ML20041E775
| ML20041E775 | |
| Person / Time | |
|---|---|
| Site: | 05000375, 05000147, Vanowen |
| Issue date: | 02/11/1982 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20041E772 | List: |
| References | |
| NUDOCS 8203110409 | |
| Download: ML20041E775 (2) | |
Text
y uc,o o
UNITED STATES 8 N#
NUCLEAR REGULATORV COMMISSION a,E WASHINGTON D. C. 20555 l
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
~
SUPPORTING ORDER TERMINATING FACILITY LICENSE NO. R-40 ROCKWELL INTERNATIONAL L-77 RESEARCH REACTOR DOCKET N0. 50-94 By application dated January 28, 1976 a's supplemented March 2,1976 and January 6,1982, Rockwell International (the licensee) requested that Facility License No. R-40 be terminated following completion of dismantling the L-77 Reactor.
The reactor 'has-been dismantled and disposed of in accordance with the licensee's dismantling plan dated January 28, 1976 and 'sr dismantling order dated September 29, 1976. The Nuclear Regulatory Commission's Office of Inspection and Enforcement inspec+ed the facility on January-22, 1982, and verified that dismantling had een accomplished in accord-ance with the dismantling order. Also, our inspector conducted a radi-ation survey of the reactor facility and determined that the facility
' met the contamination limits stated in the Dismantling Plan and in Reg-ulatory Guide 1.86.
In addition, our inspector determined that gamma radiation was at background levels.in the facility.
The L-77 fuel has been sold and shipped to an authorized receiver in West Germany in accord" ance with NRC export license conditions.
We have concluded that the termination of this license involves an action, which is, insignificant from the standpoint of environmental impact, and pursuant to 10 CFR 551.5(d)(4), that an environmental impact statement or negative and environmental impact appraisal need not be prepared in connection with the issuance of this termination order.
Based on the reasons discussed above, we have concluded that this license termination is in compliance with the Commission's regulations, that there is reasonable assurance that this license can be terminated without en-dangering the health and safety of the public and that its terminaticn will not be inimical to the common defense and security or to the health and safety of the public.
Da ted :
FEB 11 1992 8203110409 820211 PDR ADOCK 05000094 p
- (pa K84g Jg UNITED STATES NUCLEAR REGULATORY COMMISSION e
n
, h,I WASHINGTON, D. C. 20555 e
t
\\...../
' i Docket Nos. 50-94 50-147 50-375 i
AMENDMENT TO INDEMNITY AGREEMENT N0. B-13 AMENDMENT NO. 18 FEB 1 11982 ', Indemnity Agreement No. B-13, between Effective Rockwell International Corporation, and the Atomic Energy Commission, dated March 26, 1962, as amended is hereby further amended as follows:
Item 3 of the Attachment to the indemnity agreement is deleted in its' entirety and the following substituted therefor:
Iten 3 - License number or numbers R-19 (From 12:01 a.m., September 26,1957 to 12:00 midnight, June 30, 1958, inclusive).
R-40 (From 12:01 a.m., May 17,1958 to 12:00 midnight, FEB 101982, incatrsive)
~
~
~ CX-17 (From 12:01 a.m., October 3,1960, to 12:00 midnight, October 1,1980, inclusive)
R-ll8 (From 12:01 a.m., January 5,1972)
FOR THE UNITED STATE'S NUCLEAR REGULATORY COMMISSION
\\
_M YMr5>
LSy
~~
Jerome Saltzman, Assi ant Director State and Licensee Relations Office of State Pro' grams Accepted 1982 By ROCKWELL INTERNATIONAL CORPORATION e
e
_ --