JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS FEBRUARY, 1982 There were one (1) manual shutdown (continued from 1/31/82) and one (1) automatic shutdown in the month of February.

The following safety-related maintenance was performed in the month of February:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired letdowc orifice isolation valve.
3. Repaired "B" S/G blowdown isolation valve.
4. Complete field inspection performed on reactor coolant pump 2A.

8203160472 820312 '

PDR ADOCK 05000364 R PDR

OPERATING DATA REPORT DOCKET NO. 50-364 DATE _3/01/82 COMPLET ED llY W.G. Hairston, III TELEPilONE (205) 899-5156 OPERA'IING STAIUS

1. Unit Name: Joseph M. Farley - Unit 2 N"I'5 1) Cumulative data
2. Reportmg Period: Ec. q bI_uqry . 1982 since 7/30/81 date of
3. Licenwd 1 hennal Power (MWr): 2652 commercial operation.
4. Nameplate Rating (Grow MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Masimum Dependahle Capacity (Gross MWe): 854.7
7. Masimum Dependahle Capacity (Net MWe): 813.7
8. If Changes occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gise Reasons:

N/A

9. Power Lesel To hhich Restricted.lf Any (Net MWe): N/A
10. Reasons For Re,trictions,if Any: N/A
f. T his Month Yr. to-Date Cd.nulatise 11, llours in Reporting Period 672 1.416 5.137
12. Number Of Ilours Reactor Was Critical 36,8 756.3 4,436.5 '
13. Reactor Rewne Shutdown lionrs 0 24.5 65.3
14. Ilours Generator On 1.ine 9.8 686.8 4,353.3
15. Unit Resene Shutdown llours 0 0 o
16. Grow Thermal Energy Generated (MWili 10.186.4 1.718.005.6 11.184.163 2.,

17 Grow Electrical Energy Generated (MWill 1,704 _ , , ,

554,704 3,626,082

18. Net Electrical Energy Generated (MWil) -8.5 32 515.716 3.416.416
19. Unit Senice Factor 1.5 48.s

~

84.7

20. Unit Asailability Factor 1.5 48.5 84.7
21. Unit Capacity Factor iUsing MDC Nett 1.6 44.8 82.2
22. Unit Capacity Factor (Using DER Net) 1.5 43.9 80.7
23. Unit Forced Outage Rate 98.5 51.5 15.3
24. Shutdowns Scheduled Oser Nest 6 Months (Typc. Date..ind Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior Io Commercial Operation): Forecast Achies ed INIII A L CRITICALIIY 5/06/81 5/ng/g1 b INillAL ELFCTRICITY 5/24/81 5/25/81 COMMERCIA L OPER A IlON 8/01/81 7/30/81

/,

(9/77)

, , . . . , . -.~....n. ,n.

. . .n.......n~...,n.- . . no w. -

r

,"* .- DOCYR NO. 50-364

WIT J.M. Farley-Unit 2

.. DAE 3/01/82 COMPLETED BY W.G. Hairston, III TELEPl!ONE (20S) 899-5156 SIONT11 Feb rua ry . 1982 -

< DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAIL POWER LEVEL f (MWe Net) (MWe. Net)

I.

g7 2 .

gg 3 g9 -

4 20

  • 5 21 ' 6 22 7 23

((m N g -

24 9 25 . .

10 -

26 "

- 3g 27 .

I 12 ,

a I

13 ;9 .

g,g 30 gs _

,3g 16  : _

INSTRUCEONS On this formar. list the sverage dady unit power Icvelin MWe-Net for esch dsy in the reporting month. Compute to the neare:t whole mepwatt. j

., l

' - ~

. (9(77) w;L ,

e .

t 5

. . e . .

l t _ . _ _ _ _ . . _ _ _ _ _ _ __ -- -

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNITNAME .i . M. Farley-Unit 2 DATE 3/01/82 REPORT MONTil February, 1982 COMPLETED BY W C. Hairston . III TELEPIIONE 1205) 899-5156

. "i -

No.

. .! E };; Yk Licensee E.t. g4 Cause & Corrective DJtC H

R 58 ,s5 Event uT o" Action to

$E 5 j$g Report # ,

<50 Provent Recurrence S

003 820131 F 648.5 A 1 NA CB PUMP XX Continued unit shutdown due to reactor coolant pump seal leakage.

