OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 3-2-02____

COMPLETED BY A. L. Hyrabo TELEPHONE 612/295-5151 OPERATING STATUS l Notes i

1. Unit Name : ________________________Honticello l

l

2. Reporting period:

___________________FEDRUARY l

l-

3. Licensed Thermal Power (HWt):

____________1670 l

l

4. Namentate Rating (Gross HWe):

_____________569 l

l 5.

Design Electrical Rating (Net HWe):

_____545.4 l

l.

6. Maximum Dependabte Capacif;y (Gross NWe): __553 l

l

7. Maximum Dependabte Capacity (Net HWe):

____525 l__________________________l 0.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

__N/A_____________________________________________

9. Power Level To Which Restricted, If Any (Het NWe)-

___N/A___________________

10. Reasons For Restrictions, If Any:

__N/A_________________________________

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

_____672

_____1416

____ 93505

~ 12. Number Of Hours Reactor War Critical

___672.0

___1066.3

__ 76001.9

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line

___672.0

___1015.7

__ 74225.4

15. Unit Reserve Shutdown Hours

_____0.0

______0.0

_______0.0 16.-Gross Thermal Energy Generated (HWH)

_1090704

_ 1617365

_121299707

17. Gross Electric &L Energy Generated (HWH) __367377

__ 544019

__30549396

10. Het Electrical Energy Generated (HWH)

.__3536U5

__ 521693

__360649t2

19. Unit Service Factor

__100.0%

___ 71.7%

____ 79.4%

20. Unit Availability Factor

__100.0%

___ 71.7%.

____ 79.4%'

21. Unit Capacity Factor (Using HDC Net)

__100.2%

___ 70.2%

____ 75.1%

22. Unit Capacity Factor (Using DER Net)

__ 98.5%

___ 69.0%

____ 73.0%

23. Unit Forced Outage Rate 0.0%

i.7%

6.1%'

24. Shutdowns Scheduled Over Next 12 Honths (Type, Date, and Duration of Each)

__ September 4, 1982 - Refueling Outage - 42 days ________________________

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:___N/A______
26. Units In Test Status (Prior to Commerc ia l Opera t ion): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 140 920312 ff OWh

'R i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263______

UNIT Monticello__

DATE 3-2-82____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i

__________537____________

17

__________543____________

2

__________530____________

18

__________542____________

3

__________526____________

19

__________542____________

4

__________523____________

20

__________543____________

5

__________523____________

21

__________518____________

6

__________524____________

22

__________543____________

7

__________522____________

23

__________543____________

8

__________526____________

24

__________542____________

25

__________543____________

i 10

__________529____________

26

__________540____________

l l

11

__________533____________

27

__________544____________

r 1

12

__________528____________

28

__________521____________

l 13

__________377____________

29 14

__________485____________

30 l

15

__________536____________

31 I

16

__________543____________

I l

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 3-2-82____

COMPLETED BY A.

l..

Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______

2-1-02 to Power operation.

2-12-82 2-13-82 Power reduced to minimum recirc flow to perform rod pattern setuence exchange.

2-14-82 to Power operation.

2-20-82 I

(

i Note: Power opera t ion defined as essent ia lly 100% of rated power except for weekend load drops for specified surveillance testing.

50-263 UNIT SliUIDOhNS AND POWER REDUCTIONS DOCKET NO.

3 "81C"110 UNIT N AME DATE 3-2-82 REPORT MON f!I FEBRUARY COMPLETED BY A. Mvrabo TELEPHONE 612/295-5151 T

f=3 h

[

Lip'"'e '

5 ~,

"L Cause & Corre ine U^

faent

3 5

4i5 17 p,7 3,,,oy, o Repitre _

z~

CC 2

37 3_

.]

  • Present Recurrense j

1 Perforra control rod sequence exchangeJ 3

2-13-82 S

0.0 11 4

N/A ZZZZ ZZZZZZ 1

1 2

3 4

F. Forsed Reason.

MethoJ :

Edubit C - Instructions S Schedu!ed A Equipment Failure t Esp:aint

!-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatie Strain.

Event Report ILER) File tNL'RtG-D Re;;ulatory Restriction 4-Ot her ( E xplain )

0161l E Operator Training & License Ewinination F-Ad rninist ra ti.e 5

G Operational Error (Explain:

Esinbit i Saine Source (9/77) li.0:her ( E xplain I