OPERATING DATA REPORT DOCKET NO.
50-263______
DATE 3-2-02____
COMPLETED BY A. L. Hyrabo TELEPHONE 612/295-5151 OPERATING STATUS l Notes i
- 1. Unit Name : ________________________Honticello l
l
- 2. Reporting period:
___________________FEDRUARY l
l-
- 3. Licensed Thermal Power (HWt):
____________1670 l
l
- 4. Namentate Rating (Gross HWe):
_____________569 l
l 5.
Design Electrical Rating (Net HWe):
_____545.4 l
l.
- 6. Maximum Dependabte Capacif;y (Gross NWe): __553 l
l
- 7. Maximum Dependabte Capacity (Net HWe):
____525 l__________________________l 0.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
__N/A_____________________________________________
- 9. Power Level To Which Restricted, If Any (Het NWe)-
___N/A___________________
- 10. Reasons For Restrictions, If Any:
__N/A_________________________________
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_____672
_____1416
____ 93505
~ 12. Number Of Hours Reactor War Critical
___672.0
___1066.3
__ 76001.9
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line
___672.0
___1015.7
__ 74225.4
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0 16.-Gross Thermal Energy Generated (HWH)
_1090704
_ 1617365
_121299707
- 17. Gross Electric &L Energy Generated (HWH) __367377
__ 544019
__30549396
- 10. Het Electrical Energy Generated (HWH)
.__3536U5
__ 521693
__360649t2
- 19. Unit Service Factor
__100.0%
___ 71.7%
____ 79.4%
- 20. Unit Availability Factor
__100.0%
___ 71.7%.
____ 79.4%'
- 21. Unit Capacity Factor (Using HDC Net)
__100.2%
___ 70.2%
____ 75.1%
- 22. Unit Capacity Factor (Using DER Net)
__ 98.5%
___ 69.0%
____ 73.0%
- 23. Unit Forced Outage Rate 0.0%
i.7%
6.1%'
- 24. Shutdowns Scheduled Over Next 12 Honths (Type, Date, and Duration of Each)
__ September 4, 1982 - Refueling Outage - 42 days ________________________
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:___N/A______
- 26. Units In Test Status (Prior to Commerc ia l Opera t ion): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 140 920312 ff OWh
'R i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263______
UNIT Monticello__
DATE 3-2-82____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i
__________537____________
17
__________543____________
2
__________530____________
18
__________542____________
3
__________526____________
19
__________542____________
4
__________523____________
20
__________543____________
5
__________523____________
21
__________518____________
6
__________524____________
22
__________543____________
7
__________522____________
23
__________543____________
8
__________526____________
24
__________542____________
25
__________543____________
i 10
__________529____________
26
__________540____________
l l
11
__________533____________
27
__________544____________
r 1
12
__________528____________
28
__________521____________
l 13
__________377____________
29 14
__________485____________
30 l
15
__________536____________
31 I
16
__________543____________
I l
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 3-2-82____
COMPLETED BY A.
l..
Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______
2-1-02 to Power operation.
2-12-82 2-13-82 Power reduced to minimum recirc flow to perform rod pattern setuence exchange.
2-14-82 to Power operation.
2-20-82 I
(
i Note: Power opera t ion defined as essent ia lly 100% of rated power except for weekend load drops for specified surveillance testing.
50-263 UNIT SliUIDOhNS AND POWER REDUCTIONS DOCKET NO.
3 "81C"110 UNIT N AME DATE 3-2-82 REPORT MON f!I FEBRUARY COMPLETED BY A. Mvrabo TELEPHONE 612/295-5151 T
f=3 h
[
Lip'"'e '
5 ~,
"L Cause & Corre ine U^
faent
- 3 5
4i5 17 p,7 3,,,oy, o Repitre _
z~
CC 2
37 3_
.]
- Present Recurrense j
1 Perforra control rod sequence exchangeJ 3
2-13-82 S
0.0 11 4
N/A ZZZZ ZZZZZZ 1
1 2
3 4
F. Forsed Reason.
MethoJ :
Edubit C - Instructions S Schedu!ed A Equipment Failure t Esp:aint
!-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatie Strain.
Event Report ILER) File tNL'RtG-D Re;;ulatory Restriction 4-Ot her ( E xplain )
0161l E Operator Training & License Ewinination F-Ad rninist ra ti.e 5
G Operational Error (Explain:
Esinbit i Saine Source (9/77) li.0:her ( E xplain I