JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS FEBRUARY, 1982 There were one (1) manual shutdown (continued from 1/31/82) and one (1) automatic shutdown in the month of February.
The following safety-related maintenance was performed in the month of February:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repaired letdowc orifice isolation valve.
3.
Repaired "B" S/G blowdown isolation valve.
4.
Complete field inspection performed on reactor coolant pump 2A.
8203160472 820312 PDR ADOCK 05000364 R
OPERATING DATA REPORT DOCKET NO.
50-364 DATE _3/01/82 COMPLET ED llY W.G. Hairston, III TELEPilONE (205) 899-5156 OPERA'IING STAIUS
- 1. Unit Name: Joseph M. Farley - Unit 2 N"I'5 1)
Cumulative data Ec. bI_uqry. 1982 since 7/30/81 date of
- 2. Reportmg Period:
q
- 3. Licenwd 1 hennal Power (MWr):
2652 commercial operation.
- 4. Nameplate Rating (Grow MWe):
860
- 5. Design Electrical Rating (Net MWe):
829
- 6. Masimum Dependahle Capacity (Gross MWe):
854.7
- 7. Masimum Dependahle Capacity (Net MWe):
813.7
- 8. If Changes occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gise Reasons:
N/A
- 9. Power Lesel To hhich Restricted.lf Any (Net MWe):
N/A
- 10. Reasons For Re,trictions,if Any:
N/A f.
T his Month Yr. to-Date Cd.nulatise 11, llours in Reporting Period 672 1.416 5.137
- 12. Number Of Ilours Reactor Was Critical 36,8 756.3 4,436.5
- 13. Reactor Rewne Shutdown lionrs 0
24.5 65.3
- 14. Ilours Generator On 1.ine 9.8 686.8 4,353.3
- 15. Unit Resene Shutdown llours 0
0 o
- 16. Grow Thermal Energy Generated (MWili 10.186.4 1.718.005.6 11.184.163 2.,
17 Grow Electrical Energy Generated (MWill 1,704 554,704 3,626,082
- 18. Net Electrical Energy Generated (MWil)
-8.5 32 515.716 3.416.416
- 19. Unit Senice Factor 1.5
~
48.s 84.7
- 20. Unit Asailability Factor 1.5 48.5 84.7
- 21. Unit Capacity Factor iUsing MDC Nett 1.6 44.8 82.2
- 22. Unit Capacity Factor (Using DER Net) 1.5 43.9 80.7
- 23. Unit Forced Outage Rate 98.5 51.5 15.3
- 24. Shutdowns Scheduled Oser Nest 6 Months (Typc. Date..ind Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior Io Commercial Operation):
Forecast Achies ed INIII A L CRITICALIIY 5/06/81 5/ng/g1 b
INillAL ELFCTRICITY 5/24/81 5/25/81 COMMERCIA L OPER A IlON 8/01/81 7/30/81
/,
(9/77)
-.~....n.
,n.
.n.......n~...,n.-
no w.
r DOCYR NO.
50-364 WIT J.M. Farley-Unit 2 DAE 3/01/82 COMPLETED BY W.G. Hairston, III TELEPl!ONE (20S) 899-5156 SIONT11 Feb rua ry. 1982 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAIL POWER LEVEL f
(MWe Net)
(MWe. Net)
I. g7 gg 2.
3 g9 4 20 -
5 21 '
- 6 22 7 23
((m N
g 24 9 25.
10 26 -
- 3g 27.
I 12,
a,
I 13 ;9 g,g ' 30 gs _
,3g 16 INSTRUCEONS On this formar. list the sverage dady unit power Icvelin MWe-Net for esch dsy in the reporting month. Compute to the neare:t whole mepwatt.
j l
~
(9(77) w;L e
t e
5 l
t
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNITNAME.i. M.
Farley-Unit 2 DATE 3/01/82 REPORT MONTil February, 1982 COMPLETED BY W C.
Hairston. III TELEPIIONE 1205) 899-5156 "i
.! E
}
Yk Licensee E.t.
g4 Cause & Corrective No.
DJtC R
58
,s5 Event uT o"
Action to H
$E 5
j$g Report #
Provent Recurrence
<50 S
003 820131 F
648.5 A
1 NA CB PUMP XX Continued unit shutdown due to reactor coolant pump seal leakage.
004 820228 F
13.75 A
3 NA CH PUMP XX Reactor trip due to the receipt of a 2A steam generator low level signal caused by the cycling of the 2A MW miniflow.
