ML20041E198

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1982
ML20041E198
Person / Time
Site: Fort Saint Vrain 
Issue date: 03/05/1982
From: Mcbride L
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20041E196 List:
References
NUDOCS 8203100239
Download: ML20041E198 (1)


Text

.

  • 10NTHLY OPERATING INFORF.ATIO'1 DISTRIB LTION Nuter of Gmies

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - h

( O r i gin a l o f P le t t e r)

Director Of fice of Inspection and Enf orcecent U. S. Nuclear Regulatory Commission Washin gton, D. C.

20555 M r. John T. Co lli na - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Ietter) h gion IV s!. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 2

(P Letter)

Di re c to r Of fice of Managewnt Information and Program Control tl. S. Nuclear Re gulatory Gammission.

Washin gton, D. C.

20555 M r. Te d Ci n t u la - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

C. S. Nuclear Regulatory Commission 12105 Naticnal Maryi ad Bank Building Washington, D.C.

20555 1

(P Istter)

Mr. Richard Phelps FSV, GA, Site Representative General Atomic Company P. O. Box 426 Platteville, Colorado 80651 Gas Coo le d Re ac to r As s ociate s - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P I4 tte r)

ATTN:

!!r. R. A. Evans 3344 North Torrey Pines Court Suite 300 LaJolla, Califomia 92037 E le c t ri c Powe r Rese arch Ins tit ute - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Istter)

ATTN:

Mr. Nivin E. Lapides 1412 Hillview Avenue P. O. Box 10412 Palo Alto, Califomia 94303 N RC h s i dent S it e In s pe ct o r - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Ietter)

Sen io r Vi ce P re s i den t, Room 7 70 - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter) 1 (P Letter)

Vice President, Production Division, Belleview 1

(P Letter)

Larry Jensen, Auditing, Room 5 30 Ga ry he ve s, P ubli c b la t ion s, Room 95 0 - - - - - - - - - - - - - - - - - - - - - 1 (original of Meco)

Bill Shinkle, P rope rty Accomtin g Holly Se rvice Cente r - - - - - - - - - - - - - 1 (Original of Memo)

Q uality As s uran ce Man a ge r - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter) 1 (P Intter)

(

Nuclear Site Engineering Manager I

N ucle ar Enginee ring Divisien Mcnage r Montb allo - - - - - - - - - - - - - - - - - 1 (P let ter)

N ucle a r Se rvi ce s Man age r, Nnt b ello - - - - - - - - - - - - - - - - - - - - - - - 1 (P Ia;ter)

[

l N ucle a r De s i gn Man a ge r, ?bn t ba llo - - - - - - - - - - - - - - - - - - - - - - - - 1 (P I4tter) 1 (P Letter) l Supervisor, Nuclear Licensing, Montbello Do cumen t s Con t ro l Te :hn i ci an, Mon t be llo - - - - - - - - - - - - - - - - - - - - - 2 (2 P Imtters)

NED-Denve r, Co rrespondence Coo rdinat or, Montb ello - - - - - - - - - - - - - - - - 1 (P Letter)

Man a ge r, N ucle a r P ro d uct i m - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

S t a t i on Man a ge r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Imtter) l Te chni cal /Adminis t rative Se rvices Man age r - - - - - - - - - - - - - - - - - - - - 1 (P I4tter) 1 (P le t te r) i PORC Committee 1

(P I4tter) l FSV NFSC Secretary l

[

PFiles-------------------------------------

1 (P Letter) 2 (P Letter) l Record Storage Te chn i c al S e rvi ce s k view - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Le tte r) 1 Grey Book Notebook Mon thly Ope rati on s Folde r - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 1

(P Letter)

Monthly Operating Information Folder 1

(Original of Report and Lthly Operating Information File 1 Copy of P Ietter) e2031oo239 e20305 PDR ADOCK 05000267 R

PDR

!$P-3 Attacanent-sa Issue :

crrur:sc cATA trm; cocxt: No.

50-267

Arg 820305 ccMPLIT 3 sr L. M. McBride tttrucsz 785-2224 cnnnm s;A rs norss 1.

Unit Names Fort St. Vrain

. Reporting Period:

820201 through 820228 3.

Licensed Ther ial Power (Wt):

842 4.

Nameplace Rating (cross We):

342 5.

Oseign Electrical Rating (Net We):

330 6.

Maximuct Dependable Capacity (cross We):

342 7.

Maximum cependable capacity (Net We):

330 8.

If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, cive Reasons:

None 9.

Power Level To L'hich Restricted, If Any (Net We):

231

10. Reasons for Restri:tions, If Any NRC restriction of 70% pending resolution of temperature fluctuations.

This.% nth Year to Date Cumulative

11. aours in Reporting Periaa 672.0 1,416.0 23,377
u. su=ner of sours Reactor was critical 101.9 101.9 14,680.3
13. Reactar Reserve Shutdown Hours 0.0 0.0 0.0 14.

nours cenerator on-Line 0.0 0.0 9.908.3

15. cnic Reserve Shutdown Hours 0.0 0.0 0.0 le. crass hermal Energy cenerated (?ss) 0.0 0.0 4,933,944.8
17. cross Electrical Energy cenerated (tmi) 0.0 0.0 1,691,356 13.

sec Electrical Energy cenerated (>*A )

-2.627

-4.577 1.549.682

19. tait service ractor 0.0 0.0 42.4 23.

Unit Availability ractor 0.0 0.0 42.4

21. Unit capacity Factor (Using MDC :let) 0.0 0.0 20.1
. Unit capacity Factor (Using OER Net) 0.0 0.0 20.I
23. Unit Forced Outage Rate O_O 0.0 34.0
4. Shutdowns Scheduled over Next 6 thnths (Type. Cate, and Duration of Zach):

March I, 1982 through W rch 91. 19A3 (50!. 0 hrd for mintenance outage

?*

If Shut Down at End of Report Period. Estimated Jate of Startup March 22. 1982 26.

