The Light CotttPuy iie",'"
'ix 'i x & re-cr ito. iiex i7"o iie,te". Tex s 77aoi <7is> 228-92i>
n
=
March 15, 1982 ST-HL-AE-803 SFN: V-0100 OJ h
og 2
Mr. Robert L. Tedesco REC &ftMD Assistant Director for Licensing Division of Licensing SJ MAR 161982r+. 73 U.S. Nuclear Regulatory Commission n im9t marm eswa -
f' C"ff"88 Washington, D.C.
20555
/ 'y.
j
Dear Mr. Tedesco:
c)
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Ebasco Qualifications Summary Attached is a summary of Ebasco Services, Incorporated (Ebasco) nuclear power plant experience including a listing of projects for which Ebasco has served as architect-engineer, consulting engineer, constructor or construction manager.
Your letter of February 12, 1982 requested additional information relative to the constructor at the South Texas Project (STP). The information relative to Quality Assurance matters has been submitted under a ser. irate cover letter.
The attached summary completes our response to your request for additional information of February 12, 1982.
Very truly yours, O
/
J. H. Goldberg Vice President Nuclear Engineering and Construction MEP/blt Attachment god g
.s,
./I 8203170079 820315 PDR ADOCK 05000498 A
lionston I.ighting & Power Company cc:
March 15, 1982 J. H. Goldberg ST-HL-AE-803 J. G. Dewease SFN: V-0100 J. D. Parsons Page 2 D. G. Barker C..G. Robertson R. A. Frazar J. W. Williams J. W. Briskin J. E. Geiger R. L. Ulrey S. M. Dew J. T. Collins (NRC)
D. E. Sells 1 (NRC)
W. M. Hill, Jr.
(NRC)
M. D. Schwarz (Baker & Botts)
R. Gordon Gooch (Baker &Botts)
J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)
STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 R. L. Range /G. W. Muench Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 R. L. Hancock/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livennore, Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Benvick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director l
U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Revision Date 2-22-82
Summary of Ebasco's Nuclear Power Plant Experience Construction Service Ebasco has more than 20 years of experience in the design, engineering and/or construction of nuclear plants in the United States and world-wide.
These plants, which have a total capacity in excess of 18,000 megawatts, are listed in Table 1.
This tabulation shows that Ebasco has performed a variety of functions (i.e., architect-engineer, consulting engineering, constructor, and construction manager) either singly or in combination.
Ebasco was the constructor or construction manager at 17 nuclear units, 6 of which are PWR's.
Ebasco has served as architect-engineer for 5 nuclear units at which construction services were performed by other organizations; and has providad construction services at one unit (Ft. St. Vrain Project) to another archit:ct-engineer's design.
Ebasco has specific experience in the take-over of construction managem.et activities at the Laguna Verde project, where work had been started by others.
Ebasco's current PWR experience involves the performance of construction services at St. Lucie Unit No. 2, Waterford Unit No. 3, and WPPSS No. 3.
It should be noted that Table 1 lists the primary construction function performed by Ebasco (Construction Management or Constructor).
In cases such as Waterford 3, full scope Construction Maragement services are provided by Ebasco.
In addition selected construction services are also provided.
Quality Assurance, i
Ebasco's Quality Assurance Program for nuclear power plants has evolved over many years of experience in the nuclear industry. The Program has been formalized and documented in a Topical Report, ETR-1001, Rev. 10A, which has l
been approved by the Nuclear Regulatory Commission (NRC) for incorporation i
into docket by reference. The Program is implemented by organization indivi-duals who are qualified to the requirements of applicable NRC Regulatory Guides, Cooes and ANSI Standards. Compliance with the Program requirements is assured through Quality Assurance (QA) Management and project audits.
TABLE 1
SUMMARY
OF EBASCO NUCLEAR POWER PLANTS (COMPLETED OR UNDER CONSTRUCTION) EXPERIENCE EBASCO N0.
TYPE OF RATING RESPONSIBILITY DATE OF PLANT NAME UNITS UTILITY PLANT (MWE)
(see Note 3)
OPERATION Angra Dos Reis 1
Furnas-Centrais PWR(W) 650 CE 12-78 Electricas SA WPPSS 3 & 5 2
Washington Public Power PWR(CE) 1300 each AE,CM 6-85 (note 1)
Supply System PNPP-1 1
Philippine National Power Corp PWR(W) 600 CE 1982 Laguna Verde 2
Comision Federal de Electricidad BWR(GE) 675 each AE,CM 1983/84 Sh: aron Harris 4
Carolina Power & Light Company PWR(W) 960 each AE 6-84, 6-87 1, 2, 3, 4 (note 2)
Waterford 3 1
Louisiana Power & Light Company PWR(CE) 1165 AE,CM 10-82 Tokai 2, Japan 1
Japan Atomic Power Company BWR(GE) 1100 AE 8-78 Fukushima 6, Japan 1
Tokyo Electric Power Company BWR(GE) 1100 AE 1-80 Chin Shan 1 & 2 2
Taiwan Power Company BWR(GE) 636 each AE,CM 4-78, 4-79 Taiwan Fukushima 3 & 4 2
Tokyo Electric Power Company BWR(GE) 760 each CE 12-74, 8-78 Japan Shimane, Japan 1
Chukogo Electric Power Company BWR(GE) 460 CE 6-74 St. Lucie 1 & 2 2
Florida Power & Light Company PWR(CE) 800 each AE,C 6-76, 11-82 Nots 1:
WPPSS #5 has been cancelled, i
Note 2:
Shearon Harris No. 3 & 4 have been cancelled.
l Note 3:
C = Constructor CE = Consulting Engineer CM = Construction Manager AE = Architect-Engineer
TABLE 1 (Continued)
SUMMARY
OF EBASCO NUCLEAR POWER PLANTS (COMPLETED OR UNDER CONSTRUCTION) EXPERIENCE EBASCO TYPE OF RATING RESPONSIBILITY DATE OF N0.
PLANT NAME UNITS UTILITY PLANT _
(MWE)
(see Note 3)
OPERATION Fukushima 2 1
Tokyo Electric Power Company BWR(GE) 780 AE 73 Fcrt St. Vrain 1
Public Service Company of Colorado HTGR(GGA) 342 C
12-76 Vermont Yankee 1
Vermont Yankee Nuclear Power Corp BWR(GE) 540 AE,C 10-72 H P Robinson 2 1
Carolina Power & Light Company PWR(W) 772 AE,C 3-71 Millstone 1 1
Northeast Utilities BWR(GE) 682 AE,C 12-70 Fukushima 1 Japan 1
Tokyo Electric Power Company BWR(GE) 380 AE 10-70 Isuruga, Japan 1
Japan Aton.
Power Lompany BWR(GE) 357 AE,CM 9-70 Santa Maria de 1
Centrales Nucle.or Del Norte, SA BWR(GE) 460 AE,CM 8-69 Garona, Spain Carigliano, Italy 1
Ente Nazional per L'Energia BWR(GE) 164 AE,CM 5-64 Ellettrica Tokai 1, Japan 1