A consecutive reactor trip occurred when the unit was being synchronized to the grid due to a failure in the DEH System.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI(EER) FileiNUREG-D. Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination F Administrative G-Operational Error (Explain)
Exhibit 1 Same Source (9/77) ll-01her (Explain) l
e eb
\\
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS FEBRUARY, 1982 There were one (1) manual shutdown (continued from 1/31/82) and one (1) automatic shutdown in the month of February.
The following safety-related maintenance was performed in the month of February:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repaired letdown orifice isolation valve.
3.
Repaired "B" S/G blowdown isolation valve.
4.
Complete field inspection performed on reactor coolant pump 2A.
d e
i I
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 3/01/82 COMPLETED fly W.G. Hairston, III TELEPil0NE (205) 899-5156 OPERAllNG STATUS l'. Unit Name: Joseph M. Farley - Unit 2 Notes 1)
Cumulative data
- 2. Reporting Period: EchT;:arv. 1982 since 7/30/81 date of
- 3. Licenxd Thermal Power (MWr):
2652 commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
829
- 6. Masimum Dependable Capacity (Grou MWe):
854.7 813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Lesel To which Restricted.If Any (Net MWe):
N/f
- 10. Reasons For Restrictions. If Any:
N/A This Month Yr to.Date Cumularise i1. ifours in Reporting Period 672 1.416 5.137
- 12. Number Of flours Reactor Was Critical 36.8 756.3 4,436.5 0
24.5 65.3
- 13. Reactor Resene Shutdown llours
- 14. Ilours Generator On-Line 9.8 666.8 4,353.3
- 15. Unit Resene Shutdown llours 0
0 o
- 16. Gross Thermal Energy Generated (MWH) 10.186.4 1.718.005.6 11.1EL 163.2
- 17. Grow Electrical Energy Generated (MWil) 1,70_4 554,704 3,626,082
- 18. Net Electrical Energy Generated (MWH)
-8.532 515.716 1.416.416
~
1.5 g g, i; 84.7
- 19. Unit Senice Factor
- 20. Unit Availability Factor 1.5 48.5 84.7
- 21. Unit Capacity Factor iUsing MDC Net) 1.6 44.8 82.2 1.5 43.9 80.7
- 22. Unit Capacity Factor (Using DER Net) 98.5 51.5 15.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each t:
N/A
- 25. IIShut Down At End Of Report Period. Estim,ted Date of Startup:
N/A
- 26. Units in Test Status (Prior o Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/ng/R1 5
INITIAL ELECTRICITY 5/24/81 5/25/81
~
COMMERCIAL OPER ATION 8/01/81 7/30/81
/.
(9/77 )
i e
9 DOCKET NO.
50-364 m
)
WIT J.M. Farley-Unit 2 DAH 3/01/82 COMPLETED BY W.G. Hairston, III
.I TELEPHONE (205) 899-5156 MONTil February. 1982 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (MWe. Net)
(Mwe-Net) '. 37 g, 2 gg
- 39 '
3 4' 20 - **
5 21 6 22
' 7 23 m.
(
3 24,
9 25 -
10 26 *
- g3 27
-40'-
gg - 28
, 13 29
' 30 34 3g 35 16
- p.
INSTRUCTIONS
~
On this formst. list the sverage daily unit powe-!cvelits MWe-Net for each d:y in the reporting month. Compute to the nearest whole mepwatt.
~
e (9477) m.)
t s
t-e.- we e e=--
~ * *
<r -
3 UNIT SilUTDOWNS AND POWER REDUC 110NS DOCKET NO.
50-364 UNIT NAME J.M.
Farley-Unit 2 DATE 3/01/82 COMPLETED BY M C-H ai rs t on. III REPORT MON 71f Februarv.1982 TELEPHONE (70s) 899-5156 I
"u Licensec
!v, 0*L Cause A CurrecsIve
.! E
}
}Y
~
No.
Date M.
3=
g g5 Event aT Action so
$ h.
E ji2g Repori a j
i50 Prevent Recurrence 5
003 820131 F
648.5 A
1 NA G
PUMP XX Continued unit shutdown due to reactor coolant pump seal leakage.
004 820228 F
13.75 A
3 NA G
PUMP XX Reactor trip due to the receipt of a 2A steam generator low level signal caused by the cycling of the 2A }GP miniflow. A consecutive reactor trip occurred when the unit was being synchronized to the grid due to a failure in the DEH System.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E4peratur Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I Same Source (9/77)
Il-Other (Explain) l