Units In Test Status (Prior ta Cor=iercial Operation):

Torecast Achieved

stnAL cRI::cA:.: Y N/A N/A I:nt:AL EL c nc: 7 N/A N/A cc?:: tac:x. cPt3An:N N/A N/A

TSP-3 Act achrent-3A AVERACE DAILY tRIIT POWER LEVEL Issue 2 Page 1 of 1 Docket No.

50-267 Unic Fort St. Vrain Date 820305 Completed By L. M. McBride Telephone, 785-2224 Month February, 1982 DAY AVERAGE DAILY PO'.4ER LEVEL DAY AVERACE DAILY POWER LEVEL,

(MWe-Ne:)

(%'e-Nec) 1 0.0 17 0.0 2

0.0 18 0.0 3

0.0 19 0.0 4

0.0 20 0.0 5

0.0 21 0.0 6

0.0 22 0.0 7

0.0 23 0.0 8

0.0 24 0.0 9

0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0.0 12 0.0 28 0.0 13 0.0 29 N/A lt.

0.0 30 N/A 15 0.0 31 N/A 16 0.0

  • Cenerator on line but no net generation.

,3 C

1 I

Y ta t

n f

f r

o k

e2 R

,te 1

l t

s e C

- et e F

a et s g R

t a a nAl r g

T j

e_

f t

E g

d V

g i

t.

R y

r F

B n

c 4 O

o T

(

M 2 i

j 5 2

N t

. 2 O

a L0 I

c 3

T 1

p 0 1_

5 C

i A

g 2 u8 f

{ _8 J_

I d

7 E

i V

T o

C m

E f

E f

, WT o

N k

t A

M

)I R

N D

n i

e E

I l

f i

t D

p f

l H

l N

s i

T A

r i

v E

p O

S o

UA o

C L

TN X

E t

X i

X O8' E X

D 4)

X O0 X

I D

I E Y I I

SD B

S_

5O C

M C_

tT 9

O_

l 1_

l E __

R.

X R_

r E_

a M_

u N_

r A

I b

/

)

N_

e N

A_

F_

S_

I N_

i W_

t R

lw_

ri E.

I T_

e U_

m H

F S

r

  1. 3 GN R

I e

!0T T

T I

O

)

IN t

1 TNC 2

1 f L

R 1 l WA El E

in MSI R N

O S

B AE R

0 N

O i

I 2

T 7

A 6

R ts i

E l

S YT 1

0 E

2 T

0 I

2 A

8 6

2 o.

0 N

I B

I b w; OIC 2C?.MA**0N l.

Na=a of 7ac111 -r.

t ?or-3. 't sin Uni: ?to. 1 2.

Scheduled da:a for cas: refueling shutdova.

Oc:cber 1. 1983 3.

Scheduled data for :sstar:

fallevice sfunl1=r.

S.c.-8.- i. toa3 4.

~4111 :sfueling or resumptics of operatica.heraaf:er :squirs a tac W***'

specifica:ica change or other 11cs se amendment?

Yes If answer is yes, wha:, is retersi, vi!! hase be?

Use of tvoe H-451 grachite.

If a:swer i.s so, has :he reload fuel desip and cera c:sfign 2-

1an been :srieved by your Pla==

Safsc7 Ra'riar Cc=mi::se to de ar-

=isa whacher a..7

=rsstaved saf a:7 ques:10:s a:n associa:ad vi:h the ec a ralcad (2efertacs LCC71 See:1cn 50.f91?

If :o such :srisw has :2kas eLace. vben i.s i: scheduled?

5.

Scheduled da:a(s) for subm1::ing proposed 11:ans1:3 acti:n a d sue or-ine inferna:1ce.

Not scheduled at this time: to be determined.

i 5.

Impor:a== 1.1:2= sing ce=sidera-

-ions associa:ad ri.h refueling, s.g.,

saw or di'farenc fuel de-sip or suppliar, u= sviewed design or perfor=a ca analysis

- - - - =

i

=athods, significas: changes 1:

fuel desip, =ev opers:1ng pr:-

cedures.

{

t 7.

The su=ber of fuel asse=blias 1432 3:02 fuel elemen:s l

(a) in :he cora and (b) is

,50 spen: s.02 fuel ele en:s

.%.e scene

,.ue._,

stersgs ce.,.

3.

Se present lice = sed spen: fuel

col s
:: age capaci:7 and the Capaci:7 is '.i=1:ad in si:e :o abou: : e-size :f any inernase is lica: sed

-hird of ::: (2pprox1=a:aly 500 3:01 i

storage capaci:7 :ha: ha.s been ele =e=:3),

no change is planned.

l l'

squas:ad :: is pla= ed, is j

f

-+-her of f.:ei asse clies.

1 j

REFUELING I!TFORMATION (CONTINUE 0) i i

l

~ 1992 under Agreements AT(04-3)-633 and i

j 9.

The projected date of the last refueling that can be DE-SC07-79ID01370 between Public Service discharged to the spent fuel i Company of Colorado, General Atomic l

pool assuming the present l Company,andDOE.*

licensed capacity.

I i

  • The 1992 estimated date is based on the understand 4ng that spent fuel discharged during the term of the Agreements will be stored by DOE.at the Idaho Cliemical Processing Plant. The storage capacity has evidently 4

been sized to accomodate eight fuel segments.

It is estimated that the l

eighth fuel segment will be discharged in 1992.

I 1

4 I

3 2

1 4

1 I

i 4

i L,.

..L

., ~ -. -..