e-AVERAGE DAILY UNIT FChE E.7.L DOCKET NO. 50-311 UNIT salem No. 2 DATE March 10, 1982 CCNPLETED BY L.
K. Miller TELEPHONE 609-541-5900X507 MONlli February 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0ha EEL GWe-NET)
@BE-NET) 1 1,07) 17 1,119 2
1,073 18 1,134 3
1,154 19 752 4
1,050 20 502
,1 il 5
1,069 21 989 6
1,072 22 1,100 7
1,046 23 1,089 8
1,085 24 1,117 9
1,099 25 1,089 10 1,096 26 1,138
^
11 1,096 27 1,068 l
12 1,109 28 1,081 13 1,080
'9 14 1,119 30 15 1,108 31 i
16 1,107 l
Pg. 2 of 12 8.1-7. PJ.
r,203160069 820310 PDR ADOCK 05000311 R
e CFDATDC CAM IUPGC Doc m to.: 50-311 Dan :
March 10, 1982 Cnemn sy:
L. K. Miller MIDHmz: 609-541-5900X507 CypArnc 7:Mus A.
Unit Natus Sa1em No. 2 Notas:
3.
Reportirq Period February 1982 3.
Liounsed 2ar =1 Power Otit):
3411 4.
Nasuplate Ratirn (Gross fede):
1162 5.
Design U " m1 Ratirq (Not !tde):
1115 teav4== Dupendable spar-4ty ICms !tde):
1149 6.
r 7.
Paav4== Dupendable Capacity (Not ado):
1106 8.
Zf C)anges Occur in Capacity Ratirgs (Itman Nunter 3 S. rough 7) Since Iast Report, Give Reason:
None 9.
Power Imel Ib lt:1 cts Restricted, If Any (Not P9de):
None
- 10. Raascms For Restrictions, If Any N/A mis Ptmth Year to Data m eilative 672 1,416 3,337
- 12. taneer of Hours anactor was critical 668 1,412 3,271.3
- 13. Reactor Reserve Shut & wn Hours 0
0 0
H.
Hours Generator On-Line 666.1 1,405.8 3,223.5
- 15. Unit Reserve Shutdown Houra 0
0 0
- 16. Gross 2=r==1 Diergy Generated (.wn 2,182,846 4,421,816 9,529,835
- 17. Gross Electncal niergy Generatad(mi) 738,370 1,481,950 3,190,820
- 18. Not r.loctrit:a1 Energy Generatad0te) 710,686 1,424,583 3,056,650 l
- 19. Unit Servia ractor 99.1 99.3 96.6
- 30. anit Av=41-hi14ty Factor 99.1 99.3 96.6
- 21. 3dt capacity Factor (Usirn !<r Net) 95.6 91.0 82.8
- 22. Unit capacity ractor (Using DG Net) 94.8 90.2 82.2
- 23. Unit Torood Outage Rate
.9
.7 3.4
- 24. $hutzlowns S@adulad Over Next 6 femths (Type, Date, and Duration of Eacts):
None i
- 25. Zf Shut Down At End of Report Period,, Estimated Date of Starttp N/A
- 26. Units In Test Status (Prior to Cmunarcial Operation):
Icrecast Achie'ad INITIAL CR m CAL m 06/30/80 08/02/80 INMAL EI2ETRIcm 09/01/80 06/03/81 6-1-7.R2 Pg. 3 of 12 CD9GCIAL OPDATIm 09/24/81 10/13/81
/
tNIT rammxwas no toest sencrICNi DOCKET NO.:
50--311 sexoser nimi February 1982 t;mIT*NAnza Salem No. 2 DATE:
March 10, 1982 COMPI.ETED BY L. K. Miller TEt.Erasons: 609-541-5900X507 mmte or IURATICH GRHTIDC IJGPEE SY GDSOENT CMEIE NO NM so.
