ML20041E183

From kanterella
Jump to navigation Jump to search
Interim Part 21 Rept Re Burrs Fastened to Metal Underneath Shoulder on Inside of Control Rod Drive Housing Assemblies,Initially Reported on 820126.Burrs Removed. Surface Finish Will Be Inspected.Next Rept Due by 820624
ML20041E183
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/25/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82-565-000 10CFR-50.55E, EF2-55876, PT21-82-565, PT21-82-565-000, NUDOCS 8203100227
Download: ML20041E183 (2)


Text

-

.= ~.

t Donald A. Wells t

ff rm O mt i em vte 01 M n! '*M 7000 Second Aven Ed= son ww ue i

1 February 25, 1982 1

EF2-55876 t-Q,k 9 19 N.Ili i

/

Mr. James G. Keppler, Diructor S,

frg y',,

l Region III Ce,'d 8 f Q,,. IO

['

U.S. NucIcar Regulatory Camission f"Y ' 'N. 'M8g 799 Roosevelt Road N

8 Glen Ellyn, Illinois 60127

'\\

Interim Report of 10CFR50.55(e) Item on Control Rod Driv'cL}CRD))g

Subject:

IIousing Assenblics (#51) g dgp

Dear Mr. Keppler:

On January 26, 1982, Detroit Edison's Mr. II.A. Walker, Supervisor-Con-struction Quality Assurance, telephoned Mr. J. Konklin of NRC-Region III, to report on a problem with Control Rod Drive (CRD) llousing Assemblies at the Fermi 2 site.

Detroit Edison had noted chips or burrs on the inside of the CRD housing ascomblies. These burrs were fastened to the metal underneath the shoulder on the inside of the CRD assemblies, and appeared to be a lack of ccuplete machining of the inside surface. These irregularities did not affect the i

mating of the CRD thcImal sleeve assembly which fits inside in contact with this surface. General Electric indicated that these irregularities do not appear to be nonconformances. These burrs or chips have been removed and the surfaces..111 be inspected to insure that they meet surface finish re-quirements after the removal.

Another report on this item, either interhn or final, is scheduled to be 1

sent to you on or before June 24, 1982. If you have questions concerning this matter, please contact Mr. II.A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours, I

j

)

DAW /IIAW/cp I

i JJ/7 8903100227 820225 PDR ADOCK 05000341 MSE 41982'l S

PDR

/

Mr. James G. Keppler, Director February 25, 1982 Page Two EF2-55876 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcenent Division of Reactor Inspection Programs U.S. Nuclear Regulatory Ccmnission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccmnission Resident Inspector's Office 6450 North Dixie Highway Newport, Michigan 48166 l

l l

i l

l l

t l

i