JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS FEBRUARY, 1982 The unit continued to be shutdown through the month of February for repair of the main generator and Cycle 3 - Cycle 4 refueling operations.
The following safety-related maintenance was performed in the I
month of January:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Replaced pump for radiation monitor R24A.
- 3. Repaired pressurizer auxiliary spray valve leak.
- 4. Replaced reactor cavity (Post LOCA) H dilution fan.
2
- 5. Complete field inspection performed on reactor coolant pumps 1A and IB.
i R
t
4 OPERATING DATA REPORT l
DOCKET NO..50-348 DATE 3/01/82 COMPLETED itY W.C. Hairston, III TELEPilONE (9mu Ro4-5156 OPERATING STAlOS
- 1. Unit Name:
Joseph M. Farley - Unit 1 Notes 1)
Cumulative data since 12/01/77, date of
- 2. Reporting Period:
Feb rua ry. 1982 commercial operation.
- 3. Licensed Thermal Power (%IW ):
2652
- 4. Nameplate Ratmg (Gross MWe):
860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maumum Dependable Capacity (Gross MWe):
844.6
- 7. Masimum Dependable Capacity (Net MWe):
803,6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
N/A
- 9. Power Lesel To which Restricted. If Any (Net MWe):
N/A-
- 10. Reasons Fe,r Restrictions. lf Any: N/A lhis Month Yr. to-Date Cumulatise i1. Ilours in Reporting Period 672 1416 37.224
- 12. Number Of floun Reactor Was Critical 0
0 20.981.8
- 13. Reactor Resene Shutdown llours 0
0 3.492.0
- 14. Ilours Generator On.Line 0
0 20,329.7 IS. Unit Resene Shutdown llours 0
0 0
- 16. Gross Thermal Energy Generated (MWil) 0 0
50.944.910.5
- 17. Grow Electrical Energy Generated (MWil) 0'__,,,...
0 16.236.952
- 18. Net Electrical Energy Generated (MWil)
-12006
-16822 15,206,902
- 19. Unit Service Factor 00.0 00.0 54.6
- 20. Unit Availability Factor 00.0 00.0 54.6
- 21. Unit Cagucity Factor (Using MDC Net)
-2.2
-1.5 50.8
- 22. Unit Capacity Factor (Using DER Net)
-2.2
-1.4 49.3
- 23. Umt Forced Outage Rate 100.0 100.0 12.6
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date,and Duration of Exh1:
N/A
- 25. If Shut Down At Fnd Of Report Period. Estimated Date of Startup:
March, 1982
- 26. Units in les Status (Prior to Commercial Operation):
Forecast Achiesed INi flA L CRi flCAll fY 8/06/77 8/09/77 INillAL ELFClRICITY 8/20/77 8/18/77 COMMERCIA L OPER A IlON 12/01/77 12/01/77
- h (9/77) g
_ ~ -
P
~..
' ~
DOCKET NO.
50-348 m,
UNIT J. M.
Farlev-Unit 1 DAE 3/01/82 COMPLETED BY W.c. Iraf rston. III s'
TELEPl!ONE (205) 899-5156 510NT11 Feb run rv. 1987 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe. Net) g, 17
-0 ~
2 gg. 3 g9
_o_
4 -
20 5 21
-n_
6 22 h'I 7 23.,,,
pa 24 9 25 -
10 26 ~ j 11 27, 12, ;3
_o_
13 29,
i 14 30.
15 33 16 INSTRUCTIONS On this fonnst. list the sverage dady unit power icvelin MWe Net for each d:y in the reporting month. Compute to the nestest whole negswatt.
(91.77)
~
wy e
.,n_s
_.re., mememme-o~me_-
~
s UNITSiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-149 UNIT NAME J. M.
Farlev-lhit 1 DATE 3/01/82 REPORTMONTH Februarv, 1982 COMPLETED BY V C.
Mai rston. III TELEPHONE _(205) 899-5156 w.
'5 se E 3*l, c
ri
.2 _e g
sx Licensec Ev
~
g Cause & Corrective No.
Date h
3g j
3s5 Event 5i iN0 n.b" Action to F
$E 5
j 55 g Report a Prevent Recurrence d
001 810910
'F 672 A
3 N/A EB GENERA Continued outage to repair damage to l che main generator which occurred 5eptember 10, 1981.
Re fueling rescheduled to take advantage of forced outage situation.
