Expresses Concern Re Heat Exchanger Tubes at Ginna.Suggests Complete Replacement of Heat Exchanger at Time of Annual Core Refueling Shutdown at Ginna & Zion Facilities
ML20041E553
Person / Time
Site: Ginna, Zion, 05000000
Issue date: 01/27/1982
From: Dumelle J
ILLINOIS, STATE OF
To: Palladino N
NRC COMMISSION (OCM)
Shared Package
ML20041E546 List:
References
NUDOCS 8203110071
Download: ML20041E553 (1)


Text

.--

7,.,,

'{0g y,.

STATE OF ILLINOIS JACOB D. DUMELLE, cH AlHMAN OIETION CONTitOI. BOAl(D 9Ax S$$,",^LEiNO,S OAK PARK, ILLINOIS DONALD ANDEISON p

CHICAGO, ILLINOIS 60006 CHIC AGO, ILLINOIS TELEPHONE JOAN G, ANDERSON 31'b793 3620 WESTERN SPRINGS, ILLINOIS J'

January 27, 1982 Mr. Nunzio Palladino, Chairman U.S. Nuclear Regulatory Commission Washington, D.C.

20555 e

Dear Chairman Palladino:

I watched uith interest your thorough responses on the "McNeil-Lehrer Report" on January 26 about the January 25 Ginna Plant venting of radioactive steam.

1 The Ginna Plant dates from 1969.

Illinois has the Zion Plant which is a PWR and dates from 1973 and 1974.

Since the heat exchanger tubes at Ginna are corroding, does this mean that similar failures will occur at Zion in four or five years when these two reactors are also 13 years old?

The newspaper reports put the cost of the Ginna Plant shut down at $100,000,000.

Is this correct?

If it is, then would it not'make sense to completely replace the heat exchanger every, say 10 years, at the time of the annual core refueling shutdown?

l If this were done, the public would not be exposed to even small amounts of radiation and would not become alarmed.

And the ratepayers would not have to pay the $100,000,000.

In summary, if in fact the heat exchanger corrosion rates l

are faster than expected by the designer, then a preventative replacement of the heat exchanger twice during the plant life 1

(at 10 years and at 20 years) seems to make economic and public health sense.

I commend that suggestion to your Commission.

4 R Sincerel,

/

I Jacob D.

Dumelle, P.E.

i Chairman JDD:tw 8203110071 820223 PDR COMMS NRCC l

CORRESPONDENCE PDR i

s n-82-82

%_ _gdQM.

2/3/82

,, g,,,

/

NRC SECRE TARIAT TO: O comm.ss.oner oaie 0 % mec. Dir10per.

O cen. counsei O cong Lianon O soie ior O Pubi.c Affairs O secretary

~

a

' O Inspector & Auditor O eoisev ev.iost on Jacob D. Dumelle, P.E.

Voilution tontrol tsoara dtate or 11linois Palladino g,,,1/27/82 4 7,;

suggestion to repst replace trTheat su exchanae%ecI:n Ginna as well as Zion every 10 vears during r

the time of the annual core refuelino shutdown Prepare reply for segnature of:

Chairman O comm.o..ner O Eoo.'cC. CL. SOL, PA SECY, I A. PE O Sipture block omitted O

O Return original of incoming with response XXXW ror direct roply.

-Suspense:

Feb 26 For appropriate action O ror informai.on R r:'a aff. Eco nu......a.it'ga Ti m A*

..p p......

Remark s:

biiije champ For the commission Send three (3) copies of reply to Secy Corresponrience and Records Branch macs 2 ACTION SLIP

e$

~.

e.

]

s l'

lh

~

T F

W T

~

t 7

[

ACTION CONTIOL DATES CONTROL NO FROM:

2/%f7 11467 EM JACCb D. Cdt3lle compt. DE ADU NE Pollutton C?ntrol Eoard ACKNOWLE DG MENT DATE OF DOCUMENT Stata of Illin3{$

lNTERIM REPLY jffff,y f0 PREPARE FOR SIGNATURE be41F,443 Falladjr.G FINAL REPLY

f. jj-CHAIRMAN FILE LOCATIOf4 0 ExtcuTIVE OlRECTOR

,g OTHERt N=63-DESCRIPTION

$ LETTER OMEMO O REPORT O OTHER SPECI AL INSTRUCTIONS OR REMARKS Concern since heat exchanger tubes at Ginrta are corrodf ag wii) stesilar failures occur ct Zion, & su92csts co:r;>1etc replacesent Cf Mat exchanger at tiraa or ar:nual core refactino shutrJon CLASSIFIED DATA DOCUMEN T/ COPY NO.

CLASSIFICATION l NUMBER OF PAGES

-'AT EGOR Y g

g us1 AL REcisTRY NO.

O Nsl O Ro O rRo

" SIGNED TO:

DATE INFORP1ATION ROUTING LEGAL HEVIEW G FINAL U COPY AS$1GNED TO DATE N

E L OBJECTIONS pp,4m Op pf j f_tgp ggg 418w.bd 2/5/ p Cunninghan. CLD 3-111ttson 7-Snyde r0 EoO AoMiN a COnREs on j

CESC/Denton

[4 VDI TMP

EXT, J,Q W. ". /,

y c- -

w-n, COMMENTS, NOTIFY:

9 g,-

j jf ppy im 2

4, m a.

_ ext-2.

ligngppy JCAE WOIIFICATION RECOMMENDED:

O YES O No o

i NitC FORM 232 EXECUTIVE DIRECTOR FOR OPERATIONS DO NOT REMOVE TH/S COPV g

PRINCIPAL CORRESPONDENCE CONTROL

9 6

9 cl.?,

.~ m r*

~~

~

V F.'

l

"z

<A.

.,e:

^.

STATE OF I LU NOI S r (e.J{~R *b-r!,tw

- W T^

?

teg 3, <

g.

,, -. = -,-%

v>

j%%

POLLUTION CONTROL BOARD FN.:..

..~~a..

309 WEST WASHINGTON STREET k.'.e

.W~

.i

~N s

w.-

SU4TE 300 N.

~

CmcAco. Itusois 60606 Mr. Nunzio Palladino, Chairman U.S. Nuclear Regulatory Commission Washington, D.C.

20555 i

. ~,,

.Mm~

... ~

---..-.,-...,,,.,.,--,.e-

-a-,

~

= -

e b-

' + " *-- -- --

(9 b