Ents Tyrs (irm)
M m
m Unm5 ACrICH 5)
I mactost aposer g PfuMNr DIDMetM3 82-056 1-24 F
0.0 A
4 HB ANNUNC High Steam Flow Alarms82-060 2-04 F
0.0 A
5 EA CKTBRK Crane Operator Caused Arc on 5015 Line Causing 5015 Line Breakers To Trip 82-062 2-08 F
0.0 A
5 HB ANNUNC High Steam Flow Alarms82-064 2-10 F
0.0 A
5 HF FILTER High Differential Pressure Circulating Water Traveling Screens Due To River Grass82-066 2-12 F
0.0 A
5 HH PUMPXX Low Suetion Pressure Steam Generator Feed Pump 82-068 2-12 F
0.0 A
5 HH PUMPXX Low Suction Pressure Steam Generator Feed Pump 1
2 3
4 5
F: Forced steason:
phthods Exhibit G - Instnactione g " bit 1-Sase si Sdueduled A-Rpipment Failure (Emplain) 1-Manual for Preparation of Data s-Maintenance or het Ehtry Sheets for Lloensee 2-Manual Scram.
Event pecortti a l File e-pefueling p-pegulatory poetricti m 3-Automatic Scram.
teamun-0161) a-operator Training a License nummination 4-Continuation of r-hhanistrative Previous Outage croperational ErrortSuplaint n-other (Belain) 5-Load Reduction 9-Other page 4 of 12
tml? samnes me roem macrians Docast iso.: 50-311 peroser mma February 1982 usert osane, Salen No. 2 l
Dats March 10, 1982 conPLETro at L. K. Miller Tet.gresong: 609-541-5900X507 l
ee:nnn w
taMRTIGE SENTIW.
LICEDGE ODEOWfr OREE NO GIf5WCrIVE eso.
twrt TrPE helms)
IW M D4 tool EVptr OEg5 acrgge go meson m u er s esevewr suousseux e
82-070 2-16 F
0.0 A
5 HA INSTRU 23 Governor Valve Swinging Due To Low Voltage Differential Transformer Electrical Spikes82-072 2-19 F
5.9 A
3 ED GENERA 22 Essential Controls Invertor Failed Causing Steam Generator Feed Pump Trip 82-074 2-22 F
0.0 A
5 HC PUMPXX Loss Of Vacuum Pump Seal Water Causing Condenser Back Pressure Creating Vacuum Loss On Turbine 82-076 2-25 F
0.0 A
5 HF FILTER 21B Circulator Out Of Service For Cleaning 82-078 2-26 F
0.0 A
5 HF FILTER 21A Circulator Tripped Due To High Differential Pressure On Screen 82-080 2-26 F
0.0 A
5 HF FILTER 21B Circulator Tripped Due To High Differential Pressure On Screen 82-082 2-26 F
0.0 A
5 HF FILTER 21B Circulator Tripped Due To High Differential Pressure On Screen 82-084 2-27 F
0.0 A
5 HF FILTER 21B Circulator Tripped Due To High Differential Pressure On Screen rage 5 of 12 s-1-7.nl
1 7
0 2
5 8
X 9
r 0
2 1
e 0
h h
l 9
g g
l 5
i i
o 0
i H n H n N
1 M
1 e
e 1
4 oe oe 1
m h
5 T r Tr 3
e c
K E
c c
l r
9 v
eS eS 2
i 0
a a
0 r
u u
e 5
S M
L 6
c g
D n D n E
E O
O W
W N 0s d
d s
1 l ee ee
- : Y E U
E pr pr
.o E E B N 4
w M T O
OGN pu pu I
i s is A A D n NTr rs rs T M D E e C 3 T e Te f
T e EA s
M r
r T
E L S
acI L E e
rP rP R
o N P T N
f o
o D U M
C P
t l tl o
aa aa C
l i li ut ut c n cn re re i r ir C e C e f
f Af Bf 1i 1i 2D 2D r
ettS R
R E
oI E
E 2
T T
8 9
MG L
L 1
I I
G s
F F
tc yr as a
m u F
F r
m b H
H e e oF s
E 8
e m Et s
M f r a
3nr s M Ovo Es e
I s r L
e or m
u ms a u C
s s
n t
P s
8 I
o T
rT 0r a
0 mon 0r I
M m
A 5
5 e
S I
f A
A EG)
IS TR 0
0 N(O U
0 0
I I
I E PY F
F T
2 1
fo E
7 7
6l M
2 2
R.
D 7
2 2
g1a-r8 6
8 8
8 0
0
.0 8
2 2
8 8
DOCKET NO3 50-311 MAJOR PLANT MODIFICATIONS WIT NW:
Salem 2 REPORT MONTH FEBRUARY 1982 DATE:
March 10, 1982.
