JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS FEBRUARY, 1982 The unit continued to be shutdown through the month of February for repair of the main generator and Cycle 3 - Cycle 4 refueling operations.

The following safety-related maintenance was performed in the I

month of January:

1. Performed miscellaneous maintenance on diesel generators.
2. Replaced pump for radiation monitor R24A.
3. Repaired pressurizer auxiliary spray valve leak.
4. Replaced reactor cavity (Post LOCA) H dilution fan.

2

5. Complete field inspection performed on reactor coolant pumps 1A and IB.

i R

t

4 OPERATING DATA REPORT l

DOCKET NO..50-348 DATE 3/01/82 COMPLETED itY W.C. Hairston, III TELEPilONE (9mu Ro4-5156 OPERATING STAlOS

1. Unit Name:

Joseph M. Farley - Unit 1 Notes 1)

Cumulative data since 12/01/77, date of

2. Reporting Period:

Feb rua ry. 1982 commercial operation.

3. Licensed Thermal Power (%IW ):

2652

4. Nameplate Ratmg (Gross MWe):

860

5. Design Electrical Rating (Net MWe): 829
6. Maumum Dependable Capacity (Gross MWe):

844.6

7. Masimum Dependable Capacity (Net MWe):

803,6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

N/A

9. Power Lesel To which Restricted. If Any (Net MWe):

N/A-

10. Reasons Fe,r Restrictions. lf Any: N/A lhis Month Yr. to-Date Cumulatise i1. Ilours in Reporting Period 672 1416 37.224
12. Number Of floun Reactor Was Critical 0

0 20.981.8

13. Reactor Resene Shutdown llours 0

0 3.492.0

14. Ilours Generator On.Line 0

0 20,329.7 IS. Unit Resene Shutdown llours 0

0 0

16. Gross Thermal Energy Generated (MWil) 0 0

50.944.910.5

17. Grow Electrical Energy Generated (MWil) 0'__,,,...

0 16.236.952

18. Net Electrical Energy Generated (MWil)

-12006

-16822 15,206,902

19. Unit Service Factor 00.0 00.0 54.6
20. Unit Availability Factor 00.0 00.0 54.6
21. Unit Cagucity Factor (Using MDC Net)

-2.2

-1.5 50.8

22. Unit Capacity Factor (Using DER Net)

-2.2

-1.4 49.3

23. Umt Forced Outage Rate 100.0 100.0 12.6
24. Shutdowns Scheduled Over Nest 6 Months (Type. Date,and Duration of Exh1:

N/A

25. If Shut Down At Fnd Of Report Period. Estimated Date of Startup:

March, 1982

26. Units in les Status (Prior to Commercial Operation):

Forecast Achiesed INi flA L CRi flCAll fY 8/06/77 8/09/77 INillAL ELFClRICITY 8/20/77 8/18/77 COMMERCIA L OPER A IlON 12/01/77 12/01/77

  1. h (9/77) g

_ ~ -

P

~..

' ~

DOCKET NO.

50-348 m,

UNIT J. M.

Farlev-Unit 1 DAE 3/01/82 COMPLETED BY W.c. Iraf rston. III s'

TELEPl!ONE (205) 899-5156 510NT11 Feb run rv. 1987 DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe. Net) g, 17

-0 ~

2 gg. 3 g9

_o_

4 -

20 5 21

-n_

6 22 h'I 7 23.,,,

pa 24 9 25 -

10 26 ~ j 11 27, 12, ;3

_o_

13 29,

i 14 30.

15 33 16 INSTRUCTIONS On this fonnst. list the sverage dady unit power icvelin MWe Net for each d:y in the reporting month. Compute to the nestest whole negswatt.

(91.77)

~

wy e

.,n_s

_.re., mememme-o~me_-

~

s UNITSiluTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-149 UNIT NAME J. M.

Farlev-lhit 1 DATE 3/01/82 REPORTMONTH Februarv, 1982 COMPLETED BY V C.

Mai rston. III TELEPHONE _(205) 899-5156 w.

'5 se E 3*l, c

ri

.2 _e g

sx Licensec Ev

~

g Cause & Corrective No.

Date h

3g j

3s5 Event 5i iN0 n.b" Action to F

$E 5

j 55 g Report a Prevent Recurrence d

001 810910

'F 672 A

3 N/A EB GENERA Continued outage to repair damage to l che main generator which occurred 5eptember 10, 1981.

Re fueling rescheduled to take advantage of forced outage situation.