004 820228 F 13.75 A 3 NA CH PUMP XX Reactor trip due to the receipt of a 2A steam generator low level signal caused by the cycling of the 2A MW miniflow. A consecutive reactor trip occurred when the unit was being synchronized to the grid due to a failure in the DEH System.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G. Instructions A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

D. Regulatory Restriction Event ReporI(EER) FileiNUREG-4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative $

G-Operational Error (Explain)

(9/77) ll-01her (Explain) Exhibit 1 Same Source

' l

e eb

\

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS FEBRUARY, 1982

. There were one (1) manual shutdown (continued from 1/31/82) and one (1) automatic shutdown in the month of February.

The following safety-related maintenance was performed in the month of February:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired letdown orifice isolation valve.
3. Repaired "B" S/G blowdown isolation valve.
4. Complete field inspection performed on reactor coolant pump 2A.

d e

i I

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 3/01/82 COMPLETED fly W.G. Hairston, III TELEPil0NE (205) 899-5156 OPERAllNG STATUS l'. Unit Name: Joseph M. Farley - Unit 2 Notes 1) Cumulative data

2. Reporting Period: EchT;:arv. 1982 since 7/30/81 date of 2652 commercial operation.
3. Licenxd Thermal Power (MWr):
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Masimum Dependable Capacity (Grou MWe): 854.7
7. Maximum Dependable Capacity (Net MWe): 813.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

  1. 9. Power Lesel To which Restricted.If Any (Net MWe): N/f
10. Reasons For Restrictions. If Any: N/A
This Month Yr to.Date Cumularise i1. ifours in Reporting Period 672 1.416 5.137
12. Number Of flours Reactor Was Critical 36.8 756.3 4,436.5
13. Reactor Resene Shutdown llours 0 24.5 65.3
14. Ilours Generator On-Line 9.8 666.8 4,353.3
15. Unit Resene Shutdown llours 0 0 o
16. Gross Thermal Energy Generated (MWH) 10.186.4 1.718.005.6 11.1EL 163.2
17. Grow Electrical Energy Generated (MWil) 1,70_4 ,,

554,704 3,626,082

18. Net Electrical Energy Generated (MWH) -8.532 515.716 1.416.416

~

19. Unit Senice Factor 1.5 g g , i; 84.7
20. Unit Availability Factor 1.5 48.5 84.7
21. Unit Capacity Factor iUsing MDC Net) 1.6 44.8 82.2
22. Unit Capacity Factor (Using DER Net) 1.5 43.9 80.7
23. Unit Forced Outage Rate 98.5 51.5 15.3
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each t:

N/A

25. IIShut Down At End Of Report Period. Estim,ted Date of Startup: N/A
26. Units in Test Status (Prior o Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/ng/R1 5 INITIAL ELECTRICITY 5/24/81 5/25/81

~

COMMERCIAL OPER ATION 8/01/81 7/30/81

/. ,

(9/77 )

i

. e 9

. DOCKET NO. 50-364 m

) ' WIT J.M. Farley-Unit 2 DAH 3/01/82 COMPLETED BY W.G. Hairston, III

. .I TELEPHONE (205) 899-5156 MONTil February. 1982 .

DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (Mwe-Net) g, 37

. gg 2

.,, 39 3 4'

20 21 5

6 22 7 23

(

m. .

3 24 9 25 - .

10

  • 26 *
  • g3 27 .

gg

- 28 -40'- .

29 13 .

34 -

30 3g , ,. 35 ,

16  : p.

INSTRUCTIONS .

~

On this formst. list the sverage daily unit powe-!cvelits MWe-Net for each d:y in the reporting month. Compute to the nearest whole mepwatt.

~

e - -

, , (9477) m.)

s .

. t

- t- .

e.- we e e=-- ~ * *

<r -

3 UNIT SilUTDOWNS AND POWER REDUC 110NS DOCKET NO. 50-364 UNIT NAME J.M. Farley-Unit 2 DATE 3/01/82 COMPLETED BY M C- H ai rs t on . III REPORT MON 71f Februarv.1982 TELEPHONE (70s) 899-5156 I

"u No. Date

~

M.

.! E 3=

}g }Yg5 Licensec Event

!v, aT 0*L Cause A CurrecsIve Action so

$ h. E ji2g Repori a ,

i50 j Prevent Recurrence 5

003 ,

820131 F 648.5 A 1 NA G PUMP XX Continued unit shutdown due to reactor coolant pump seal leakage.

004 820228 F 13.75 A 3 NA G PUMP XX Reactor trip due to the receipt of a 2A steam generator low level signal caused by the cycling of the 2A }GP miniflow. A consecutive reactor trip occurred when the unit was being synchronized to the grid due to a failure in the DEH System.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)