I I
2 3
4 F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheels for Licensee C-Refueling 3 Automatic Scram.
Event ReporI(LER) FileINUREG-D Regulatosy Rest iction 4-Osher (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Esrur (Explain)
(9/77) llother (Explain)
Exhibit I Same Souse:
e
'\\
JOSEPH M. FARLEY NUCIE.AR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS FEBRUARY, 1982 The unit continued to be shutdown through the month of February
~
for repair of the main generator at,1 Cycle 3 - Cycle 4 refueling operations.
The following safety-related maintenance was performed in the month of January:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Replaced pump for radiation monitor R24A.
- 3. Repaired pressurizer auxiliary spray valve leak.
- 4. Replaced reactor cavity (Post LOCA) H dilution fan.
2
- 5. Complete field inspection performed on reactor coolant pumps IA and IB.
~
1 o
\\
OPERATING DATA REPORT DOCKET NO.30-348 DATE 3/01/82 COMPLETED fly W.G. Hairston, III TELEP110NE (?nn 900-5156 OPERATING STATUS Notes 1)
Cumulative data
- 1. Unit Name:
Joseph M. Farley - Unit 1 since 12/01/77, date of
- 2. Reporting Period:
February. 1982 c m:nercial operation.
- 3. Licensed Thermal Power (MWt):
2652 860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power LeselTo Which Restricted.lf Any (Net MWe):
N/A-
- 10. Reasons For Restrictions.If Any: N/A This Month Yr to-Date Cumulatise
- 11. Ilours In Reporting Period 672 1416 37.224
- 12. Number Of flours Reactor Was Critical 0
0 20.981.8
- 13. Reactor Resene Shutdown llours 0
0 3.492.0
- 14. Ilours Generator 0n-Line 0
0 20,329.7
- 15. Unit Resene Shutdown llours 0
0 0
0 0
50.944.910.5
)
- 16. Grou Thermal Energy Generated (MWill 17 Gross Electrical Energy Generated (MWil) 0'__,.,
0 16,236.952
- 18. Net Electrical Energy Generated (MWil)
-12006
-16822 15,206,902
- 19. Unit Service Factor 00.0 00.0 54.6 00.0 00.0 54.6
- 20. Unit Availability Factor
-2.2
-1.5 50.8
- 21. Unit Capacity Factor (Using MDC Net t
-2.2
-1.4 49.3
- 22. Unit Capacity Factor IUsing DER Net)
- 23. Unit Forced Outage Rate 100.0 100.0 12.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
March, 1982
- 26. Units in Test Status Irrior to Commercial Operationi:
Forecast Achiesed INITIA L CRITICA LITY 8/06/77 8/09/77 INITI AL ELECTRICITY 8/20/77 8/18/77 COMMEdCI AL OPER ATION 12/01/77 12/01/77 (9/77i L
r DOCKET NO.
50-348 m
g g]NgT J.M. Farlev-Unit 1 DAE 3/01/82 COMPLETED BY W.C. Hairston. III i
HLEPliONE (205) 899-5156 AIONT11 Feb ruarv. 19R2 t
e DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (htWe-Net)
(51We-Net)
, 17
-0*
2 gg..
3 39
_o_
4' 20 -
3 21 ' '
-n_
6 22.
7 23 ((m~'
3 24 '
9 25
-o_
10 26 -
13 27 -
12. 25,
g3,g 14 '
30 -
gg -
33.
16 INSTRUCDONS On this formst. list the aversge daily unit power Icvelin blWe Net for each d:y in the reporting month. Compute to the nearest whole me5swatt.
~
(9p7}
wJ e'
g
- f e
,O s
I,
-)
UNIT SilUTDOWNS AND POWER REDUC 110NS DOCKET NO.
so-u a UNIT N AME J. M.
Farlev-Unit 1 DATE 3/01/82 REPORTMONng Februarv. 1982 COMPLETED BY W C-Lirston. III TELEPHONE (205) 899-5156 e.
B w
0
.$ g
}
- Yj Licensee Eg k*t Cause & Currective 3gme Event uT No.
Date 5
E=
$O" Action to r7c j if; g Report #
dE0 Prevent Recurrence d
001 810910
'F 672 A
3 N/A EB GENERA Continued outage to repair damage to the main generator which occurred September 10, 1981.
Re fueling rescheduled to take advantage of forced outage situation.
I l
1 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee i
C Refueling 3-Automatic Scram.
Event ReporI(LER) File (NUREG-D-Regulatory Restiletion 44)ther (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explainn Exhibit I-Same Source l
(9/77)
Il 01her (Explain)
)
-