COMPLETED-BY:
L.
K. Miller TELEPHONE:
609-541-5900X507
- DCR NO.
PRINCIPLE SYSTEM SUBJECT 2ET-1364 Steam Generator Perform steam genertitor moisture carry-over measurements 1
j l,
O l
l 1
l 4
O
- DESIGN CHANGE REQUEST 8-1-7.R1 Page 7 of 12 e
--r-9-m w---
,.w-n, e- - - =
e.
--m-e-,
f DOCKET NO.:
50-311 MAJOR PLANT MODIFICATIONS UNIT NAME:
salem No. 2 REPORT MONTH February 1982 JATE:
March 10, 1982 COMPLETED BY:
L. K. Miller TELEPHONE:
609-541-5900X507
- DCR NO.
10CFR50.59 SAFETY EVALUATION 2ET-1364 This DCR does not affect the safe shutdown of the reactor plant and a change to the technical specification or SAR is not required.
1
- DESIGN CHANGE REQUEST Page 8 of 12
[
t j
b b
90)fFD Ry qaLFM GFNFkaffAn 91aff0N DalF 09/09/AD nEDa#T"EMT, 400K OOnFR Nn.
Satrfv o[taTFn rouleurs? woog poorw LOG - It'ITT 7 PaGF On01 WOWE nRnER NU"RER nEpf EOUTP*ENT InEMitFTCaffnu rupt amat tog r.F nnpw PE*FnRwEn s
CCA0ml u
avv DCP Re:S nESC#1pTTnN nF PenmLFM, PEOFnRw f/n 706597 CnRRECTivF arTInN, aLL "U9E9 Da93Fn TFST C87C70 M
VALVE,274MIA8 nE*CDISTTOM OF PDnatrM, TE"PnRauf RFPafR T/ VALVE,2*MM168 CnROECTTyr ar. finn, parnfwG a R04Nrf SFatEn RT FifRMANITE (8'213 w
VALVE.23M91AT nE9ColpTT04 nF Po RLFM, MYnpayLIr STS V/s.0w nN OTL n
CnapFCTfvF arTION, OEFILL 4 RFPIarE SfGMT Gl. 4 95 j
C8 2A8 4
COMPRFSM00,724 97ARTIwG afe l
OESC#IpTf0N nF po nLFM, "0709 RUDNFD n
CP7#ECTivr acting, orplaCFD COMPRFS900 WOT08 C26tof o
Nn.7I S/G FOwfR F104 CONTout nE9t#1pTT04 nF pon*LFM, CON T ont PRDRLEMS, 9/C FDwip FLnw CnHDErityr art!ny, oEPL #FLaf Fr510a. SpIMING STOOPFD C;soTI p
Nn.3 oRIMARY WTD TNK nE9CDIPTinM OF PanRLFM, IEvFL TNntrafinN F907EN CnpoErftvF ACTION, Thaw LINF/ WFPtArE LAGGING C37318 p
Cngfunt unD wf THn#aWal iIWIT "E9CDI*Tinn nr po pLFM, LHMS or POSIf tvE Mn0FWaTnd CnEFFTCTENT n
CnHOFrTivr arYIn*a, rHe 90n w!THnWannt LfMit Page 9 of 12
COWTFD Ry SatrM nr%FusTThC 9TaTTON DalF 01/ng/gp DE#ADTuENT, WO*w O'DFR Nn.
34FFTv OFIATFn r stipur%T wpog gjotir g LOG. tlMIT p PaGF onnD u
w0#2 ORnED NUwere NEST E ntlT P"E NT InENTTFTCATTn" FIPLANATTOW nF nneu DEspnR*Fn C84254 NTS N95 DFCnRnER nEMC#IPTTON OF PDnplFM, PENS 1 4/#EADTNG PROPFRLT CARDEPTTvF arTInN, WOVE CaRLE Bt'NnLF 4 #EC AI C8%518 9
RnD CnNTRnl SYS nESC*IPTTON OF P#n#LFM, 90n ItRCENT FaILU#E AtAe4 CnRgECTTyr ArTION, DE*LACF FilSt/CTRCUTT BnAoD CR;5%3 p
RMS CH2941A nEMC#IpTTON OF PUnRLFM, WILL N/ SCAN. PitMP DUT OF SPEr.
