDLAND DOCKET NO 50-329, 50-330 PROTECTION OF EXCAVATION FACE FOR THE AUXILIARY BUILDING UNDERPINNING ACCESS SHAFT FILE: 0485.16 SERIAL:
16246 In accordance with discussions with the NRC Staff and its consultants during the February 1-5, 1982 audit, the following notes are being included in the design documents for the auxiliary building underpinning access shaft. These notes require the underpioning contractor to provide measures for protecting the access drift excavation face during any prolonged work stoppage and for dealing with localized groundwater which may be encountered during excavation.
1.
ine subcontractor shall design and install breastboarding and related bracing to laterally support the soil at the excavation face of access drifts during periods of temporary work stoppage. Any period of more than eight hours in which excavation at the face is not to be continued shall be considered a work stoppage.
2.
The underpinning pier pits shall be carefully excavated, lagged, backpacked and braced to prevent loss of surrounding soil. Pit construction procedures to be submitted for approval of the contractor shall include the handling of perched groundwater, flowing or running ground and seepage into the pit and belling in the clay till.
b oc0382-0039a100 0203170131 820310 PDR ADOCK 05000329 A
1 We will also be prepared to discuss these precautions with the Staff at the NRC audit scheduled for March 16-19, 1982 in Bechtel's Ann Arbor offices.
M a
JWC/RLT/dsb CC Atomic Safety and Licensing Appeal Boar CBechhoefer, ASLB MMCherry, Esq FPCowan, ASLB RJCook, Midland Resident Inspector RSDecker, ASLB SGadler JHarbour, ASLB GHarstead, Harstead Engineering DSHood, NRC (2)
DFJudd, B&W JDKane, NRC FJKelley, Esq RBLandsman, NRC Region III WHMarshall JPMatra, Naval Surface Weapons Center W0tto, Army Corps of Engineers WDPaton, Esq j
SJPoulos, Geotechnical Engineers FRinaldi, NRC HSingh, Army Corps of Engineers BStamiris I