ML20041E136
| ML20041E136 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/01/1982 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | James Keppler, Kepplerr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20041E137 | List: |
| References | |
| NUDOCS 8203100177 | |
| Download: ML20041E136 (1) | |
Text
,
^
i%sconsin Elecinc romcoww 231 W. MICHICAN. P.O. BOX 2046. MitWAUKEE, WI 53201 March 1, 1982 Mr. J. G. Keppler, Regional e - N Administrator
.p
,D Office of Inspection and Enforcement, s
Region III y
QCA d
U. S. NUCLEAR REGULATORY COMMISSION
" 3.t 3
!,,p[hfy kS 799 Roosevelt Road 7 8 E
t Glen Ellyn, Illir.ois 60137 p
Dear Mr. Keppler p
ra \\ @
\\
DOCKET NOS. 50-266 AND 50-301 ANNUAL RESULTS AND DATA REPORT POINT TS 1 AND 2 Enclosed herewith are two copies of the Annual Results and Data Report for the Point Beach Nuclear Plant, Units 1 and 2, for the year 1981.
This report is submitted in accordance with Technical Specification 15.6.9.1.B and contains information regarding steam generator inservice inspections, personnel occupational exposures, and descriptions of facility changes, tests, and experiments as required pursuant.to 10 CFR Section 50.59(b).
Very truly yours, S'
h
/,'
Assistant Vic& President C. W. Fay
[
s t
Enclosure Copies to NRC Resident Inspector Director, Office of Inspection' and Enforcement (40 copies) 8203100177 020301 PDR ADOCK 05000266 R