ML20041E446

From kanterella
Jump to navigation Jump to search
Notice of Violation for Failure to Comply w/820201 Deadline for Establishing Prompt Public Notification Sys
ML20041E446
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/12/1982
From: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
Shared Package
ML20041E440 List:
References
EA-82-031, EA-82-31, NUDOCS 8203100532
Download: ML20041E446 (1)


Text

.

NOTICE OF VIOLATION Connecticut Yankee Atomic Power Company Docket No. 50-213

.Haddam Neck Nuclear Power Station EA 82-31 As a result of information submitted by the licensee, the following violation, categorized in accordance with the Interim-Enforcement Policy (45 FR 66754, October 7,1980), was identified:

10 CFR 50.54(s) and Appendix E to 10 CFR Part 50 (46 FR 63032, December 30, 1981) require each r.uclear power reactor licensee, by February 1,1982, to demonstrate that administrative and physical means have been established for alerting and providing prompt instructions to the public within the plume exposure patnway emergency planning zone.

Contrary to the above, by letter dated January 18, 1982 the licensee notified the NRC that it would not be able to demonstrate by February 1, 1982 that administrative and physical means had been established for alerting and promptly providing public instruction within the plume exposure pathway emergency planning zone for the Haddam Neck Nuclear Power Station.

This is a Severity Level III violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, Connecticut Yankee Atomic Power Company is hereby required to submit to this office within five days of the.

date of completion of the installation and initial testing of the prompt public notification system or 30 days after the date of this Notice of Violation,-

whichever is later, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2).the reasons for the violation and (3) the date when full compliance was achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amendnd, 42 U.S.C. 2232, this response shall be submitted under oath or affirmation.

FCyTHENUCLEARREGULATORYC M SSION 1 6 m e l k,,0 $ttcjfu t

Ric hard C. DeYoung, Direcjor Dated at Bethesda, Maryland this ist day of February 1982 8203100532 820212 PDR ADOCK 05000213 G

PDR

.