| Issue date: | 03/05/1982 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| W3K-82-0137, W3K-82-137, NUDOCS 8203170094 | |
| Download: ML20041F529 (1) | |
Text
.
142 DELARONDE STREET POWER & L1GHT P O BOX 6008
- NEW OALEANS LOUISlANA 70174. (504) 366-2345 WDCLE SOUTH uTw+ s s<sita' March 5,1982 G. D. McLENDON Senior Vice President W3K-82-0137 Q-3-A35.07 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 E
D f
Arlington, Texas 76012 q
N-
Subject:
Waterford SES Unit No. 3
'filCd
\\c g
Docket No. 50-382 y4gIO
! cragh{pp/Sgg 7 Second Interim Report Potentially Reportable Deficiency #60 g
Ex
- ggy, j
"B-Line Fittings Defects" Ich"Os Q P
Reference:
Telecon - L. Bass (LP&L) to B. Crossman (NRC) on 8p
Dear Mr. Collins:
As discussed in the referenced telecon, the report on the subject item will not be transmitted as previously scheduled.
Additional information is required from B-Line Systems, Inc. prior to completing the evaluation of this item. This information is expected during March.
This is the second extension of the thirty (30) day report on PRD #60.
Due to the additional time required, a report will not be transmitted to the NRC until April 15, 1982.
Yours very truly, l
l GDMcL:LLB:grf
(,.
_ _ ~.. - -
.>j cc:
- 1) Director, Office of Inspection and Enforcement /f gg I
U. S. Nuclear Regulatory Commission b
Washington, D. C. 20555 g
i
=
2)
Director, Office of Management
~
l Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 O
8203170094 820305 PDR ADOCK 03000382 S
(