Second Interim Deficiency Rept 60 Re B-Line Fittings Defects.Addl Info Expected from B-Line Sys,Inc During Mar. Requests Second Extension of 30-day Rept.Next Rept Scheduled for 820415
ML20041F529
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/05/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
W3K-82-0137, W3K-82-137, NUDOCS 8203170094
Download: ML20041F529 (1)


Text

.

142 DELARONDE STREET POWER & L1GHT P O BOX 6008

  • NEW OALEANS LOUISlANA 70174 . (504) 366-2345 WDCLE SOUTH uTw+ s s<sita' March 5,1982 G. D. McLENDON Senior Vice President W3K-82-0137 Q-3-A35.07 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 E D f Arlington, Texas 76012 q

- N-

Subject:

Waterford SES Unit No. 3 'filCd \c g

Docket No. 50-382 Second Interim Report y4gIO Potentially Reportable Deficiency #60 !g cragh{pp/Sgg Ex ggy, 7 j "B-Line Fittings Defects" Ich"Os Q P

Reference:

Telecon - L. Bass (LP&L) to B. Crossman (NRC) on 8p

Dear Mr. Collins:

As discussed in the referenced telecon, the report on the subject item will not be transmitted as previously scheduled.

Additional information is required from B-Line Systems, Inc. prior to completing the evaluation of this item. This information is expected during March.

This is the second extension of the thirty (30) day report on PRD #60.

Due to the additional time required, a report will not be transmitted to the NRC until April 15, 1982.

Yours very truly, l

l GDMcL:LLB:grf _ _ ~ . . - - (,.

.>j cc: 1) Director, Office of Inspection and Enforcement /f U. S. Nuclear Regulatory Commission I

$ gg Washington, D. C. 20555 g b ---

i =

Director, Office of Management

~

l 2)

Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 O

8203170094 820305 PDR ADOCK 03000382 S PDR

( J