CnRoECTTvF arTInN, oEPL RaTTERIFS. Fil*CTInNat TFST SAT CC1366 21 *G FFEn FLnn DEMC#IPTT04 tiF PDnRLrM, OHaNNFt. DUT OF SPEC.
C"R#ErTTvF arTION,
- EPLACFD Sn NT MnDitLF, 2FM9108 CC11AR p
guS STS CHANNFL 2OI1A
'l BE9ColpTT04 DF pen trM.
OEMPMN9E nHT nr *PFC.
e d
Cn##ErTTvr arfinN, DErai/pF9ET nItC#IMINAT0o vnt TacF QQ1bE9 p
RuS CHANNFL 2016 nggColpTT04 DF POnRLFM, BETEtine nati nF 9PFC Cn8DFrffvF ArTION, EFPL COY 9 fat, pH TilBr 4 oECALImp4TF 9C4T03 p
Op. OFLTA T Lnno p1 DE*CDIPTTnM OF PpnRLFW, AP DFLTA T FAIIEn WICH, innP 21 CoppFrTTyr ACTION, OFpt c apar t isjo%/ ras.IngaTr ATwS12F
- l l
TOTAL LIwE9
- Oinnep i
TOTAL 4-DEPS = onente t
LAST UPDaTr cansn9 12%700 Page 10 of 12 I
f' 3
s'
,Y e
r
./
/ i
- SALEM UNIT 2 OPERATING
SUMMARY
REPORT f,'t FEBRUARY 1982 1
R
+
2-04-82
,- 1600
. Reducing load due to loss of transmission t
'line.
Load increased to normal with line back in service.
f v
2-06-82 0030 Reducing load to 92% RTP for turbine valve test.
2-07-82 1635 Collected state point data to monitor I
high steam flow condition.
2-12-83
%2030,.
Low feed pump suction pressure.
Power
,f.
\\
reduced from %100% to %98%..
4
- p. e 2-13-82 0200 Power
- reduced to %93% for turbine over-
/
speed test.
r
r.
s, 2-16-82
'N0900 Power reduced to N95% due to fluctuation of governor valve on main turbine.
Problem corrected and power increased to
%100% by 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.,
2-19-82 Rx trip at 1624, hours due to failure of inverter power supply'ho feed pump.
> Reactor #critica'l at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />.
Unit Ion ling at 2217.
\\
c 2-22-82 Reduce ^d' power at %1500 hours to 85%'due to loss of condenser vacuum.
(Loss'of
' vacuum pump seal).
Back up to 100%
power by %2100 hours.
2-26-82
%0500 hours power reduced to %90% due to loss of'circulatoy screen.
Power back f.
to~N100% by 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />..
>2-2 7-82._
NPower red' iced to %80% and later 70%, due
[
to loss of circulating water.
Circulating s
(.
water screens clogged with grass.
~
~~' '
2228-82 Power at 100%.
'9 N
\\
'*m i
(.
- [ -
,j',
s
~,
,s 3'
age 11 of ?2
)
- e8
REFUELING INFORMATION DOCKET NO.:
50-311 UNIT:
Salem No. 2 DATE:
March 10, 1982 COMPLETED BY:
L.
K.
Miller TET.EPHONE : 609-541-5900X507 MONTH:
February 1982 1.
Refueling information has changed from last month:
YES X
NO 2.
Scheduled date of next refueling:
January 22, 1983 3.
Scheduled date for restart following refueling:
Anril 24, 1993 4.
A.
Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO-DATE February 1982 B.
Has the reload fuel design been reviewed by the StatAon Operating Review Committee?
YES NO X
If no, when is it scheduled?
December 1982 5.
Scheduled date(s) for submitting proposed licensing action:
December 1982 (If Required) 6.
Important licensing censiderations associated with refueling:
7.
Number of Fuel Assemblies:
A.
In-Core 193 0
B.
In Spent Fuel Storage 8.
Present licensed spent fuel storage capacity:
1170 Future spent fuel storage capacity:
1170 9.
Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
March 2000 Page 12 of 12 8-1-7.R4
-