I I

2 3

4 F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheels for Licensee C-Refueling 3 Automatic Scram.

Event ReporI(LER) FileINUREG-D Regulatosy Rest iction 4-Osher (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5

G-Operational Esrur (Explain)

(9/77) llother (Explain)

Exhibit I Same Souse:

e

'\\

JOSEPH M. FARLEY NUCIE.AR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS FEBRUARY, 1982 The unit continued to be shutdown through the month of February

~

for repair of the main generator at,1 Cycle 3 - Cycle 4 refueling operations.

The following safety-related maintenance was performed in the month of January:

1. Performed miscellaneous maintenance on diesel generators.
2. Replaced pump for radiation monitor R24A.
3. Repaired pressurizer auxiliary spray valve leak.
4. Replaced reactor cavity (Post LOCA) H dilution fan.

2

5. Complete field inspection performed on reactor coolant pumps IA and IB.

~

1 o

\\

OPERATING DATA REPORT DOCKET NO.30-348 DATE 3/01/82 COMPLETED fly W.G. Hairston, III TELEP110NE (?nn 900-5156 OPERATING STATUS Notes 1)

Cumulative data

1. Unit Name:

Joseph M. Farley - Unit 1 since 12/01/77, date of

2. Reporting Period:

February. 1982 c m:nercial operation.

3. Licensed Thermal Power (MWt):

2652 860

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

844.6

7. Maximum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power LeselTo Which Restricted.lf Any (Net MWe):

N/A-

10. Reasons For Restrictions.If Any: N/A This Month Yr to-Date Cumulatise
11. Ilours In Reporting Period 672 1416 37.224
12. Number Of flours Reactor Was Critical 0

0 20.981.8

13. Reactor Resene Shutdown llours 0

0 3.492.0

14. Ilours Generator 0n-Line 0

0 20,329.7

15. Unit Resene Shutdown llours 0

0 0

0 0

50.944.910.5

)

16. Grou Thermal Energy Generated (MWill 17 Gross Electrical Energy Generated (MWil) 0'__,.,

0 16,236.952

18. Net Electrical Energy Generated (MWil)

-12006

-16822 15,206,902

19. Unit Service Factor 00.0 00.0 54.6 00.0 00.0 54.6
20. Unit Availability Factor

-2.2

-1.5 50.8

21. Unit Capacity Factor (Using MDC Net t

-2.2

-1.4 49.3

22. Unit Capacity Factor IUsing DER Net)
23. Unit Forced Outage Rate 100.0 100.0 12.6
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

March, 1982

26. Units in Test Status Irrior to Commercial Operationi:

Forecast Achiesed INITIA L CRITICA LITY 8/06/77 8/09/77 INITI AL ELECTRICITY 8/20/77 8/18/77 COMMEdCI AL OPER ATION 12/01/77 12/01/77 (9/77i L

r DOCKET NO.

50-348 m

g g]NgT J.M. Farlev-Unit 1 DAE 3/01/82 COMPLETED BY W.C. Hairston. III i

HLEPliONE (205) 899-5156 AIONT11 Feb ruarv. 19R2 t

e DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL (htWe-Net)

(51We-Net)

, 17

-0*

2 gg..

3 39

_o_

4' 20 -

3 21 ' '

-n_

6 22.

7 23 ((m~'

3 24 '

9 25

-o_

10 26 -

13 27 -

12. 25,

g3,g 14 '

30 -

gg -

33.

16 INSTRUCDONS On this formst. list the aversge daily unit power Icvelin blWe Net for each d:y in the reporting month. Compute to the nearest whole me5swatt.

~

(9p7}

wJ e'

g

- f e

,O s

I,

-)

UNIT SilUTDOWNS AND POWER REDUC 110NS DOCKET NO.

so-u a UNIT N AME J. M.

Farlev-Unit 1 DATE 3/01/82 REPORTMONng Februarv. 1982 COMPLETED BY W C-Lirston. III TELEPHONE (205) 899-5156 e.

B w

0

.$ g

}

  • Yj Licensee Eg k*t Cause & Currective 3gme Event uT No.

Date 5

E=

$O" Action to r7c j if; g Report #

dE0 Prevent Recurrence d

001 810910

'F 672 A

3 N/A EB GENERA Continued outage to repair damage to the main generator which occurred September 10, 1981.

Re fueling rescheduled to take advantage of forced outage situation.

I l

1 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee i

C Refueling 3-Automatic Scram.

Event ReporI(LER) File (NUREG-D-Regulatory Restiletion 44)ther (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5

G-Operational Error (Explainn Exhibit I-Same Source l

(9/77)

Il 01her (Explain)

)

-